Electric utility software for distribution patrols, substations, street lighting and fault crews

Inspection cycles for every pole, transformer and switch, restoration clocks that match service standards, and meter and streetlight work, on one located record per asset.

Book a demo
Updated 15 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by electric utility field crews

FieldEx is electric utility software for the distribution network beyond the power station, combining field service management with maintenance management (CMMS). Every pole, transformer, switch, streetlight and meter gets a located record; patrols and inspections run on cycle; fault restoration is timed against service standards; and line crews and contractors receive their work on the phone.

What FieldEx does for electric utility distribution and field teams

A distribution network is hundreds of thousands of assets spread across a service area, each with its own inspection cycle and failure risk. FieldEx plans the patrols, inspections and repairs on those assets, and the customer and street lighting work that comes with them. Book a demo and bring a feeder's worth of assets.

The network on located records

  • Poles, overhead transformers, pad-mounted transformers, switches, reclosers, capacitors, substations, streetlights and meters each on their own record, in asset management.
  • Each record carries asset number, rating, install date, photos and latitude and longitude.
  • Substations as parent assets, with transformers, switchgear, batteries and protection relays as components.
  • Your own identifiers, such as pole number, feeder or circuit, in renamed identifier fields.

Patrol, inspection and maintenance cycles

  • Patrol, detailed inspection and pole test plans that raise jobs automatically on their cycles, in preventive maintenance.
  • Different cycles for urban and rural areas, overhead and underground equipment.
  • Plans applied to a whole district or asset type, picking up new assets as they're added.
  • Overdue inspections rescheduled automatically after the period you set.

Faults and restoration

  • Outage, damaged-pole and broken-streetlight reports from customers, sent in through a QR form or the portal and opened as jobs.
  • Service-level agreement (SLA) timers for each stage of a fault, from attend to make safe to restore, warning before a breach, in scheduling and dispatch.
  • The right line crew chosen on skill, availability, shift, leave, zone and where each crew is now.
  • Crews moved from planned work to storm faults by dragging their jobs on the scheduler.

Meters and customer connections

  • Meter installations, exchanges and tests raised in bulk from an uploaded list of meters or addresses.
  • Old and new meter details and readings entered by the technician on the job form.
  • Each meter's install date, location and every change kept on its record.

Street lighting

  • Each streetlight or lighting circuit as an asset, with lamp type, pole and location.
  • Night patrols and lamp replacement programmes raised on their cycles.
  • Outage reports timed against your repair targets, with emergency and standard priorities.

Line crews, contractors and qualifications

  • Line clearance, civil and meter contractors working in their own logins, seeing only their jobs.
  • Qualifications such as qualified electrical worker, switching authorisation or tree-trimming certification held as skills, each with an expiry date.
  • Jobs assigned only to crews holding the right skill.
  • Each technician sets the app to English, Bahasa Malaysia or Chinese.

Depots, stores and vehicles

  • Stock held in each depot store and each truck, with transfers and approvals, in spare parts inventory.
  • Fuses, lamps, connectors, insulators and meters with movement history and low-stock alerts.
  • Depot buildings, plant and line trucks as assets with their own maintenance plans.

Reports for operations and the regulator

  • A completion PDF for each job, with the asset, work carried out, parts, times on site, photos and signature.
  • MTBF, MTTR and downtime per asset, and repeat faults flagged on the same asset.
  • Inspections completed and outstanding, by district, asset type or contractor, in reporting and analytics.

How often must distribution equipment be patrolled and inspected?

The California Public Utilities Commission's (CPUC) General Order 165 sets maximum intervals for distribution inspections. Patrols are needed every year in urban areas and every two years in rural areas. Detailed inspections are due every five years for overhead and pad-mounted equipment, and every three years for underground equipment.

Equipment (GO 165)Patrol urban / ruralDetailed inspection
Overhead transformers, switches, conductors1 / 2 years5 years
Underground transformers and switches1 / 2 years3 years
Pad-mounted equipment1 / 2 years5 years
Street lighting1 / 2 yearsNot set
Wood poles over 15 years, not yet tested1 / 2 yearsIntrusive test within 10 years

Source: CPUC General Order 165, Table 1.

GO 165 counts a "year" as 12 months from the first full month after the last inspection, plus or minus two months. A utility subject to GO 165 must report completed and outstanding inspections every year.

GSL2 situationRestore within
Low voltage fault3 hours
Medium voltage breakdown, listed cities3 hours
Medium voltage breakdown, other areas4 hours
Medium voltage breakdown, no alternative feed12 hours

Sources: Suruhanjaya Tenaga, Performance Standard of TNB; TNB, GSL and MSL.

What FieldEx does about it

  • Each class on its own cycle: overhead, underground and pad-mounted equipment can each run a plan with the right interval.
  • Urban and rural apart: plans applied by district let rural areas run a two-year patrol while urban areas run yearly.
  • Counting from the last visit: schedules counting from the last completed inspection keep each asset inside its window.
  • Outstanding work visible: reports show inspections completed and still outstanding, by district and asset type.

What's the difference between a patrol, a detailed inspection and an intrusive inspection?

GO 165 defines all three. A patrol is a simple visual inspection to find obvious structural problems and hazards. A detailed inspection examines individual pieces of equipment carefully, visually and with routine diagnostic tests, opening them where practical, and rates and records the condition of each one.

An intrusive inspection involves moving soil, taking samples for analysis or using diagnostic tools beyond visual checks and instrument readings. Wood poles that pass an intrusive inspection are retested within 20 years.

The CPUC adds that detailed inspection records must show each item's condition, any problems found and a scheduled date for corrective action.

Installation voltageMinimum visits a month
Up to 600 V, fed through 100 A or larger switchgear1
Over 600 V up to 11 kV2
Over 11 kV up to 132 kV4

Source: Electricity Regulations 1994, regulation 67.

What FieldEx does about it

  • Three checklists for three depths: patrol, detailed and intrusive inspections each open their own checklist on the asset.
  • Condition rated and recorded: the detailed inspection checklist records a condition for each item, and photos are attached to the job.
  • Corrective work with a date: a failed item raises the corrective job, scheduled with its own due date.
  • Readings where needed: custom job forms, set up with you during onboarding, can include number fields for test readings, recorded against the job.

How fast must power be restored after a fault?

In Great Britain, Ofgem's Guaranteed Standards of Performance set restoration times for distribution network operators. Under normal weather, supply must be restored within 12 hours of the operator becoming aware of the problem. Where 5,000 or more premises are cut off by one incident, the limit is 24 hours.

If an operator misses the standard, it pays the customer. Ofgem's 2026 update sets £100 for a domestic customer and £195 for a non-domestic customer after 12 hours, plus £45 for each further 12 hours. National Grid explains that severe weather categories extend the limit to 24 or 48 hours.

Situation (Ofgem)Restore within
Normal weather, under 5,000 premises affected12 hours
Normal weather, 5,000 or more premises affected24 hours
Severe weather, category 124 hours
Severe weather, category 248 hours

Sources: Ofgem GSOP payment update 2026; National Grid standards of performance.

What FieldEx does about it

  • Targets that mirror the regulator's: the fault's SLA carries separate targets for reaching the site, isolating and restoring, and warns planners before any of them is missed.
  • Crews nearest the fault: automatic assignment uses skill, availability and live location to send the closest qualified crew.
  • Proof of restoration time: the crew's arrival and departure times, photos and completion report record the moment supply returned.
  • Storm surges handled: planners drag crews from planned work onto faults on the scheduler, and the crews are notified.

How quickly should streetlight outages be repaired?

There is no national standard; cities set their own. The City of Phoenix's 311 service says a standard streetlight repair takes 7 to 10 business days, and power faults can take 6 to 8 weeks. The City of Denton's maintenance contract asks the contractor to respond to light-out calls within eight hours or one business day, and to repair within 72 hours.

ClassWork valueFull-time wiremen (from ST's ECOS page)
AAbove RM1 million1 PW4, 2 PW3, 2 PW1
BUp to RM1 million1 PW4, 1 PW3, 1 PW1
CUp to RM500,0001 PW4
DUp to RM100,0001 PW2

Sources: Electricity Regulations 1994; ST ECOS contractor registration.

In Denton's contract, extensive repairs must be done within 14 days of knowing about the outage, and emergencies need a response within two hours. San Diego's audit found the city's goal was an average repair time of 12 days or less, and that it was missed in two consecutive years.

What FieldEx does about it

  • Targets per priority: emergency and standard streetlight jobs run different SLA clocks, from two hours to 14 days.
  • Reports from the street: residents or patrol crews report outages, and each report arrives as a job for that location.
  • Lamps on the truck: lamps, photocells and drivers are held in each truck's stock, so a repair doesn't wait for a second trip.
  • Average repair time measured: reports show repair times by area and contractor, so goals can be checked.

How often should substation and depot switchgear be maintained?

NFPA 70B, the US Standard for Electrical Equipment Maintenance, became mandatory in its 2023 edition. Where the manufacturer gives no guidance, its Table 9.2.2 sets maximum intervals based on the equipment's condition, criticality and operating environment. Eaton's guide to the standard explains that the worst of the three sets the interval.

For switchgear, a visual inspection is due every 12 months for condition 1 or 2 equipment and every six months for condition 3. Cleaning, servicing and electrical testing are due every 60, 36 or 12 months. Infrared thermography is required every 12 months, or six months for condition 3.

Switchgear task (NFPA 70B)Condition 1Condition 2Condition 3
Visual inspection12 months12 months6 months
Cleaning, servicing, electrical testing60 months36 months12 months
Infrared thermography12 months12 months6 months

Source: Eaton, NFPA 70B guide book.

What FieldEx does about it

  • Condition decides the plan: move equipment between 60-, 36- and 12-month plans when its condition rating changes.
  • Thermography on its own cycle: the infrared survey runs as a separate yearly or six-monthly plan.
  • Hot spots become repairs: a failed thermography item raises the corrective job with photos attached.
  • Temperatures recorded: custom job forms can include number fields for hot-spot temperatures, recorded against the job.

What training must line and substation workers have?

OSHA's rule 29 CFR 1910.269 covers the operation and maintenance of electric power generation, transmission and distribution. Every employee must be trained in the safety practices that apply to their job. Only qualified employees may work on or with exposed energized lines or parts.

Qualified employees must be able to tell exposed live parts from other parts, determine nominal voltages and keep minimum approach distances. Employers must check compliance through regular supervision and inspections at least once a year. Employees must show they're proficient before their training counts as complete.

What FieldEx does about it

  • Qualifications on every crew member: qualified electrical worker status and other authorisations are skills with expiry dates.
  • Energized work only for the qualified: jobs on live equipment go only to people holding the right skill.
  • Annual field checks scheduled: the yearly supervisor observation can run as a recurring job with its own checklist.
  • Records of each check: completed observations stay on record with the date, supervisor and findings.

What records must a utility keep for distribution inspections?

GO 165 requires utilities to keep patrol and detailed inspection records for at least ten years, and intrusive inspection records for the life of the pole. Each utility files an annual report listing completed and outstanding inspections.

PG&E's 2025 GO 165 report shows why the detail matters. Three overhead detailed inspections were reported late after a check found an inspector had uploaded photos for the wrong asset. The reinspection was done the same day, but the record still counted as late.

Photos tied to the wrong asset make a completed inspection worthless. Capture them on the asset itself.

What FieldEx does about it

  • Photos taken on the asset's job: watermarked photos are captured inside the inspection job for that asset, with time and place.
  • Records that last: inspections stay on each asset's record for as long as you need them.
  • Annual counts on demand: reports show completed and outstanding inspections by type for the reporting period.
  • Location to back it up: check-in on the job shows the inspector was at the asset.

How should a meter exchange programme be run?

Meter exchanges, from old electromechanical meters to smart meters or from failed meters to new ones, are high-volume, address-by-address work. Every exchange needs the old meter's final reading, the new meter's serial number and start reading, photos and access arrangements.

  1. Upload the list of meters or addresses for the programme.
  2. FieldEx creates a job for each and groups them by zone.
  3. Technicians record the old and new meter details and readings on the job form.
  4. Each meter's record keeps its full history.

What FieldEx does about it

  • Thousands of jobs in one upload: exchanges are raised in bulk from an uploaded list.
  • Readings entered on site: technicians enter final and start readings on custom job forms, recorded against the job.
  • No-access visits recorded: a failed visit is recorded with a reason and photo, and a return visit is raised.
  • Progress by zone: reports show exchanges completed, outstanding and failed, by zone or contractor.

How do utility crews and contractors work from the same jobs?

In FieldEx, utility crews and contractors work from the same job and the same asset record, and each party sees only what it needs. Contractor work such as line clearance, streetlight repairs, civil works or meter exchanges lands on the utility's asset history as soon as it's completed, without a separate system.

What FieldEx does about it

  • Contractors in their own logins: each contractor sees only the jobs that involve them, controlled by roles and a hierarchy.
  • The same checklist for everyone: contractor crews complete the same inspection checklists and photos as your own.
  • Work on your asset records: completed contractor jobs appear on the asset's history straight away.
  • Contractor performance compared: SLA results and repeat faults by contractor show who delivers.

Questions electric utility teams ask about FieldEx

What software do electric utilities use for distribution maintenance and field crews?

Utilities pair their network records with software that plans and records the field work. FieldEx handles the field work itself, from located pole, transformer and streetlight records to inspection cycles, restoration timers and contractor logins. For a wider comparison, read our guide to CMMS software.

Can FieldEx run different inspection cycles for urban and rural areas?

Yes. Plans can be applied by district or asset type, each with its own interval, and new assets in that district pick up the right plan.

Can FieldEx time outage restoration against service standards?

Yes. A fault's SLA can hold a target for each stage up to restoration, set per customer, site or asset, and alerts go out before any target is missed.

Can residents report a streetlight outage?

Yes. A QR code at a site opens a short form with no login, and the report becomes a job for that site. Portal users can also raise requests and follow progress.

Can FieldEx create jobs for a whole meter exchange programme?

Yes. One upload of the programme's meter list gives you a job per meter, which planners then schedule zone by zone.

Can we track crews' qualifications and authorisations?

Yes. Name a skill after the qualification and give it an expiry date. Jobs that need it go only to people holding it.

Can our contractors see only the work we give them?

Yes. Each contractor logs in to its own account, and roles plus a hierarchy keep it to the jobs it's assigned.

Can each substation keep its components' histories separately?

Yes. Transformers, switchgear, batteries and relays sit as components under the substation, each with its own history and plans.

Can crews work offline in rural areas?

Yes. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced when the phone reconnects.

How long does it take an electric utility to go live?

There's no setup fee: setup, data upload and training are part of the subscription. Your asset lists, sites and earlier jobs can be uploaded. FieldEx helps with setup, and training is included.

Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. See FieldEx implementation.

Bring one feeder or district of your network to the demo