Hotel maintenance software for guest rooms, plant and safety checks

Log each guest room fault when the front desk hears of it, and run the water, pool, fire and plant checks hotels can't skip.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by hotel engineering teams

FieldEx is a field service and asset management (FSM+CMMS) application for hotel, resort and serviced apartment engineering teams. It turns guest room faults into tracked jobs. FieldEx schedules planned preventive maintenance (PPM) for boilers, chillers, pumps and kitchens. It records water and temperature readings and keeps fire, lift and legionella records for each property.

What FieldEx does for hotel engineering teams

A hotel engineering team works two shifts at once. One is the room that has to be fixed before the guest checks in. The other is the plant that has to keep running whether rooms are full or empty. FieldEx keeps both on each property's own records. The guest's dripping tap, the weekly flush of an empty room and the boiler's annual service are tracked the same way. Book a demo with one of your properties.

Properties, rooms and plant on record

  • A site for every hotel or resort, with its address, map location, contacts and attached floor plans.
  • Assets for the plant that matters: boilers, calorifiers, chillers, cooling towers and pumps.
  • Assets for lifts, kitchen extract systems, pool plant and, where useful, each guest room.
  • Photos, warranty and documents on each asset, in Asset Management.
  • Parent and component levels, so a guest room and its air conditioning unit, minibar fridge and shower each keep their own history.
  • QR labels on rooms and plant, so a technician scans to open the record, its checklist or a new job.
  • QR stickers on rooms and plant for quick scanning by technicians.

Guest room faults, logged and closed

  • Faults logged by the front desk or housekeeping as jobs in seconds, with photos and the room as the asset.
  • A QR code on an asset or a property that opens a request form without logging in. Staff or guests use it, and each request arrives as a job in the backlog.
  • A notice when a new job repeats a recent job on the same room or asset, so recurring faults get a proper fix.
  • Service-level agreements on the property's hours, with stages and alerts before a target is missed.

Planned maintenance for plant and rooms

  • Asset maintenance plans for boilers, chillers, pumps and kitchen equipment, in Preventive Maintenance.
  • Site maintenance plans for rounds such as weekly flushing or monthly emergency lighting checks.
  • Schedules from daily to multi-year, on a fixed calendar or counted from the last visit, with triggers on running hours where plant has meters.
  • One plan applied across many rooms or many properties, picking up new assets that match its criteria.
  • Missed visits rescheduled automatically after a set overdue period.

Water, pool and food safety readings

  • Number fields on the job for readings such as hot and cold water temperatures, pool and spa pH and disinfectant levels.
  • Temperatures from fridges and cold rooms recorded as meter readings, building a time-stamped history on each unit.
  • A failed or out-of-range answer on the checklist raising the corrective job straight away.
  • A dashboard per hotel of what is overdue and due in the next 7 days.

Fire, lift and statutory records

  • Recurring certifications and inspections per asset type on set frequencies, with due, overdue and completed status, and reminders on certifications.
  • The date, the person, the result and the certificate or report attached, through Compliance Documentation.
  • A dashboard of overdue checks, those due in the next 7 days and those completed in the last 7 days, per property.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • An engineering store and each technician's own stock, with reorder alerts and parts booked to each job, in Spare Parts Inventory.

Engineers on shift

  • Jobs assigned automatically by skill, availability, shift and leave, or by service zone.
  • Jobs dragged onto a technician's calendar, through Work Order Management.
  • The FieldEx Mobile App with the job, the asset's history, checklists, watermarked photos and a signature.
  • Spare parts held in the engineering store and each technician's own stock, with reorder alerts and parts booked to the job.

The hotel's own tools, equipment and vehicles

  • Engineering tools, test meters, portable appliances and shuttle vehicles kept as assets, each with its serial number and location.
  • Inspection and calibration due dates for the hotel's tools and equipment as recurring certifications, with reminders and the certificate on file.
  • Maintenance plans for hotel vehicles by date or odometer reading, and workshop machines on their own plans.

Reports for the general manager and owners

  • Reports on room faults by floor or type, response times, PPM completed against scheduled, and maintenance cost per asset and property.
  • A completion PDF for each job with the work done, parts, photos and time on site.
  • Reports exported as CSV, Excel or PDF, or emailed on a schedule to each property's management, in Reporting and Analytics.

FieldEx also runs this kind of work for Retail, Food & Beverage Equipment, Pest Control and Agriculture & Estate.

How often should showers and taps in empty hotel rooms be flushed?

Flush the taps and showers in empty guest rooms at least once a week, and always before a room is occupied. The European Centre for Disease Prevention and Control's guidance for tourist accommodation (ECDC) says to run them for several minutes. The UK Health and Safety Executive (HSE) makes the same point in HSG274 Part 2. When outlets are not in regular use, weekly flushing for several minutes can significantly reduce the risk of legionella growing in the system.

  • Open-corridor hotels with 100 rooms or more in each block.
  • Hotels of two to three stories with 101 rooms or more.
  • Hotels of four stories and above with 51 rooms or more.

Section 28 of the Fire Services Act 1988 makes the certificate renewable every year.

What FieldEx does about it

  • A weekly round per floor or wing: a site maintenance plan raises the weekly flushing round, with each room's outlets on the checklist.
  • Rooms as assets: each room can carry its own record, so a flush, a fault or a temperature reading is logged against the right room.
  • Proof the round was done: the technician's check-in and check-out times, checklist answers and notes are recorded on the job.
  • Before a room reopens: a one-off flushing job can be raised on a room's record before it goes back into use.

What legionella controls does a hotel need on its hot water system and cooling towers?

Keep hot water circulating at 50°C to 60°C, clean and disinfect cooling towers at least twice a year, and clean calorifiers once a year. These controls come from ECDC's guidance for tourist accommodation. It adds that tanks, towers and visible pipework are inspected monthly, and calorifiers are drained and disinfected when cleaned. In the United States, the Centers for Disease Control and Prevention's advice for hotel owners (CDC) notes that water management programs are now an industry standard for most hotels.

What FieldEx does about it

  • One plan, several frequencies: the cooling tower's six-monthly clean, the calorifier's annual clean and the monthly visual inspection run as separate visit types. Each has its own checklist.
  • Temperatures as numbers: flow and return temperatures are entered as values on the job, against the calorifier or the outlet.
  • Lab results on file: sample results and certificates are attached to the completed record on the tower or calorifier.

How often must the water in a hotel spa pool or hot tub be tested?

Test a commercial spa pool's pH and disinfectant at opening every day and every 2 hours after that. That is HSE's guidance in HSG282 on spa-pool systems. Domestic-type spa pools and hot tubs are tested at least twice a day. The US CDC's guidance on public pools and hot tubs asks for pH and disinfectant to be tested at least twice a day, and hourly in heavy use. It asks for pH to be kept at 7.0 to 7.8 and for records to be kept.

What FieldEx does about it

  • Record pH, disinfectant and temperature as number fields on a job for each spa test.
  • The manager's check built in: the completed record shows who took each reading and when, and the supervisor's review can be its own task.
  • A failed result starts the fix: a checklist answer that marks the result as failed raises the corrective job with its own steps.

How often should a hotel pool's pH and chlorine be tested, and what records are needed?

Test a hotel pool's pH and disinfectant at least twice a day, and keep a log of every reading and every maintenance task. The US CDC's guidance for public pools says operators should keep pH at 7.0 to 7.8. Operators should keep accurate records of disinfectant and pH measurements and of maintenance activities.

What FieldEx does about it

  • Twice-daily tests on a plan: the pool's morning and afternoon tests run as recurring jobs with number fields for pH and disinfectant.
  • Plant maintenance alongside: filters, pumps and dosing equipment carry their own maintenance plans and history under the pool asset.
  • The log, exportable: report readings and maintenance records by pool and period, and export them as CSV, Excel or PDF.

What weekly, monthly and six-monthly fire checks does a hotel need?

Test the fire alarm weekly, test emergency lighting and fire doors monthly, and have both systems serviced every 6 months. That is the rhythm in the UK government's fire safety guide for sleeping accommodation.

  • Weekly: test fire detection and warning systems, and run fire pumps and standby diesel engines for 30 minutes.
  • Monthly: test all emergency lighting and safety torches for charge and illumination, and check that fire doors close correctly.
  • Six-monthly: a competent person tests and maintains the fire detection and warning system and the emergency lighting.

What FieldEx does about it

  • Every check on its own cycle: weekly alarm tests, weekly pump runs and monthly emergency lighting and fire door checks run as recurring inspections. Six-monthly servicing does too.
  • Fire doors scanned: each fire door carries a QR label, so the technician scans it, answers its checklist and records a failed closer against it.
  • Run times recorded: the 30-minute pump and engine runs are recorded with number fields on the job.
  • Failures fixed: a failed answer raises the corrective job and can book a follow-up inspection.

How often do hotel fire extinguishers and gas heating appliances need servicing?

Check fire extinguishers every month and have a competent person maintain them every year. Gas heating appliances need an annual service too. Both points come from the UK government's fire safety guide for sleeping accommodation. It says a monthly extinguisher check should be enough in normal conditions. It also says gas heating appliances should be used only in line with the manufacturer's instructions and serviced annually by a competent person.

What FieldEx does about it

  • Each unit on record: every extinguisher and gas appliance is an asset with its type, location and service dates.
  • Monthly and annual together: the monthly check runs as an inspection, the annual service as a certification with the competent person recorded.
  • Scan and record: the technician scans the unit's QR label and completes its checklist on the phone.
  • Gas work to gas engineers: gas servicing jobs require their matching skill, so they reach qualified engineers only.

How often should a hotel's passenger lifts be thoroughly examined?

Examine any lift that carries people at least every 6 months, and a goods-only lift every 12 months. HSE's leaflet INDG339 sets these UK intervals, unless an examination scheme drawn up by a competent person says otherwise. The lift owner must make sure the examinations happen at those intervals. A service lift for luggage or laundry that carries staff at any time goes on the six-month cycle.

What FieldEx does about it

  • Six-month or 12-month cycles: each lift's thorough examination runs as a recurring certification with the examining body recorded and the report attached.
  • Monthly servicing on its own plan: the lift contractor's routine visits run as a maintenance plan on the same lift record.
  • Breakdowns against the lift: guest-reported lift faults become jobs on the lift, so repeat failures are visible.

How often should a hotel kitchen's extract hood and ductwork be inspected for grease?

Inspect a high-volume kitchen's extract system every quarter, a moderate-volume one twice a year and a low-volume one once a year. Solid fuel cooking needs a monthly inspection. These frequencies come from NFPA 96, the US National Fire Protection Association's standard for commercial cooking ventilation. It also requires metal-alloy fusible links and sprinklers in the system to be replaced at least twice a year.

What FieldEx does about it

  • Frequency by kitchen: each extract system is an asset with its own inspection frequency, monthly, quarterly, six-monthly or annual.
  • Fusible links on a six-month cycle: the link replacement runs as its own recurring job, with the parts used recorded.
  • Before and after photos: watermarked photos of the hood and duct are attached to each cleaning job.

Which accessible room features must hotel maintenance keep working?

In the United States, a hotel must keep every accessible feature in working order, from accessible rooms to the routes and equipment that serve them. The Department of Justice's ADA Title III regulation, 28 CFR 36.211, covers features of facilities and equipment that must be readily accessible to and usable by people with disabilities. A public accommodation must maintain those features in operable working condition.

What FieldEx does about it

  • Accessible features as assets: accessible rooms, lifts, ramps, door openers and alarms can each be recorded and inspected.
  • Regular checks: a recurring inspection walks the accessible features on a set frequency with its own checklist.
  • Faults fixed fast: a failed feature raises its repair, and a service-level agreement on that job type can set a shorter target.

What temperature should hotel kitchen fridges hold, and how often should they be checked?

Keep chilled food at 8°C or below, set fridges at 5°C or below, and check each unit at least once a day. The UK government's food hygiene guidance on chilling says 8°C is a legal requirement in England, Wales and Northern Ireland. The Food Standards Agency's Safer Food Better Business pack, says chilling equipment should be checked at least once a day.

What FieldEx does about it

  • Temperatures as a history: fridge and cold room temperatures are recorded as meter readings on each unit, building a time-stamped log.
  • Daily checks on a plan: a daily inspection prompts the reading at each unit.
  • Warm units acted on: a failed temperature check on the checklist raises a repair job for the refrigeration engineer.

How quickly should hotel engineering respond to a guest-reported room fault?

Respond to in-room faults within minutes and schedule the rest before the room is next let. No regulation sets the target. The hotel and its brand standards do. Engineering teams usually split faults into two groups. Some affect the guest now, such as no hot water, a failed air conditioner or a door lock fault. Others can wait for the room to be empty.

What FieldEx does about it

  • Two levels of urgency: job types for in-room faults and for deferred work each carry their own service-level agreement and targets.
  • Clock on the property's hours: timers run against business hours that can differ by day, including round-the-clock cover.
  • Alerts to the duty engineer: at-risk and violation alerts go to the assigned engineer, the duty manager or their group.
  • The record afterwards: response and completion times show on each job and in reports by property.

What should a hotel guest room preventive maintenance checklist cover?

Cover everything a guest touches or depends on, and rotate the round floor by floor so only a block of rooms is out of sale at a time. A typical round includes:

  • Door lock and closer, lighting, switches and sockets.
  • Air conditioning filters and drains.
  • Taps, showers, drains, toilet flush and sealant.
  • Windows, balcony doors and furniture fixings.
  • The television and the minibar fridge.

What FieldEx does about it

  • The checklist as a template: each question can have a reference photo. AI can generate the checklist from a PDF or PNG of your existing checklist or procedure, and you then edit it.
  • Room by room: a plan applied to all rooms of a type raises each room's visit on its own schedule.
  • Failed items become jobs: every failed answer creates its job and tasks, so nothing on the round is forgotten.
  • Room histories: each room keeps its own record of PPM rounds, faults and repairs.

How often should a hotel's own portable electrical equipment be inspected and tested?

Give equipment that guests use, such as kettles and hair dryers, a formal visual inspection every 3 months and a combined inspection and test every year. These are the suggested starting intervals in HSE's guidance on work using electrically powered equipment. Staff carry out the user checks. For earthed equipment such as kettles and some floor cleaners, the visual inspection falls every 6 months to 1 year and the test every 1 to 2 years. Extension leads get a visual inspection every year and a test every 2 years.

What FieldEx does about it

  • Each appliance or batch on record: kettles, hair dryers, irons, floor cleaners and engineering power tools can be assets, grouped by floor or store.
  • Two cycles per item: the three-monthly visual inspection runs as a recurring inspection, and the yearly test as a certification with reminders.
  • Failures out of use: a failed check raises a repair or replacement job, and the item's history shows every test.
  • Your test meters too: the engineering team's test instruments carry their calibration due dates as recurring certifications, with the certificate on file.
Customer story

Magnum, a leisure and entertainment brand established in 1968, runs its operational and facility management on FieldEx. Its story describes jobs, inventory logs and reports generated automatically, and reports sent on a set schedule. Service-level agreement tracking alerts the team as deadlines approach. Magnum reports a 25% increase in operational efficiency, with field manpower reduced from 55 to 41 people. It's a leisure business rather than a hotel, but the same problem: facility work on a schedule, with every deadline watched.

Read the Magnum Story

A large facility services company with a regional presence in Singapore runs more than 100 technicians and contractors on FieldEx. Mechanical and electrical maintenance, such as air-conditioning units grouped by floor or brand, runs alongside daily, weekly and monthly housekeeping rosters. Each task is assigned to a named team member at a set time and tracked floor by floor. Technicians close each job with a digital checklist and a PDF report. It's a facility services firm rather than a hotel, but the same pattern: rooms and floors on a fixed roster, with each task assigned and proved.

Read the Facility Services Case Study

Questions hotel engineering managers ask about FieldEx

What is the best hotel maintenance software for an engineering team?

It has to log guest room faults quickly, run PPM for plant and rooms, record readings and keep fire and lift records, as described above. FieldEx also reports by property, so the general manager and the owners see the same figures. Compare approaches in our guide to CMMS Software.

Can the front desk log a room fault without training?

Yes. A fault takes seconds on the web or the app, and the room's QR code opens a short form without logging in.

Can we run legionella flushing for rooms that are empty?

Yes, as a weekly round, described in the flushing section above. A one-off flush can be raised on any room before it reopens.

Can engineers record pool, spa and water temperature readings?

Yes, as number fields on the job, described above. Supervisors can see who took each reading and when.

Can we manage several hotels in one account?

Yes. Each hotel is a site, plans can apply across many sites, and access can be limited so each property's team sees only its own work.

Can we see which rooms keep having the same fault?

Yes. FieldEx flags a repeat job when a room or asset gets the same job type again within a set number of days. Reports show faults by room, floor and type.

Can we set different response targets for in-room faults and back-of-house work?

Yes, one service-level agreement per job type, as in the response section above. Business hours can include round-the-clock cover.

Can outside contractors' visits for lifts and fire systems be recorded?

Yes. Contractor visits are recorded as jobs or certifications on the lift or fire asset, with their reports and certificates attached. Completion reports can be sent automatically to the general manager or anyone else.

Can engineers work in plant rooms and basements without a signal?

Yes. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

How long does it take to get a hotel running on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Rooms, plant and past jobs can be uploaded. FieldEx helps with setup, and training is included. See Setup and Training.

Run every room fault, safety check and plant service from one system

Book a Demo