Electrical maintenance software for Malaysian electrical services contractors

Plan every competent-person visit, five-yearly installation test and two-yearly relay calibration, and get each inspection report to the owner on time.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by electrical contractors

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian electrical services contractors. Every client's substations, switchboards, relays and transformers get their own record, and so do gensets and distribution boards. Monthly competent-person visits and long test cycles run to schedule. Technicians capture readings on site. Inspection reports and job sheets reach the owner within the deadline.

What FieldEx does for electrical services contractors in Malaysia

An electrical services contractor in Malaysia works to the clock set by Suruhanjaya Tenaga (ST). That means monthly visits by the competent person and a report within 2 weeks. It also means a relay test every 2 years and an installation test every five. FieldEx keeps every one of those dates on the installation it belongs to, with the readings and reports beside it. Book a demo to see it with your own installations.

Each installation and its equipment

  • One site per client installation, with its address, map pin and person in charge.
  • Each site's service zone and registration details.
  • One asset per substation, high-voltage panel, main switchboard and sub-switchboard, in Asset Management Features.
  • One asset per protective relay, transformer, genset and distribution board.
  • Ratings, serial numbers, photos and single-line drawings on each asset.
  • Relays and breakers sitting under their switchboard, so each has its own test history.
  • Printable QR stickers for each panel, and a log of every edit with the user and time.

Competent-person visits and PPM

  • Site planned preventive maintenance (PPM) plans that raise the monthly, twice-monthly or weekly inspection visits on their own, by voltage and switchgear rating.
  • Asset PPM plans for each switchboard, transformer and genset, by date, by running hours or whichever comes first, in Preventive Maintenance.
  • Separate checklists and technicians for the monthly visit and the yearly service in one cycle.
  • Missed visits flagged and rescheduled after a set overdue period, and newly installed panels joining the right plan by their criteria.

Long test cycles and certificates

  • Certifications on set frequencies, such as the five-yearly installation test, the two-yearly relay calibration and the installation's registration renewal.
  • Each test cycle shows due, overdue or done status, with reminders by email, in the app or both.
  • The test certificate filed with each record, through Compliance Documentation.
  • A dashboard of what is overdue, what falls due this week and what was finished last week, by zone or equipment type.

Readings, defects and repair jobs

  • Number fields for insulation resistance, earth resistance, load current and relay trip times, keyed in on site as exact values.
  • Thermal images, test sheets and photos attached to the job, with watermarks on camera shots.
  • A failed answer opening the repair job and its tasks at once, and a recheck if you want one.
  • Ordered steps on each job, such as isolate, test and energize, with steps that must be done before the job can close.

The right chargeman on each job

  • Jobs given out by skill, availability, shift and leave, plus zone and live location. A PJ8 job only reaches someone who holds that category.
  • A drag-and-drop scheduler with a backlog for unassigned work, in Scheduling and Dispatch.
  • A message to the technician whenever a job is given to them or moved.
  • Notifications to the technician each time a job is assigned or rescheduled.

Chargemen in the field, with van stock

  • The FieldEx Mobile App on each chargeman's phone.
  • The panel's past jobs, its checklist and its readings on the phone, with the parts in the technician's van stock.
  • A sticker scan that opens the panel and its checklist, then photos and the owner's signature on the phone.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Your own testers, relay test sets and vans

  • Insulation testers, earth testers, relay test sets and thermal cameras on record as company assets, with serial numbers and the chargeman holding each.
  • Calibration dates for every instrument, with reminders before they lapse and the certificate kept on file.
  • Company vans on maintenance plans by date or odometer reading, each with its own service history.

Inspection reports and job sheets

  • A job sheet PDF for each visit with the equipment, findings, work done, and parts and prices. It also shows time in and time out, photos and the owner's sign-off. FieldEx emails it with a log of when it went out.
  • Maintenance contracts with start and end dates, linked to the installations and PPM plans they cover.
  • Owners seeing their equipment, last-serviced dates and coming PPM in a branded Customer Portal.
  • Reports by installation, client or defect, downloaded or emailed on a timetable, in Reporting and Analytics.
  • Reports by client, site, equipment type or defect, in Reporting and Analytics. Export them as CSV, Excel or PDF, or email them on a schedule.

FieldEx also runs this kind of work for Building Services Contractors and Facilities, Building Management and Cleaning.

How many chargeman or supervisor visits does each installation need a month?

One, two or four visits a month, depending on the installation's voltage. Regulation 67(2) of the Electricity Regulations 1994 sets the minimum. Take an installation up to 600 V that takes electricity through switchgear rated 100 A or more. It needs at least one inspection visit a month by its competent person. Above 600 V and up to 11 kV, it is at least two visits a month. From 11 kV up to 132 kV, it is at least four. The Jabatan Kerja Raya (JKR) guideline on registering and operating electrical installations sets out visit frequencies by voltage and user type in its Jadual B.

What FieldEx does about it

  • Visit counts per installation: each installation's site plan is set to one, two or four visits a month to match its voltage.
  • Competent persons by category: visit jobs need the matching skill, so a high-voltage installation's visit only goes to a chargeman or engineer qualified for it.
  • A monthly view of every client: the dashboard calendar shows each installation's visits for the month, done and outstanding.
  • Proof of each visit: check-in and check-out times, the checklist and photos are kept on every visit.

What must the competent person report after each inspection visit, and by when?

Findings, recommendations and instructions, in a report to the owner within 2 weeks. Regulation 68 of the Electricity Regulations 1994 sets three duties. Under regulation 68(1), every inspection's findings, recommendations and instructions are recorded and directed to the Commission and the owner. Under 68(2), the engineer or supervisor gives the owner, management or licensee an inspection report within 2 weeks of the inspection. Under 68(4), an Inspection Certificate in Form I goes to the Commission within 2 weeks as well. Regulation 68(3) requires the owner to keep a book of all these records and reports, open for the Commission to inspect at any time.

What FieldEx does about it

  • A two-week clock on every report: a service-level agreement stage can time each visit from completion to report sent. Alerts go out before the 14 days run out.
  • Findings recorded on site: the visit checklist captures findings, recommendations and instructions against the installation.
  • The report sent and logged: the inspection report PDF is emailed to the owner with a log of when it was sent.
  • Record the inspection’s completion date, performer, result, remarks, and linked checklist against the asset.

How often must a non-domestic installation be tested under the Electricity Regulations?

At least once every 5 years. Regulation 110(3) of the Electricity Regulations 1994 covers installations other than domestic ones. A competent person must check and test such an installation at least once in every 5 years, or whenever the Commission directs. JKR's guideline, section 7.8, turns this into a process for government buildings. The steps are to check the test validity date, then appoint an Electrical Services Contractor (Kontraktor Perkhidmatan Elektrik, KPE) to carry out the test.

What FieldEx does about it

  • The five-year date on each installation: the periodic test is a five-yearly certification with its due date, reminders and the test certificate attached.
  • Earlier tests when directed: if the Commission directs a test, the certification is updated for that installation only.
  • Quotes from the due list: reports list installations reaching their five-year date by client and month. Your team can propose the test ahead of time.
  • Hot spots become jobs: a fail on the survey checklist raises the remedial job, with a retest booked after the repair.

How often must protective relays be tested and calibrated in Malaysia?

At least once every 2 years. Regulation 110(4) of the Electricity Regulations 1994 covers every protective relay and device of an installation. A competent person must check, test and calibrate each one at least once in every 2 years, or whenever the Commission directs. JKR's guideline (section 7.9) makes checking the relay setting validity date part of its process. JKR's electrical inspectorate manual quotes the same two-year rule.

What FieldEx does about it

  • Each relay on its own two-year cycle: relays are components under their switchboard, each carrying a two-yearly calibration certification.
  • Settings and trip times recorded: test results and trip times are entered as number fields, and the relay test sheet is attached.
  • Reminders before the date: they go out ahead of each relay's due date, by email, in the app or both.
  • Relay history kept: every test, setting change and replacement stays on the relay's record.

Who is responsible for keeping a building's electrical installation in good order?

The owner, management, licensee or occupier. Regulation 110(1) and (2) of the Electricity Regulations 1994 require the installation to be kept in good working order. They place that responsibility on the owner, management, licensee or occupier, or their servant or agent. Suruhanjaya Tenaga's ECOS registration guideline adds a second duty. The owner or building management must register the installations they own or operate, under section 21 of the Electricity Supply Act 1990.

  • an equipment register
  • formal inspection and test records
  • equipment labeling
  • a faulty equipment register
  • a repair register
  • records for the test instruments themselves.

What FieldEx does about it

  • The owner's duty, documented: each installation's plans, visits, tests and repairs are kept on its record for the owner to see.
  • The owner's view: through the customer portal, the owner sees equipment, last-serviced dates and coming PPM, and downloads job sheets.
  • Repairs owned and closed: each defect is a job with an owner and a status until it is fixed.
  • Test instruments tracked too: your own testers and meters can be assets with their calibration due dates as certifications, and the certificate attached.

Who is allowed to carry out electrical maintenance, testing and calibration in Malaysia?

Only a registered contractor. Regulation 71(1) of the Electricity Regulations 1994 lists the work that needs a valid Certificate of Registration as an Electrical Services Contractor. No person may do it without one:

  • maintenance and repair
  • overhaul and service
  • calibration, testing and commissioning of any installation or equipment
  • locating cable faults.

Suruhanjaya Tenaga's ECOS contractor registration page lists Electrical Services Contractors under regulation 71. It lists Electrical Contractors under regulation 75, and its guideline puts work above RM1 million in Class A.

What FieldEx does about it

  • Your registration tracked: your company's registration certificate can be kept as a certification with its expiry and reminders.
  • Work types matched to people: testing, calibration and cable fault jobs can each require their matching skill.
  • Who did what, on record: every job names the technician, the time on site and the result.
  • More tests when defects show: a failed sample answer can create a follow-up inspection for the wider check.

What do the chargeman categories such as A4 and B4 cover?

Suruhanjaya Tenaga lists chargeman (penjaga jentera) categories by voltage. For low-voltage systems they include A0 (PJ1), A1 (PJ2), A4-2, A4-1 and A4 (PJ4). For systems above low voltage, at 11 or 33 kV, they include B1 (PJ7) and B4 (PJ8). Regulation 60 of the Electricity Regulations 1994 covers the competent person who works, operates or controls an installation. An Electrical Services Engineer or a Competent Electrical Engineer recommends that person. For installations up to 600 V, an Electrical Supervisor can recommend them.

What FieldEx does about it

  • Categories as skills: each chargeman's category can be set as a skill, such as A4 or B4, on their profile. Each skill can carry an expiry date.
  • Jobs matched to the category: a substation visit at 11 kV can require B4, so only B4 holders are offered it.
  • A fallback when nobody fits: if no qualified chargeman is free, the job goes to the next group. It can also alert a supervisor or wait unassigned, as you set.
  • Codes reported: reports group findings by code, client and site, so open dangerous items are never hidden in a PDF.

How long is an installation's Suruhanjaya Tenaga registration valid?

Between one and 5 years. Regulation 3(3) of the Electricity Regulations 1994 covers the Certificate of Registration for an installation. It is valid for not less than one year and not more than 5 years from the date of issue. Suruhanjaya Tenaga's ECOS guideline says registration is the owner's duty under section 21 of the Electricity Supply Act 1990. Failing to register is an offense. JKR's guideline notes that the certificate must be renewed every 5 years using form ST KE(9).

What FieldEx does about it

  • Registration expiry on each installation: the certificate of registration is a certification on the installation's main switchboard asset, with its expiry date and reminders.
  • Renewal as a job: the renewal can run as a job with tasks for each document and inspection needed.
  • The certificate on file: the issued certificate is attached to the record and can be downloaded at any time.

What are Borang G and Borang H, and who signs them?

Borang G certifies supervision and completion, and Borang H certifies the test. A wireman signs both for low-voltage work. Suruhanjaya Tenaga's ECOS installation registration guideline describes Borang G as the Supervision and Completion Certificate (Perakuan Penyeliaan dan Penyiapan). The single-phase or three-phase wireman who did and supervised the wiring fills it in. The Electricity Regulations 1994 require Form G (Certificate of Supervision and Completion) under regulations 12 and 13. They also require Form H (Certificate of Test), and regulation 14 prescribes both forms. After wiring or rewiring, an authorized single-phase or three-phase wireman tests the installation and certifies Borang H.

What FieldEx does about it

  • Wiring jobs with their forms: each wiring or rewiring job can have the signed Borang G and Borang H attached on completion.
  • The wireman named: the job records which wireman did the work and tested it.
  • Tests required before close: the testing task can be required before the job can be closed.

What must happen when the competent person finds a dangerous defect?

Tell the owner to make it good at once, and report it to the Commission immediately. Regulation 70 of the Electricity Regulations 1994 covers an engineer or supervisor who finds a dangerous defect. They must immediately tell the owner, management or licensee to make good or remove it. They must also report immediately to the Commission. Regulation 68(1) adds that every finding, recommendation and instruction is recorded and directed to both the Commission and the owner.

What FieldEx does about it

  • A dangerous answer raises the alarm: a "dangerous defect" answer on the checklist creates the repair job. It notifies the owner and your engineer at once.
  • Evidence on the defect: photos and readings are attached to the job, with the time the defect was found.
  • Closed and proven: the repair job's completion records when the defect was made good, with the owner's sign-off.

Which electrical accidents must be reported to Suruhanjaya Tenaga?

Any accident or fire that causes death, injury or serious property damage. Section 33 of the Electricity Supply Act 1990 covers any accident or fire involving an installation or electrical plant or equipment. If it causes loss of life, hurt to any person or serious damage to property, it must be reported to the Commission. Suruhanjaya Tenaga's FAQ explains that the report is made by the quickest means available. A written report follows with the least possible delay.

What FieldEx does about it

  • Incidents logged as jobs: an accident or fire becomes a job on the installation, time-stamped from the moment it is reported.
  • Steps that can't be skipped: the incident job can hold ordered tasks, such as make safe, notify the Commission and file the written report.
  • Everything attached: photos, readings and the written report stay on the job and the installation.

Which wiring standard applies to electrical installations in Malaysian buildings?

MS IEC 60364. Suruhanjaya Tenaga gave a 2021 presentation on electrical installation standards in Peninsular Malaysia and Sabah. It lists the Electricity Supply Act 1990 and the Electricity Regulations 1994 as the basis for wiring design. It also lists MS IEC 60364 "Electrical Installations of Building" and MS 1979, its code of practice. Seminar material from Suruhanjaya Tenaga and the Institution of Engineers, Malaysia (IEM) on MS IEC 60364 names Part 7-710 for hospitals among the special locations.

What FieldEx does about it

  • Checklists built to the standard: inspection checklists can follow the clauses you test to, with sections and reference photos.
  • Faster setup: checklist questions can be drafted with AI from a PDF or PNG of your existing checklist or procedure.
  • Special locations kept separate: hospital and other special installations can have their own asset type, checklist and cycle.
  • Vans on plans: each company van follows a service plan by date or odometer reading.

How often should an electrical contractor's own vans and test instruments be checked?

Commercial vans go to PUSPAKOM every 6 months, and each tester follows its calibration interval. PUSPAKOM's inspection guide says the Road Transport Act 1987 requires all commercial vehicles to undergo a routine inspection every 6 months. Under regulation 110(4) of the Electricity Regulations, protective relays are calibrated at least every 2 years. The relay test set used for that work needs a current calibration of its own.

What FieldEx does about it

  • Testers with calibration dates: each insulation tester, earth tester and relay test set has its own record and calibration certification, with reminders.
  • The instrument on the job: the tester used can be noted on each test job, so its calibration can be shown with the results.
  • Vans on two cycles: each van's servicing runs on a plan by date or odometer reading, and its six-monthly inspection runs as a recurring certification.
Customer story

AlanDick is a radio frequency (RF) and telecom infrastructure services company in Brunei. It sends up to 26 people a day to onshore and offshore sites with FieldEx. It's a different trade, but the same work: qualified people, inspected tools and renewed certifications on every job. Its story describes jobs assigned by skill, availability and proximity, and tool inspections and procedure audits scheduled with reminders. Staff certification renewals are tracked, and clients follow service progress in the portal.

Read the AlanDick Story

Sime Industrial supplies, services and rents heavy equipment to the construction, mining and energy sectors. It runs its field service team on FieldEx. It's a different industry, but the same need: one record of every technician's jobs, time and location across many sites. Before the switch, planners tracked jobs and mileage claims across Excel and WhatsApp. Its story describes one place for job updates, statuses and time logs, with live technician locations beside task progress. Management reports now take a few clicks.

Read the Sime Industrial Story

What Malaysian electrical contractors ask about FieldEx

Which electrical maintenance software suits a Malaysian electrical services contractor?

One that plans monthly competent-person visits by voltage and tracks five-yearly tests and two-yearly relay calibration. It should also record readings on site and get reports to owners on time. FieldEx does this in one system, as the sections above describe. See our guide to CMMS Software Options.

Can FieldEx plan one, two or four competent-person visits a month per installation?

Yes. Each installation's site PPM plan is set to the number of visits its voltage needs, and the visits are created and assigned automatically.

Can we make sure the inspection report reaches the owner within 2 weeks?

Yes, as the inspection report section shows. SLA reports also show which clients' reports went out late last quarter.

Can FieldEx remind us before relay calibration or the five-yearly test is due?

Yes, as the relay and five-yearly test sections show. Reports also list every installation reaching either date by client and month.

Can technicians key in insulation resistance and earth readings on site?

Yes. Number fields on the job take exact readings against the switchboard or circuit, and each reading is recorded against the job.

Can a high-voltage job go only to a B4 chargeman?

Yes. Each job type can require a matching skill, and assignment rules only offer it to technicians who hold it.

Can building owners see their installation records?

Yes. The branded customer portal shows equipment, last-serviced dates, coming PPM and downloadable job sheets.

Will the app work for technicians who prefer Bahasa Malaysia or Chinese?

Yes. The FieldEx mobile app runs in English, Bahasa Malaysia and Chinese. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Can we keep spare breakers and relays in van stock?

Yes. Each technician's van stock is tracked, with transfers, reorder alerts and a record of every part used on each job.

How fast can an electrical contractor go live on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Client installations and equipment can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Keep every installation's visits, tests and reports on schedule

Book a Demo