Hotel maintenance software for Malaysian hotels, resorts and serviced apartments

From a guest's broken aircond to the boiler's certificate renewal, every engineering job is logged, assigned, timed and closed with photos.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by hotel engineering teams

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian hotel engineering departments. Guest room defects become tracked jobs. Chillers, boilers, gensets and pool plant run on planned preventive maintenance (PPM). Bomba, Department of Occupational Safety and Health (DOSH) and Suruhanjaya Tenaga deadlines stay on each hotel's dashboard.

What FieldEx does for Malaysian hotel engineering departments

The chief engineer of a Malaysian hotel looks after two things at once. Guest rooms must be right before the next check-in, and the regulators inspect the plant. Bomba wants the fire certificate, and DOSH wants lifts and boilers certified. Suruhanjaya Tenaga wants the competent person's inspection visits, and the Ministry of Health wants clean kitchens. FieldEx puts all of it on the hotel's own records. Book a demo for one of your properties.

The hotel, its rooms and its plant

  • One site per hotel, resort or serviced apartment block.
  • Address, map pin and contacts on each site, with floor plans attached.
  • Assets for chillers, air handling units, boilers, calorifiers and gensets.
  • Lifts, escalators, fire pumps and kitchen equipment on their own asset records.
  • Cold rooms, pool plant and, where it helps, each guest room, in Asset Management.
  • Parent and component levels, such as a room with its fan coil unit, water heater and minibar.
  • QR stickers on rooms and plant for quick scanning by technicians.

Guest room defects from front desk to fixed

  • Defects raised by the front office, housekeeping or the duty manager on the web or the app, with photos and the room linked.
  • A QR form on a room or the property that opens without login. Any staff member can log a defect, and it arrives in the engineering backlog.
  • Service-level agreements (SLAs) on the hotel's operating hours, with warnings before an in-room defect target is missed.
  • A notice when the same room or unit has a repeat job soon after the last one.

PPM for every plant room

  • Asset PPM for chillers, boilers, gensets and pumps, and site PPM for rounds such as tray cleaning or emergency light checks, in Preventive Maintenance.
  • Frequencies by day, week, month or year.
  • Schedules fixed or counted from the last visit, and genset PPM by running hours.
  • A plan applied to all rooms of one type, or to every hotel in the group.
  • Missed visits rescheduled automatically after a set overdue period.

Certificates and regulator dates

  • Recurring certifications per asset type, with the certifying authority recorded.
  • Set frequencies, such as a yearly fire certificate, and the 15-month certificate of fitness (CF) on a maintenance plan.
  • Due, overdue and done status, with reminders, and certificates attached, through Compliance Documentation.
  • A dashboard per hotel of what is overdue and due in the next 7 days.

Engineering staff on shift

  • Jobs offered by skill, availability, shift and leave, so a chargeman job goes to a chargeman.
  • A drag-and-drop scheduler in Scheduling and Dispatch.
  • The FieldEx Mobile App with checklists, number fields for readings and watermarked photos.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • An engineering store and each technician's own stock, with reorder alerts and parts booked to each job, in Spare Parts Inventory.

The hotel's own vans, tools and test meters

  • Shuttle vans, engineering tools, thermometers and test meters kept as assets, each with its serial number or registration.
  • Puspakom inspections, calibrations and road tax renewals as recurring certifications, with reminders and certificates on file.
  • Maintenance plans for hotel vehicles by date or odometer reading, and workshop machines on their own PPM.
  • Spare parts held in the engineering store and each technician's own stock, with reorder alerts and parts booked to the job.

Reports for the GM and the owning company

  • Monthly reports on room defects, SLA results, PPM completed against PPM scheduled and maintenance cost per hotel and asset.
  • Job sheet PDFs with the work done, parts, photos and time on site.
  • Reports exported or emailed on a timetable to each hotel's general manager, in Reporting and Analytics.

Reports for the general manager and owners

  • Reports on room faults by floor or type, response times, PPM completed against scheduled, and maintenance cost per asset and property.
  • A completion PDF for each job with the work done, parts, photos and time on site.
  • Reports exported as CSV, Excel or PDF, or emailed on a schedule to each property's management, in Reporting and Analytics.

FieldEx also runs this kind of work for Retail, Food & Beverage Equipment, Pest Control and Agriculture & Estate.

Which Malaysian hotels need a Bomba fire certificate, and how often is it renewed?

Hotels above set room and floor thresholds are designated premises and must renew a fire certificate every year. Jabatan Bomba dan Penyelamat Malaysia (JBPM) lists them in the Fire Services (Designated Premises) (Amendment) Order 2020, P.U.(A) 289/2020:

  • Open-corridor hotels with 100 rooms or more in each block.
  • Hotels of two to three stories with 101 rooms or more.
  • Hotels of four stories and above with 51 rooms or more.

Section 28 of the Fire Services Act 1988 makes the certificate renewable every year.

What FieldEx does about it

  • The certificate on the main fire panel: the yearly fire certificate is a recurring certification on the hotel's fire system. Reminders go out well before it expires.
  • Every fire system on its own schedule: sprinklers, hose reels, wet risers, alarm panels and extinguishers each have their own inspections.
  • Ready for the Bomba visit: service records, test results and photos for each system are on hand on the phone or as job sheets.
  • Before a room reopens: a one-off flushing job can be raised on a room's record before it goes back into use.

How often do hotel lifts and escalators need a DOSH certificate of fitness?

Each lift's certificate of fitness (CF) lasts 15 months from the date of inspection. Regulation 5(6) of the Plant Requiring Certificate of Fitness Regulations 2024, P.U.(A) 99, sets that validity for lifting machinery, including lifts. Regulation 8(3) requires the owner to hold an agreement with a competent person for at least one year. The agreement covers servicing, adjustment and comprehensive examination of lifts, escalators and walkalators.

What FieldEx does about it

  • Each lift with its own CF date: each lift's and escalator's 15-month CF renewal runs on a maintenance plan, with the current CF attached to its record.
  • The lift contract linked: the maintenance agreement is a contract with start and end dates covering the lifts it names.
  • Guest complaints on the lift record: a stuck or noisy lift reported by a guest becomes a job on that lift, building its breakdown history.

When must hotel boilers, calorifiers and pressure vessels be inspected for their certificate of fitness?

Inspect each steam boiler and pressure vessel before its CF expires. Regulation 3 of the 2024 certificate of fitness regulations lists steam boilers and pressure vessels, with lifting machinery, as plant requiring a CF. The Malay text adds the timing rule. The periodical inspection under section 27E of the Act must be carried out before the CF expires, and so must an inspection under an approved special inspection scheme. Laundry boilers, calorifiers and air receivers are typical hotel examples.

What FieldEx does about it

  • A CF per vessel: each boiler, calorifier and air receiver carries its CF as a recurring certification with reminders before expiry.
  • Preparation as PPM: the shutdown, cleaning and preparation before the DOSH inspection runs as a PPM visit on the vessel.
  • The certificate filed: the CF and the inspector's report are attached to the completed record.

How often must a hotel's AHUs and drain trays be cleaned under the DOSH indoor air quality code?

Clean drain trays at least once a month, and clean AHU fans, dampers and coils at least every 6 months. DOSH's indoor air quality code of practice (Industry Code of Practice on Indoor Air Quality 2010) sets these intervals. It also requires the building and its mechanical ventilation and air-conditioning system to be inspected at least every 6 months. Condensate pipes are cleaned every 6 months too.

What FieldEx does about it

  • Monthly and six-monthly on one plan: each air handling unit and fan coil unit carries the monthly tray clean as one visit type. The six-monthly coil and fan clean is a separate visit type.
  • Rooms in rotation: a plan applied to all fan coil units raises each room's visit, so guest rooms are cleaned without missing any.
  • Photos as proof: before and after photos of each coil and tray are attached to the job.

How many competent-person inspection visits a month does a hotel's electrical installation need?

Most hotels need at least one competent-person inspection visit a month, and at least two above 600 volts. Regulation 67 of the Electricity Regulations 1994, published by Suruhanjaya Tenaga (ST), sets the minimum competent-person visits. An installation of up to 600 volts supplied through switchgear of 100 amperes or more needs at least one visit a month. An installation above 600 volts and up to 11,000 volts needs at least two. ST can require more visits in the interest of public safety.

  • Weekly: test fire detection and warning systems, and run fire pumps and standby diesel engines for 30 minutes.
  • Monthly: test all emergency lighting and safety torches for charge and illumination, and check that fire doors close correctly.
  • Six-monthly: a competent person tests and maintains the fire detection and warning system and the emergency lighting.

What FieldEx does about it

  • The right frequency per installation: each switchroom runs a PPM plan for monthly or twice-monthly visits.
  • Inspection visits to the right people: the job requires the electrical supervisor or engineer skill before it is offered.
  • The record book on the switchboard: each visit's checklist, readings and findings stay on the installation's record, ready for an ST audit.
  • Failures fixed: each visit’s result, remarks and linked checklist stay on the installation’s asset record.

What do the Food Hygiene Regulations 2009 ask of a hotel kitchen and its cold rooms?

Register the kitchen, keep cold rooms defrosted and efficient, keep temperature devices accurate and clean the premises daily. The Ministry of Health's Food Hygiene Regulations 2009 cover food premises listed in the First Schedule, which may not be used for food unless registered. Chilled and frozen storage must be defrosted whenever necessary to keep refrigeration efficient, and temperature recording devices must be accurate. Food premises must be cleaned at least once a day, with floors kept in good condition.

What FieldEx does about it

  • Cold room temperatures logged: temperatures are recorded as meter readings on each cold room and freezer, building a time-stamped history.
  • Defrost and service on PPM: defrosting, door seal checks and refrigeration servicing run as PPM visits on each unit.
  • Kitchen defects tracked: a damaged floor tile or a faulty exhaust fan reported by the kitchen becomes a job with photos.
  • Gas work to gas engineers: gas servicing jobs require their matching skill, so they reach qualified engineers only.

How is hotel swimming pool water quality monitored, and what are the limits?

Keep free residual chlorine at 0.5 to 3.0 mg/l and pH at 7.0 to 7.8. Health officers sample pool water monthly under the Ministry's monitoring program. These limits come from the Ministry of Health's guideline on monitoring swimming pool water quality (Garis Panduan Pemantauan Kualiti Air Kolam Renang, June 2017). Turbidity must be 5.0 NTU or less. Under the program, pool water is sampled once a month for all parameters, with results recorded on Borang KR1.

What FieldEx does about it

  • Daily readings on the job: chlorine, pH and turbidity are entered as numbers at each daily pool check.
  • Monthly samples tracked: track monthly pool sampling as a recurring inspection, with its completion date, result and remarks recorded.
  • Pool plant on PPM: filters, pumps and dosing units have their own PPM plans under the pool asset.

What standby power does a MOTAC star rating expect a hotel to have?

A three- or four-star hotel apartment is expected to have a standby generator that can power corridor and public room lights and the emergency lift. That is in the Ministry of Tourism, Arts and Culture's (MOTAC) minimum requirements for star rating of hotel apartments, uploaded in November 2025. The same requirements expect bedroom furnishings and cooking facilities to be of good quality and well maintained.

What FieldEx does about it

  • Genset PPM by hours and calendar: the generator's plan triggers on running hours, on the date or whichever comes first.
  • Test runs recorded: load and run-time readings are entered at each test run, against the genset.
  • Room furnishings on the round: the guest room PPM checklist covers furniture, fittings and kitchenettes, and failed items become jobs.

Does changing a hotel's piped gas system need Suruhanjaya Tenaga approval?

Yes, for new work. A new gas installation or an extension needs an Approval to Install from the Energy Commission before work starts. Suruhanjaya Tenaga explains regulation 15(1) of the Gas Supply Regulations 1997 on its Approval to Install page. Registered gas contractors make the applications.

What FieldEx does about it

  • The refit as a project: a kitchen refit can be a project with its jobs, contractors and attachments, including the Approval to Install.
  • Steps in order: tasks can be sequenced so gas work cannot start until the approval task is complete.
  • Gas work to qualified people: jobs on the gas installation require their matching skill.

Does the Energy Efficiency and Conservation Act 2024 apply to large hotels?

It applies to any energy consumer using 21,600 GJ or more in 12 consecutive months, and large hotels can reach it. Suruhanjaya Tenaga's guidance on energy consumer duties under the act (EECA) sets the duties. These consumers appoint a Registered Energy Manager within 3 months of the notice, and submit an energy efficiency and conservation report every year. They also submit an energy audit report within 1 year of the notice and every 5 years after that.

What FieldEx does about it

  • Meter readings with history: energy meter and running-hour readings on chillers, boilers and the main incomer build a time-stamped history.
  • Report dates tracked: the yearly report and the five-yearly audit run as recurring certifications on the hotel, with reminders.
  • Plant performance reports: reliability, age and maintenance cost per asset help the energy manager pick improvement work.

How should hotel engineering follow a guest room defect until it is fixed?

Log each guest defect once, assign it straight away, give it a target and close it with proof. The front office, housekeeping and engineering need to see the same record, so nobody chases a defect by phone or WhatsApp.

What FieldEx does about it

  • Logged once, by anyone: front office or housekeeping raise the defect on the room, or scan the room's QR code to open the form.
  • Assigned and timed: the job goes to the engineer on shift by skill and availability, with an SLA target for in-room defects.
  • Closed with photos: the engineer completes the job on the phone with photos, and the job's status is visible to everyone with access.
  • Patterns spotted: reports show defects by room, floor and type, and repeat defects on the same room are flagged.

Which maintenance and inspection records must a Malaysian hotel keep?

Keep the electrical inspection book, the indoor air quality records for at least 5 years and the food handler records. Regulation 68(3) of the Electricity Regulations 1994 requires the owner to keep a book of all electrical inspection records and reports, open to the Energy Commission at all times. Clause 5.1.1 of DOSH's indoor air quality code requires its records to be kept for at least 5 years.

  • Door lock and closer, lighting, switches and sockets.
  • Air conditioning filters and drains.
  • Taps, showers, drains, toilet flush and sealant.
  • Windows, balcony doors and furniture fixings.
  • The television and the minibar fridge.

What FieldEx does about it

  • Every visit on the asset: switchboard visits, air-conditioning cleaning and kitchen equipment servicing stay on each asset's record with dates, staff and results.
  • Certificates with their records: CFs, the fire certificate and lab results are attached to their completed certifications.
  • Exports for inspectors: filter records by hotel, asset type and period, and export them as Excel or PDF.
  • Room histories: each room keeps its own record of PPM rounds, faults and repairs.

How often must a hotel's own shuttle vans and buses be inspected?

Take each commercial vehicle for a Puspakom routine inspection every 6 months. Puspakom says the Road Transport Act 1987 requires all commercial vehicles to undergo the routine inspection every 6 months. It lists vans among the vehicle types it inspects. Puspakom's FAQ adds that an inspection report is valid for 60 days, after which the vehicle must be inspected again.

What FieldEx does about it

  • Each vehicle on record: every shuttle van and bus can be an asset with its registration, model and service history.
  • Six-monthly inspections that don't lapse: the Puspakom inspection runs as a recurring certification, with reminders and the report attached.
  • Servicing by distance or date: each vehicle's servicing runs on a maintenance plan by odometer reading or date, whichever comes first. Fixed calendar dates apply to time-based plans.
  • Your test meters too: the engineering team's test instruments carry their calibration due dates as recurring certifications, with the certificate on file.
Customer story

Magnum, a leisure and entertainment brand established in 1968, runs its operational and facility management on FieldEx. Its story describes jobs, inventory logs and reports generated automatically, and reports sent on a set schedule. Service-level agreement tracking alerts the team as deadlines approach. Magnum reports a 25% increase in operational efficiency, with field manpower reduced from 55 to 41 people. It's a leisure business rather than a hotel, but the same problem: facility work on a schedule, with every deadline watched.

Read the Magnum Story

A large facility services company with a regional presence in Singapore runs more than 100 technicians and contractors on FieldEx. Mechanical and electrical maintenance, such as air-conditioning units grouped by floor or brand, runs alongside daily, weekly and monthly housekeeping rosters. Each task is assigned to a named team member at a set time and tracked floor by floor. Technicians close each job with a digital checklist and a PDF report. It's a facility services firm rather than a hotel, but the same pattern: rooms and floors on a fixed roster, with each task assigned and proved.

Read the Facility Services Case Study

Questions Malaysian hotel chief engineers ask about FieldEx

Which hotel maintenance software suits a Malaysian hotel group?

One that logs guest room defects, runs PPM on plant and rooms and tracks Bomba, DOSH and ST dates, as described above. FieldEx also reports per hotel, so the group's management sees each property side by side. See our guide to CMMS Software.

Can housekeeping report a room defect from their phone?

Yes, by scanning the room's QR code or using the app. The defect lands in the engineering backlog with its photo.

Can FieldEx remind us before a lift or boiler CF expires?

Yes, as a recurring certification on each lift and vessel, described above. The dashboard shows what falls due in the next 7 days per hotel.

Can each hotel in our group have its own dashboard?

Yes. Each hotel is a site, and managers can filter the dashboard by site group or service zone. Access can be limited per property.

Can we schedule fan coil unit cleaning for every guest room?

Yes, with one plan applied to all fan coil units, as in the AHU section above. New units that match the plan are picked up automatically.

Can engineers enter chlorine, pH and cold room readings on the app?

Yes, as numbers on the job or meter readings on the asset, described above. Each reading shows who took it and when.

Can our engineers use the app in their own language?

Yes. The FieldEx mobile app runs in English, Bahasa Malaysia and Chinese.

Can lift and fire contractors' visits be recorded?

Yes, as jobs or certifications on the lift or fire asset, with reports and certificates attached. Job sheets can be sent automatically to the chief engineer or anyone else.

Can we track engineering spare parts across hotels?

Yes. Each hotel's store and each technician's own stock are tracked, with transfers and reorder alerts.

How soon can our hotel be running on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Rooms, plant and past jobs can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Keep every guest defect, PPM and certificate for your hotels in one place

Book a Demo