Electrical contractor software for maintenance, testing and inspection contracts

Keep every switchboard, breaker, transformer and UPS on its client's record. Run each test on its cycle and send a signed report after every visit.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by electrical contractors

FieldEx is a field service and asset management (FSM+CMMS) application for electrical maintenance and service contractors. It records each client's switchboards, panelboards, breakers and transformers as assets. Uninterruptible power supply (UPS) systems and lighting get their own records too. FieldEx schedules inspections, thermography and periodic testing by condition and interval. Technicians capture test readings on site. FieldEx turns defects into repair jobs and sends the client a signed report.

What FieldEx does for electrical maintenance contractors

Electrical maintenance work is judged on two things. Was the equipment tested when its interval said so? Are the readings and defects on paper when someone asks? FieldEx keeps both on the asset, from the first survey to the last remedial job, across every client you service. Book a demo to see it with your own equipment lists, or read our guide to Field Service Management Software.

Every board, breaker and circuit on record

  • A site record for each client location, with its address, map pin, contacts and service zone.
  • The equipment, jobs and plans that belong to each site.
  • An asset record for each switchboard, panelboard, busway and transformer.
  • The same record for each breaker, UPS, generator and distribution board, in Asset Management.
  • Ratings, serial numbers and photos on each record, plus warranty details and attached single-line drawings.
  • Parent and component levels, so a switchboard keeps its breakers and protective devices under it, each with its own history.
  • A status per asset type, such as in service, isolated or awaiting repair, and a change history showing who edited what and when.

Maintenance cycles set by condition and interval

  • Asset maintenance plans and site maintenance plans that create the visits automatically. The annual survey and the five-yearly test can each have their own checklist and technician.
  • Intervals by day, week, month or year, including quarterly and every 3 years. Each plan runs on a fixed calendar or counts from the last completed visit. Fixed calendar dates apply to time-based plans.
  • Plans that pick up newly installed equipment matching their criteria, and reschedule missed visits after a set overdue period, in Preventive Maintenance.
  • Running-hour or cycle meters on equipment such as UPS units and generators, with plans that trigger on the meter, the calendar or whichever comes first.

Tests, surveys and certificates

  • Recurring inspections per equipment type, from weekly to annual, each linked to its own checklist.
  • Certifications on set frequencies, such as a 5-year condition report or a 2-year relay test. Each one records the certifying body, with the report attached.
  • Certifications show due, overdue and completed status, with reminders before the due date. Inspections show their status and linked checklist., through Compliance Documentation.
  • A dashboard of overdue tests, those due in the next 7 days and those completed in the last 7 days. You can filter it by equipment type, group or service zone.

Readings, defects and remedial work

  • Number fields on the job for readings such as insulation resistance, earth loop impedance, load currents and temperature rise. Technicians enter exact values on site, and each reading is recorded against the job.
  • Thermal images, test sheets and photos attached to the job, with camera photos watermarked and annotated.
  • A failed checklist answer creating the remedial job and its tasks straight away, and booking a retest.
  • Jobs and tasks with an order to follow, such as isolate, test, restore, in Work Order Management. Some tasks must be finished before the job can close.

Qualified people on every job

  • Automatic assignment matches electricians by skill, availability, shift and leave, plus service zone and live location.
  • A drag-and-drop scheduler for exceptions, in Scheduling and Dispatch.
  • High-voltage, testing and inspection jobs that can require their matching skill, so they only reach the people who hold it.
  • Notifications to the technician each time a job is assigned or rescheduled.

On the electrician's phone

  • Each job on the FieldEx Mobile App with the asset's history, its checklist, the readings to enter and the parts in the technician's own stock.
  • Scan a board's QR label to open its record and start its inspection, then capture photos and the client's signature.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • Spare parts used on the job recorded from the technician's own stock, with reorder alerts per stock location, in Spare Parts Inventory.

Your own testers, thermal cameras and vans

  • Insulation testers, loop testers, thermal cameras and relay test sets kept as company assets, with serial numbers and who holds each one.
  • Calibration due dates for each instrument as recurring certifications, with reminders and the certificate on its record.
  • Company vans and workshop equipment on maintenance plans by date or odometer reading.

Reports and contracts for every client

  • A completion PDF for each visit with the equipment, fault, work done and resolution.
  • Parts with quantities and prices, check-in and check-out times, attachments and the client's signature on the same PDF.
  • Maintenance contracts with start and end dates, linked to the assets and plans they cover.
  • Clients seeing their equipment with last-serviced dates and upcoming asset maintenance in a branded Customer Portal.
  • Reports by client, site, equipment type or defect, in Reporting and Analytics. Export them as CSV, Excel or PDF, or email them on a schedule.

FieldEx also runs this kind of work for Building Services Contractors and Facilities, Building Management and Cleaning.

How often should switchboards and panelboards be maintained under NFPA 70B?

Every 12, 36 or 60 months, depending on the board's condition rating. NFPA 70B set these in Table 9.2.2 of its 2023 edition for panelboards and switchboards. The 2026 edition, now current, moved the interval table to Table 9.3.2. Inspection, cleaning, lubrication and electrical testing fall every 60 months in Condition 1. They fall every 36 months in Condition 2 and every 12 months in Condition 3.

What FieldEx does about it

  • Condition on the asset: each board's condition can be recorded as its status, set from the inspection result. The board's current rating is always on its record.
  • Checklist condition grades can update a board’s status and raise follow-up jobs automatically.
  • Five tasks, one visit: visual inspection, cleaning and lubrication run as ordered tasks on the same job. Mechanical inspection and electrical testing follow on that job.
  • Busways and boards together: busway runs can be their own assets under the switchboard they feed, on the same cycle.

What does an NFPA 70B electrical maintenance program need?

An equipment list, a condition assessment, an interval for each item and records that show the work was done. The 2023 edition turned NFPA 70B into a standard, with mandatory language on developing, implementing and running an electrical maintenance program (EMP).

What FieldEx does about it

  • The equipment list: every piece of equipment covered by the program is an asset under its site, filterable by type, status and zone.
  • Intervals written into plans: each item's maintenance and testing interval lives in its plan, with its last and next dates visible.
  • Records the program can point to: the visit's inspection result stays on the asset, and its readings and photos are recorded on the job., ready for a client's or insurer's review.
  • Gaps shown early: the dashboard lists overdue items across every client before the program audit does.

How often should infrared thermography be carried out on electrical equipment?

Every 12 months for most equipment, and every 6 months in poor condition. NFPA 70B, Table 9.2.2 of the 2023 edition, sets infrared thermography for all equipment. The 2026 edition keeps it in Table 9.3.2. It is every 12 months in Condition 1 and 2, and every 6 months in Condition 3. FM's Property Loss Prevention Data Sheet 5-19 covers switchgear and circuit breakers and is written for insurance loss prevention. It asks for thermographic surveys of switchgear and circuit breakers of any size every 1 to 3 years.

What FieldEx does about it

  • A yearly or six-monthly survey: thermography runs as a recurring inspection per equipment type, every 12 or every 6 months.
  • Temperature rise as a number: the hot spot's temperature and the reference reading are entered as number fields against the board or breaker.
  • The image attached: the thermal image and the survey report are attached to the job and shown on its completion PDF.
  • Hot spots become jobs: a fail on the survey checklist raises the remedial job, with a retest booked after the repair.

How often should switchgear and circuit breakers be serviced and tested?

Critical breakers every 3 to 5 years in the insurer's view, and every 12 to 60 months by condition under NFPA 70B. FM Data Sheet 5-19 asks owners to mechanically exercise, inspect, service, lubricate and test all critical circuit breakers every 3 to 5 years. It adds a yearly test for SF6 gas leaks in each switchgear compartment. It also asks for online partial discharge surveys every 1 to 3 years for gear rated 4 kV and above. Under NFPA 70B, switchboard electrical testing falls every 60, 36 or 12 months depending on condition.

What FieldEx does about it

  • Critical breakers flagged: group breakers by category, such as critical or standard, and add only the critical ones to the 3-to-5-year plan.
  • SF6 checks each year: each gas-insulated compartment carries its own annual inspection with the leak test result recorded.
  • Partial discharge on its own cycle: the partial discharge survey runs as a separate recurring record for medium-voltage gear.
  • Breaker history: every exercise, test, trip and repair stays on the breaker's record, with its parent switchboard.

What maintenance and test records should an electrical contractor keep?

An equipment register, inspection and test records, defect and repair registers, and records for your own instruments, kept for the system's working life. The UK Health and Safety Executive's HSR25 guidance says that keeping records is not a legal requirement. But maintenance records, including test results, are best kept for the working life of the system. They help show compliance and track equipment condition. The IET's factsheet lists what the record-keeping system should include:

  • an equipment register
  • formal inspection and test records
  • equipment labeling
  • a faulty equipment register
  • a repair register
  • records for the test instruments themselves.

What FieldEx does about it

  • The equipment register: every asset with its identifiers, ratings, location and status. You can export it as CSV, Excel or PDF.
  • Labels on every item: QR or barcode labels printed for each asset in the format and layout you choose.
  • Faults and repairs in one history: every fault and repair job stays on the asset. The faulty equipment register and the repair register come from the same records.
  • Test instruments tracked too: your own testers and meters can be assets with their calibration due dates as certifications, and the certificate attached.

How often does a fixed installation need an EICR, and is every socket tested?

At the interval the inspector recommends, and the Electrical Installation Condition Report (EICR) covers only the extent agreed with the client. Electrical Safety First's Best Practice Guide 4 notes that BS 7671 regulation 135.1 recommends periodic inspection and testing for every installation. The report must state the extent inspected and tested, and any limitations agreed with the client. Singapore sets a fixed cycle. The Energy Market Authority (EMA) requires each licensed installation to be inspected and certified at least once a year by its licensed electrical worker. Multi-tenanted buildings are inspected every 6 months.

  • maintenance and repair
  • overhaul and service
  • calibration, testing and commissioning of any installation or equipment
  • locating cable faults.

Suruhanjaya Tenaga's ECOS contractor registration page lists Electrical Services Contractors under regulation 71. It lists Electrical Contractors under regulation 75, and its guideline puts work above RM1 million in Class A.

What FieldEx does about it

  • A certification per installation: each installation's EICR or yearly inspection runs as a recurring certification with its due date, reminders and the report attached.
  • Shorter intervals when advised: where the inspector sets a shorter interval, the certification's frequency is changed on that installation only.
  • Circuits as components: circuits can be recorded under their distribution board, so the sample inspected on each visit is clear.
  • More tests when defects show: a failed sample answer can create a follow-up inspection for the wider check.

What do C1, C2 and C3 classification codes mean on a condition report?

C1 means danger is present, C2 potentially dangerous and C3 improvement recommended. Electrical Safety First's Best Practice Guide 4 explains the codes. For C1, the client must be told immediately. C2 is for items that are potentially dangerous. C3 is for items that are neither dangerous nor potentially dangerous but where improvement is recommended. C3 items are listed in the inspection or test results schedule.

What FieldEx does about it

  • A code per finding: the inspection checklist can record each observation's classification as a single-select answer.
  • C1 and C2 raise jobs: answers coded C1 or C2 create the remedial job straight away. A C1 can notify the client and your supervisor at once.
  • C3s kept for the next quote: improvement items stay on the asset, ready to include in the client's next proposal.
  • Codes reported: reports group findings by code, client and site, so open dangerous items are never hidden in a PDF.

How often should portable appliances be inspected and tested?

At intervals set by the type of equipment and how it is used, not every year by default. HSE's leaflet INDG236 on maintaining portable electrical equipment says the law requires equipment that can cause danger to be maintained. It doesn't say how or how often. It suggests first visual inspections at intervals between 6 months and 4 years, depending on the type of equipment. HSE's portable appliance testing (PAT) FAQ is direct: the law doesn't make testing a legal requirement, and doesn't require it to be done every year.

What FieldEx does about it

  • Frequencies by appliance type: inspections are set per asset type, so a site's kettles and its office printers follow different cycles.
  • Appliances in bulk: appliances can be uploaded in bulk and grouped under the client's site.
  • Pass, fail and retest: each appliance's result is stored on its record, and a fail raises the repair or replacement job.

How often should RCDs be tested?

Press the test button about every 6 months, or monthly where the local regulator asks. Electrical Safety First says all fixed and socket residual current devices (RCDs) should be tested about every 6 months. You hold down the test button and check that the supply switches off. Singapore's Energy Market Authority asks users to test their residual current circuit breaker (RCCB) once a month.

What FieldEx does about it

  • A six-monthly RCD round: each board's RCD test runs as a recurring six-monthly inspection with its own checklist.
  • Trip times recorded: where the RCD is tested with an instrument, the trip time is entered as a number field.
  • Failed devices replaced: a failed test raises the replacement job, with the new device's details added to the board.

How often must lockout/tagout procedures be inspected?

At least once a year. The US Occupational Safety and Health Administration's lockout rule, 29 CFR 1910.147, requires the employer to inspect each energy control procedure at least annually. The inspection makes sure the procedure and the standard are being followed. The rule adds that the certification of that inspection must identify the machine or equipment, the date of the inspection and the employees included.

What FieldEx does about it

  • An annual inspection per procedure: each energy control procedure can be its own recurring inspection on the equipment it covers.
  • The certification details captured: the inspection records the equipment, the date, the technician who did it and remarks naming the employees included.
  • Isolation steps enforced on the job: isolation tasks can be required before the rest of the job can be closed.

How often must short-circuit, coordination and arc flash studies be updated?

Every 5 years at most. NFPA 70B chapter 6 sets mandatory intervals for studies that must not exceed 5 years. These include short-circuit studies in section 6.3, coordination studies in section 6.4 and incident energy analysis in section 6.7.

What FieldEx does about it

  • A five-year certification per installation: each study runs as a recurring certification on the installation's main switchboard asset, with the study report attached.
  • Reminders ahead of the update: they go out before each study is due, by email, in the app or both.
  • Labels updated with the study: a relabeling job can follow each new study, with the new label photographed on every board.

How often must an electrical contractor's own test instruments be calibrated?

At an interval that keeps each instrument accurate, with the calibration record ready to show. NFPA 70B requires measuring test equipment to be calibrated, with calibration information readily available. Calibration intervals must be appropriate to ensure accuracy. The IET's factsheet lists records for the test instruments themselves as part of a contractor's record-keeping system.

What FieldEx does about it

  • Instruments as assets: each insulation tester, loop tester, thermal camera and relay test set has its own record, with serial number and holder.
  • Calibration that doesn't lapse: each instrument's calibration runs as a recurring certification with reminders, and the certificate is filed on the record.
  • Instruments named on test records: the instrument used can be recorded on each test job, so a recalled tester can be traced to its jobs.
  • Vans on plans: each company van follows a service plan by date or odometer reading.

How often should an electrical contractor's own vans and test instruments be checked?

Commercial vans go to PUSPAKOM every 6 months, and each tester follows its calibration interval. PUSPAKOM's inspection guide says the Road Transport Act 1987 requires all commercial vehicles to undergo a routine inspection every 6 months. Under regulation 110(4) of the Electricity Regulations, protective relays are calibrated at least every 2 years. The relay test set used for that work needs a current calibration of its own.

What FieldEx does about it

  • Testers with calibration dates: each insulation tester, earth tester and relay test set has its own record and calibration certification, with reminders.
  • The instrument on the job: the tester used can be noted on each test job, so its calibration can be shown with the results.
  • Vans on two cycles: each van's servicing runs on a plan by date or odometer reading, and its six-monthly inspection runs as a recurring certification.
Customer story

AlanDick is a radio frequency (RF) and telecom infrastructure services company in Brunei. It sends up to 26 people a day to onshore and offshore sites with FieldEx. It's a different trade, but the same work: qualified people, inspected tools and renewed certifications on every job. Its story describes jobs assigned by skill, availability and proximity, and tool inspections and procedure audits scheduled with reminders. Staff certification renewals are tracked, and clients follow service progress in the portal.

Read the AlanDick Story

Sime Industrial supplies, services and rents heavy equipment to the construction, mining and energy sectors. It runs its field service team on FieldEx. It's a different industry, but the same need: one record of every technician's jobs, time and location across many sites. Before the switch, planners tracked jobs and mileage claims across Excel and WhatsApp. Its story describes one place for job updates, statuses and time logs, with live technician locations beside task progress. Management reports now take a few clicks.

Read the Sime Industrial Story

Questions electrical service contractors ask about FieldEx

What is the best electrical contractor software for maintenance and testing work?

For service and maintenance contracts, it has to cover the equipment records, test cycles and readings described above. In FieldEx, field service and maintenance management share the same asset records, so a breakdown call and a planned test sit on one history. See our guide to CMMS Software.

Can technicians enter insulation resistance and other test readings on site?

Yes. Number fields on the job capture readings as exact values, recorded against the board or circuit tested.

Can FieldEx schedule maintenance by equipment condition?

Yes. Each asset's condition can be its status, and each plan can drop equipment automatically when its status changes, and pick up new equipment that matches its status.

Can a failed test create the remedial job automatically?

Yes. Beyond the remedial job, FieldEx can notify the people you choose and book a retest.

Can we track 5-year EICRs and 2-year relay tests for every client?

Yes, as the EICR section shows. Reports also list every client's certifications falling due by month, so the work can be quoted ahead.

Can FieldEx send high-voltage jobs only to authorized engineers?

Yes. Each job type can require a matching skill, and assignment rules only offer the job to technicians who hold it.

Can our clients see their equipment and test reports?

Yes. The branded customer portal shows each client its registered equipment, last-serviced dates, upcoming asset maintenance and downloadable job reports.

Can we track the calibration of our own test instruments?

Yes, as the test instrument section shows. The dashboard also lists instruments whose calibration is due in the next 7 days.

Can electricians work in switchrooms and substations without a signal?

Yes. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

How long does it take to get FieldEx running for an electrical contractor?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Client sites and equipment can be uploaded. FieldEx helps with setup, and training is included. See Setup and Training.

Run every electrical maintenance contract, test cycle and defect from one system

Book a Demo