Property maintenance software for Malaysian condominiums and strata schemes

Let residents lodge complaints from a guardhouse QR code, keep lifts, pumps and fire systems on PPM, and show committees what charges paid for.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by property management teams

FieldEx is a field service and asset management (FSM+CMMS) application for joint management bodies (JMBs), management corporations (MCs) and their managing agents. Residents lodge complaints by scanning the development's QR code, and every complaint becomes a time-stamped job. Common property runs on planned preventive maintenance (PPM). Lift, electrical and Bomba deadlines stay visible to the committee.

What FieldEx does for JMBs, MCs and managing agents

Under the Strata Management Act 2013, the management body is answerable for the condition of the common property. Residents also expect their complaints to be dealt with. FieldEx gives the building manager one place for both. Every complaint, PPM visit, competent-person inspection and contractor's job sheet sits against the development and the asset it concerns. Book a demo using one of your developments.

The development and its common property

  • One site per development, block or tower, with its address, map pin and management office contacts.
  • A service zone and attached layout plans for each site.
  • One asset per lift, booster pump, water tank and genset on the common property.
  • One asset per switchboard, guardhouse barrier, fire pump and hose reel.
  • Photos, warranty and documents on each asset, in Asset Management.
  • Parent and component levels, such as a pump room with its duty and standby pumps.
  • Several developments under one managing agent, with each building manager seeing only their own.
  • Several buildings grouped under one client, with access limited so each team sees only its own portfolio.

Residents' complaints from a QR code

  • A QR code for each development, printed for the lift lobby, notice board or guardhouse, that opens a complaint form without any login.
  • The resident adds the location, a description, a contact number and photos or video, and the complaint lands in the backlog as a job.
  • A shared default template for QR complaints, through Service Requests and the Customer Portal.
  • A public link that can be sent in the residents' group.

Common-property PPM

  • Site PPM plans for the whole development, such as monthly water tank checks and drain cleaning, and asset PPM for lifts, pumps and gensets.
  • Daily to multi-year schedules, fixed to the calendar or counted from the last visit, in Preventive Maintenance.
  • Missed PPM rescheduled after a set overdue period.
  • One plan copied across every block, with the last and next PPM date for each.

Lift CF, chargeman and Bomba deadlines

  • Recurring certifications and inspections per asset type, such as the yearly fire certificate. The 15-month lift certificate of fitness runs on a maintenance plan.
  • Each lift CF, chargeman and Bomba deadline shows as due, overdue or done. Certifications such as the fire certificate send reminders by email, in the app or both.
  • The certificate kept with the record.
  • A dashboard of what is overdue and what falls due in the next 7 days, for every development.

Technicians and contractors on the ground

  • Jobs sent to in-house technicians or contractor teams by skill, availability, shift and service zone, with a drag-and-drop scheduler.
  • The FieldEx Mobile App with the job, the asset history, the checklist, watermarked photos and a signature, all in the app.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • A dashboard of overdue checks and those due in the next 7 days, across every building.

The management office's own tools and vehicles

  • The management office's van, ladders, power tools and test meters kept as assets, each with its registration or serial number and location.
  • Puspakom, calibration and inspection due dates as recurring certifications, with reminders and the certificate on file.
  • Maintenance plans for the management office's vehicles by date or odometer reading, and its workshop machines on their own plans.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Reports for the committee and the AGM

  • A branded portal for the JMB or MC committee, with jobs and their status.
  • Equipment and last-serviced dates, upcoming asset maintenance and downloadable job sheets, all in the portal.
  • A job sheet PDF for every finished job.
  • The complaint, the fix, parts, photos and time on site on each job sheet.
  • Reports on complaints by block, response times, repeat faults and maintenance cost per asset, in Reporting and Analytics.
  • Reports ready for committee meetings and the annual general meeting (AGM).

Records for owners and committees

  • A branded portal where the owners corporation or building owner sees jobs, equipment with last-serviced dates, upcoming asset maintenance and job reports.
  • A completion PDF for each job with the fault, the work done, parts, photos and time on site.
  • Each PDF emailed, with a record of when it was sent.
  • Reports on jobs by building, response times, recurring faults and maintenance cost per asset, exported or emailed on a schedule.

Which body maintains the common property, the JMB or the MC?

The joint management body (JMB) does it first, and the management corporation (MC) takes over once it is formed. Section 21(1)(a) of the Strata Management Act 2013 (Act 757) requires the JMB to properly maintain and manage the building and the common property. It must keep them in a state of good and serviceable repair. Majlis Bandaraya Iskandar Puteri's strata management guide explains that sections 21(1)(a) and 59(1)(a) work together. They give the JMB, and later the MC, the duty and authority to maintain the building.

What FieldEx does about it

  • History that survives the handover: every job, PPM visit, certificate and photo stays on the development's site and assets. The MC inherits the JMB's full record.
  • The common property as a register: each lift, pump, tank and fire system is an asset. Each one records its status, location and maintenance timing.
  • Access that changes with the committee: portal and user access can be given to new committee members and removed from outgoing ones.
  • Clear status for the committee: the portal shows open, in-progress and completed jobs for the scheme.

What must the JMB do when the local council orders repairs to common property?

Carry out the work the notice or order asks for, and recover any cost tied to a single parcel from its owner. Section 21(1)(e) of the Strata Management Act 2013 covers notices from the authorities. The JMB must comply with any notice or order from the local authority or another competent public authority. That includes notices to abate a nuisance on the common property and orders for repairs or other work. The JMB may recover from a parcel owner any sum it spends on such a notice for that owner's parcel.

What FieldEx does about it

  • The order as a job with a deadline: the notice is attached to a job with its due date. A service-level agreement (SLA) stage warns before the date is missed.
  • Work broken into steps: tasks on the job cover the site inspection, contractor works and the reply to the council. Each task has its own owner and dates.
  • Costs traced to the parcel: parts and contractor charges booked to the job show what was spent. A parcel-related cost can then be recovered with evidence.
  • Forecast work in the plan: long-cycle tasks such as repainting or roof inspections run on multi-year maintenance plans. Each plan shows its next due date, and the job appears on the calendar once it is created.

Who fixes a leak between two floors, and how soon must the inspection happen?

The management body inspects within 7 days of notice, and the owner found responsible fixes the leak within 7 days. The Strata Management (Maintenance and Management) Regulations 2015 set out this inter-floor leakage process. Under regulation 57, the JMB, MC or developer must inspect the affected parcel, any other parcel and the common property. The inspection must happen as soon as practically possible, and within 7 days. Under regulation 61, the owner of a parcel blamed for the leak must take all necessary steps to fix it. The owner has 7 days from receiving Form 28.

What FieldEx does about it

  • The resident's notice as a job: a complaint through the QR form opens a time-stamped job with photos of the stain or drip.
  • Inspection and rectification timed: an SLA with an inspection stage and a rectification stage warns the building manager before each seven-day limit runs out.
  • Findings and Form 28 attached: the inspection checklist is completed on the job, and photos and the issued form are attached to it.
  • Both units on one job: notes and photos from the upper and lower units are added to the same job.
  • Lesser defects on their own target: moderate and low-priority jobs can run on longer service-level agreements, so they are not forgotten once the urgent work is done.

How often must a competent person inspect a condominium's electrical installation?

At least once a month, if the installation takes its supply through switchgear rated at 100 amperes or more. Regulation 67 of the Electricity Regulations 1994, published by Suruhanjaya Tenaga (ST, the Energy Commission), sets this for installations of up to 600 volts. An Electrical Services Engineer, a Competent Electrical Engineer or an Electrical Supervisor makes the visit. Under regulation 68(3), the owner, management or licensee keeps a book of all records and reports. The book must be open to the Energy Commission at all times.

What FieldEx does about it

  • A monthly PPM for the switchroom: the competent-person visit runs as a monthly plan on the main switchboard, with its checklist.
  • The right person sent: the visit needs the matching competent person skill, so it goes only to a qualified engineer, supervisor or contractor.
  • The record book, digitally: each visit's checklist, readings and report stay on the switchboard's record, ready for an ST officer.
  • The inspection record, including its result and remarks, is kept on the asset's history.

How long is a condominium lift's certificate of fitness valid, and what contract must the owner hold?

A lift's certificate of fitness (CF) lasts 15 months from inspection, and the owner must keep a maintenance agreement of at least a year. Both points come from the 2024 certificate of fitness regulations under occupational safety and health law. They cover lifting machinery, including lifts. Regulation 5(6) sets the 15-month validity. Regulation 8(3) requires an agreement with a competent person for lifts and escalators. It covers servicing, adjustment and comprehensive examination. The Department of Occupational Safety and Health (DOSH) enforces both.

What FieldEx does about it

  • The CF on each lift: each lift's CF renewal runs on a 15-month maintenance plan, and the current CF is attached to the lift's record.
  • The lift contract on file: the maintenance agreement is a contract with start and end dates, linked to the lifts it covers.
  • Breakdowns tracked against the contractor: lift breakdown complaints become jobs with response times, and repeat faults on the same lift are flagged.
  • Refused access on record: a visit where access was refused can be recorded with its status, notes and photos, showing the attempt was made.

How long does a Bomba fire certificate last, and when should it be renewed?

A fire certificate lasts 12 months, and the renewal goes in at least 30 days before it expires. Section 28 of the Fire Services Act 1988 requires one for all designated premises, renewable every year. The Fire Services (Fire Certificate) Regulations 2001 set the 30-day renewal deadline. Whether a residential development counts as designated premises depends on its use and size, so check its status with Bomba.

What FieldEx does about it

  • A yearly certification on the building: the fire certificate sits on the development's main fire panel, with reminders timed before the 30-day cut-off.
  • The systems behind it on PPM: hose reels, hydrants, alarm panels and extinguishers each run on their own inspection schedule.
  • Certificate kept with the record: each renewed certificate is attached to its completed record.
  • A failed latch or damaged fence panel can be logged as a corrective job against the barrier.

How often must the management office's own van or lorry be inspected?

Every 6 months, if it is a commercial vehicle. Puspakom states that the Road Transport Act 1987 requires all commercial vehicles to pass a routine inspection every 6 months, and vans are among the types it inspects. Puspakom's FAQ adds that a transfer of ownership inspection report is valid for 60 days. After that, the vehicle must be inspected again.

What FieldEx does about it

  • The van as an asset: the management office's van, lorry or buggy has its own record, with registration number, location and documents.
  • Puspakom dates on a six-month cycle: the routine inspection runs as a recurring certification, with reminders before it falls due and the report attached.
  • Servicing by date or mileage: each vehicle's servicing runs on a maintenance plan by date or odometer reading, so a breakdown does not stop the caretaker's rounds.
  • Records retained: the gas safety record is attached to the completed certification and stays on the appliance's history.

How should a JMB or MC log residents' complaints so nothing is missed?

Record four things for every complaint: when it came in, what it was about, who dealt with it and when it was closed. The management body relies on that record when a resident disputes a response or a council order arrives. It needs it again when the committee reports at the annual general meeting (AGM). A shared phone or messaging group loses that trail as soon as the conversation moves on.

What FieldEx does about it

  • One way in: residents use the development's QR code or public link, so every complaint enters the same backlog with a time stamp.
  • Owned and assigned: each complaint is assigned to a technician or contractor, who is notified at once.
  • Closed with proof: the job sheet shows the fix, photos and time on site, and the job's history shows every status change.
  • Patterns visible: reports show complaints by block, category and asset, and repeat faults on the same asset are flagged.
Customer story

Royal Facilities Management maintains commercial and residential properties in Oman on FieldEx. Its story describes site QR codes that let occupants report requests without an app or a login. It also describes a client portal for reporting issues and following technicians' progress. The story also covers maintenance reminders and work orders created from time and equipment schedules. Its residential buildings share the same pattern as strata schemes: occupants report faults from a QR code, and the owner follows the work in a portal.

Read the Royal Facilities Management Story

Magnum, a Malaysian leisure and entertainment brand founded in 1968, runs its operational and facility management on FieldEx. Its story describes jobs and reports generated automatically and reports sent on a set schedule. It also describes SLA tracking that alerts the team as deadlines approach. Magnum recorded a 25% increase in operational efficiency, and field manpower fell from 55 to 41 people. Its sites share the same pattern as a condominium: many facilities, scheduled PPM and reports owed to management.

Read the Magnum Story

Questions Malaysian building managers and JMB committees ask about FieldEx

Which property maintenance software works for a Malaysian JMB or MC?

One that takes residents' complaints without an app and tracks inter-floor leak and council deadlines. It should also run PPM on the common property and keep lift CF, chargeman and Bomba records. It should show the committee what was done. FieldEx does this in one system. See our guide to CMMS Software.

Do residents need to download anything to lodge a complaint?

No. They scan the development's QR code or open its public link, and fill in the form with photos or video. The complaint arrives as a job.

Can a managing agent run several condominiums in one account?

Yes. Each development is a site under its client, PPM plans can cover many sites, and each building manager can be limited to their own developments.

Can the committee check work without calling the building manager?

Yes. The branded portal shows the development's jobs, equipment with last-serviced dates, upcoming asset maintenance and job sheets to download.

Can FieldEx time the seven-day inter-floor leak deadlines?

Yes, with the two-stage SLA described above. Alerts can go to the building manager, the job owner or their manager, and reports show how often each limit was met.

Can we see how many complaints each block raises?

Yes. Reports group complaints by block, category and asset, and show response times and repeat faults.

Can our technicians use the app in their own language?

Yes. The FieldEx mobile app runs in English, Bahasa Malaysia and Chinese.

Can we keep developer defects separate from normal repairs?

Yes. Defects logged during the defect liability period can have their own job type, so they are reported apart from day-to-day maintenance.

Can contractors record their visits in FieldEx?

Yes. They get jobs on the mobile app and record check-in, check-out, checklists and photos. Your admin assigns licenses to external contractors and limits their access to the jobs that involve them.

How soon can our developments start using FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Developments, assets and past jobs can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Give your committee a clear record of every complaint, PPM and certificate

Book a Demo