Generator maintenance for Malaysian gensets in hospitals, buildings and telecom sites

Keep every genset, changeover switch and battery bank on its own record, run weekly and monthly tests on time, and raise PPM on engine hours.

Book a demo
Updated 19 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by generator service teams

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian genset service companies and standby power owners. Each genset, changeover switch, battery bank and control panel has its own record. FieldEx schedules weekly runs and monthly load tests. Planned preventive maintenance (PPM) triggers on engine hours or dates. Readings and job sheets are kept for every visit.

What FieldEx does for genset service companies and owners

In Malaysia a standby genset sits under several sets of rules at once. Suruhanjaya Tenaga (ST) covers the installation and Jabatan Alam Sekitar (JAS) covers larger sets. The Ministry of Health covers hospitals, and the building's fire systems depend on the genset. FieldEx keeps every test, service and repair for each set in one place. The answer to any of them is on the genset's own record. Book a demo to see it with your own gensets.

Gensets and their parts on record

  • One site per location, whether a hospital, a commercial building, a factory or a telecom tower. Each site holds its address, map pin, person in charge and service zone.
  • One asset per genset, changeover switch, synchronizing panel and battery bank, in Asset Management. Chargers and day tanks get their own assets too.
  • Each asset holds its kVA rating, engine and alternator details, serial numbers, photos and manuals.
  • The engine, alternator, switch and batteries kept as parts of the set, each with its own history.
  • A QR sticker on each genset, and a log of every edit with the user and time.

PPM on engine hours or dates

  • An hour meter on each genset, with every reading kept as a history.
  • PPM plans that raise the job on engine hours, on the date or on whichever arrives first, in Preventive Maintenance.
  • One cycle holding the weekly run, the monthly load test and the yearly overhaul, each with its own checklist and technician.
  • Missed PPM moved forward after a set overdue period, and newly installed gensets joining the right plan by their criteria.

Tests, licenses and certificates

  • Recurring inspections for weekly, monthly, quarterly and yearly checks, each linked to its checklist.
  • Certifications on set frequencies, such as the installation's ST registration or a JAS license, through Compliance Documentation. The issuing authority and the document are on file.
  • Certification records show due, overdue and completed status, with reminders before the due date. Inspection records show their completion status.
  • A dashboard of overdue tests, tests due this week and tests finished last week, by zone or asset type.

Readings from every run

  • Number fields for load in kW or % of rating, run time, engine temperature, battery voltage and specific gravity, keyed in on site.
  • Engine hours read during a check updating the genset's meter straight away.
  • Photos of the control panel and gauges, stamped with the time.

Breakdowns and power failures

  • A QR code at each site that opens a fault form without a login, and a branded Customer Portal where clients raise requests.
  • Genset jobs given out by skill, availability, shift and leave, plus zone and live location. A drag-and-drop board handles the exceptions.
  • Response and restore targets per client, counted in working hours, with a warning before a target is missed.
  • A warning when a new fault repeats a recent job on the same genset.

Gensets, van stock and the app

  • The FieldEx Mobile App on each technician's phone. It shows the set's past jobs, its checklist and its readings, plus the parts in the technician's van stock.
  • A sticker scan that opens the genset, then readings, photos and the client's signature on the phone.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • Spare parts such as belts, starter motors and batteries used on each job recorded from the technician's own stock, with low-stock alerts per stock location.

Your own load banks, testers and vans

  • Load banks, battery testers, clamp meters and portable gensets on record as your own assets, with serial numbers and the site or van holding each.
  • Calibration and vehicle inspection dates as recurring certifications, with reminders before each one lapses.
  • Service vans and trailers on maintenance plans by date or odometer reading.

Logbooks, job sheets and contracts

  • A job sheet PDF for every visit with the genset, fault, fix, and parts and prices. Each job sheet also carries time in and time out, photos and the client's sign-off.
  • Service contracts with start and end dates, linked to the gensets and PPM plans they cover.
  • Reports on gensets, run hours, tests and faults by client or site, downloaded or emailed on a timetable.

Does a building with a standby genset have to register its installation with Suruhanjaya Tenaga?

Yes. Suruhanjaya Tenaga's ECOS guideline on installation registration covers installations with a standby generator. A standby generator is one installed to supply power when the licensee's supply is cut. These installations are among those that must be registered. Registration is the owner's duty under section 21 of the Electricity Supply Act 1990. The Jabatan Kerja Raya (JKR) guideline on registering and operating electrical installations makes the same point in section 7.1. Installations with a standby genset, or at 11 kV and above, are registered.

What FieldEx does about it

  • Track the installation certificate on an asset record, with its expiry date and reminders.
  • The genset linked to it: the genset sits under the same site, so the registration and the set's history are side by side.
  • Renewal as a job: renewal can run as a job with a task for each document needed.
  • Missed runs moved, not lost: a missed run is flagged overdue and rescheduled after the overdue period you set.

Does a genset of 60 kVA or more need approval from Jabatan Alam Sekitar?

Yes, for standby gensets rated 60 kVA and above. JKR's guideline (section 7.3) covers standby gensets rated 60 kVA and above. The guideline says they are registered with Jabatan Alam Sekitar on form AS 16B, under the Clean Air Regulations 1978. The 2014 regulations revoked those rules. Confirm the current JAS process before relying on AS 16B. The Environmental Quality (Clean Air) Regulations 2014 define fuel burning equipment to include internal combustion engines.

What FieldEx does about it

  • Rating on the asset: each genset's kVA rating is on its record, so sets of 60 kVA and above can be filtered and listed.
  • The JAS license tracked: the license can be a certification on the genset with its renewal date and the license document attached.
  • A photo of the displayed license: the technician can photograph the license in the room during the yearly check.
  • Wet stacking signs logged: observations such as exhaust slobber are recorded with photos, building a history for the engine.

How many competent-person visits does an installation with a standby genset need?

At least one a month, or two above 600 V. Regulation 67(2) of the Electricity Regulations 1994 sets the minimum. Take an installation up to 600 V that takes its supply through switchgear rated 100 A or more. Its competent person must make at least one inspection visit a month. An installation above 600 V and up to 11 kV needs at least two a month.

What FieldEx does about it

  • Visits by voltage: the installation's site plan raises one or two competent-person visits a month.
  • The genset on the visit checklist: the visit checklist can include the genset's status, hours and battery check.
  • Hours updated on each visit: the hour reading taken on the visit updates the genset's meter and its next PPM.
  • The report attached: the load bank printout is attached to the completed test record.

Which chargeman category covers a low-voltage system with genset synchronizing?

A4. Suruhanjaya Tenaga's list of chargeman (penjaga jentera) categories includes A4-2 (PJ32). It covers low-voltage systems without aerial lines and without synchronizing. Generator synchronizing work needs an A4 chargeman. A1 (PJ2) covers low-voltage systems without a generating station.

What FieldEx does about it

  • Categories as skills: each chargeman's category, such as A4, can be set as a skill. Each skill can carry an expiry date.
  • Synchronizing jobs matched: jobs on synchronizing panels can require the A4 skill, so they only reach chargemen holding the A4 category.
  • A fallback: if no qualified chargeman is free, the job goes to the next group, alerts a supervisor or waits, as you set.

How often must a private hospital's genset be run and load-tested?

Weekly for at least 30 minutes, with a monthly test under load. Regulation 87(7) of the Private Healthcare Facilities and Services Regulations 2006, P.U.(A) 138/2006, covers generators. Electrical generating equipment is run for at least 30 minutes every week, or as the manufacturer stipulates. That includes a monthly test under load, with a proper record of the tests kept. The Ministry of Health's Medical Practice Division licensing checklist (October 2016) checks the same point. It asks for the record of weekly runs of at least 30 minutes and monthly load tests.

What FieldEx does about it

  • Weekly runs and monthly load tests: the weekly run and the monthly load test are separate recurring inspections on the hospital's genset.
  • Thirty minutes on the record: run time is captured on every run, with check-in and check-out times on the job.
  • The license checklist answered: reports list every run and load test by genset and month, ready for the licensing visit.
  • Missed runs flagged: a missed weekly run shows as overdue on the dashboard.

What genset test and inspection records must be kept in Malaysia?

A book of all inspection records and reports, plus a test record for hospital gensets. Regulation 68(3) of the Electricity Regulations 1994 covers the owner, management or licensee of an installation. They must keep a book of all inspection records and reports, open for inspection by the Commission at all times. For private hospitals, regulation 87(7) of the 2006 private healthcare regulations requires a proper record of generator tests. The Ministry of Health's licensing checklist asks to see it.

What FieldEx does about it

  • A digital logbook per genset: every run, test, service and repair stays on the genset's record with the date, technician and result.
  • Records available at any time: the owner can download job sheets and the genset's history from the customer portal.
  • Exported for inspectors: reports by genset and period can be exported as PDF or Excel.
  • Warranty kept: each battery's warranty period is on the part record for claims.

Which fire safety systems rely on the emergency power supply under UBBL by-law 253?

Fire pumps, fire lifts, fire alarms, smoke control and emergency lighting. By-law 253 of the Uniform Building By-Laws 1984 (UBBL) sets the emergency power system. It must power these fire systems automatically whenever the normal supply fails. The Ministry of Local Government Development (KPKT) publishes the model text of the UBBL, which each state adopts for its local authorities.

What FieldEx does about it

  • The genset linked to what it powers: the fire pumps and fire lifts it serves sit under the same site. A genset fault shows its effect on the building.
  • Changeover tested on the monthly run: the changeover switch operation is a task on the monthly load test.
  • Faults escalated: a failed changeover can raise an urgent job and alert the client and your supervisor at once.

How often should a genset be load tested, and at what load?

Monthly, for at least 30 minutes at 30% or more of the rating. Outside private hospitals, international guidance is the usual reference. NFPA 110 says generator sets are exercised at least monthly for at least 30 minutes. The run is at not less than 30% of the standby nameplate kW rating, or at the manufacturer's recommended operating temperature. For Malaysian private hospitals, regulation 87(7) of the 2006 private healthcare regulations already requires a monthly test under load.

What FieldEx does about it

  • Load as a % of rating: each load test records the load against the genset's rating as a number field.
  • Light load flagged: an answer below the 30% mark can raise a follow-up for a load bank test.
  • The load bank booked: your load bank can be an asset, moved to each site and recorded on the job.

How many engine hours should pass between genset services?

The manufacturer sets the interval, by service hours or the calendar, whichever comes first. US Environmental Protection Agency (EPA) rules cover emergency compression ignition engines, under 40 CFR Part 63 Subpart ZZZZ. They require an oil and filter change every 500 hours or within 1 year plus 30 days, whichever comes first.

What FieldEx does about it

  • Hours or date, whichever first: each genset's PPM plan triggers on its hour meter or the calendar.
  • Intervals by engine model: a default hour interval can be set per asset type, so each new set starts with the right one.
  • Hours from every job: readings taken on any visit move the next service date.

How should genset starting batteries be checked?

Monthly for specific gravity and quarterly for a load test, under international guidance. NFPA 110 section 8.3.6 covers lead-acid batteries. It requires monthly testing and recording of their electrolyte specific gravity. NFPA's 2020 article adds a quarterly battery load test.

What FieldEx does about it

  • Batteries under the genset: each battery bank is a part of its set, with its install date and warranty.
  • Readings each month: specific gravity and voltage are entered as number fields on the monthly job's form.
  • Replacement raised at once: a failed battery check opens the replacement job, with the battery taken from van stock.

What rules apply to gensets at telecommunication tower sites?

They must meet the diesel, environmental, safety and Suruhanjaya Tenaga rules that apply. The Malaysian Technical Standards Forum has a technical code for radiocommunications network infrastructure, MTSFB 001-2009 TSIR Part 3. It is registered with the Malaysian Communications and Multimedia Commission (MCMC). For a mobile base station run on a portable genset, it says the genset must comply with all relevant authority requirements:

  • the domestic trade ministry, Kementerian Perdagangan Dalam Negeri dan Hal Ehwal Pengguna (KPDNHEP, now KPDN), for diesel
  • JAS and occupational safety and health rules for sound and smoke, where they apply
  • registration with Suruhanjaya Tenaga

For a portable genset, its capacity must be at least 80% of the site's loading.

What FieldEx does about it

  • Each tower as a site: every base transceiver station (BTS) site has its own record, with its genset, batteries and rectifiers as assets.
  • Portable gensets moved and tracked: portable sets are assets moved between sites, with each move recorded.
  • Capacity on the record: each portable genset's rating is on its asset, so the technician can check it against the site's load.
  • Remote visits offline: jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

How often should diesel in a genset tank be tested?

At least once a year, under international practice. NFPA 110 section 8.3.7 requires a fuel quality test at least once a year. It uses ASTM standards or the manufacturer's recommendations.

What FieldEx does about it

  • A yearly test per tank: each tank's fuel quality test is a recurring certification with the lab result attached.
  • Six-monthly where the client asks: the frequency can be set to every 6 months instead.
  • Follow-up work: after a failed result, the job to treat or replace the fuel is raised on the tank's record.
  • Vans and trailers on plans: service vehicles and load bank trailers follow maintenance plans by date or odometer reading.

How often should a genset service firm's own vans and load banks be checked?

Every 6 months for commercial vans, and at each instrument's calibration interval. PUSPAKOM's inspection guide says the Road Transport Act 1987 calls for a routine inspection of every commercial vehicle every 6 months. That covers the vans and trucks carrying load banks to client sites. For the load bank and meters, NFPA 70B, an international standard, requires measuring test equipment to be calibrated.

What FieldEx does about it

  • Vehicle inspections on time: each van's six-monthly inspection is a recurring certification, and its servicing runs by date or odometer reading.
  • Load banks with their own history: each load bank has a record, its calibration date and the site it was last used at.
  • Meters you can vouch for: battery testers and clamp meters carry calibration certifications with reminders, so load test readings stand up.
Customer story

Sime Industrial sells, services and rents heavy machinery for construction, mining and energy customers across Asia Pacific. It represents more than 30 brands. It moved its field service team off Excel and WhatsApp onto FieldEx. Its story describes job updates, statuses and time logs in one place, with live technician locations beside task progress. Reports on job durations and technician performance take a few clicks. It's a different business, but the same work: engines and machines serviced on hours and schedules at customer sites.

Read the Sime Industrial Story

AlanDick has worked in telecom infrastructure in Brunei since the late 1970s, with operations in Malaysia too. It sends up to 26 people a day to onshore and offshore sites. Its FieldEx story describes automatic task assignment by skill, availability and proximity. Tool inspections and procedure audits are scheduled with reminders, and staff certification renewals are tracked. Clients see live service updates through the portal. Its work is close to a genset contract: remote sites, inspected tools and certified people on every visit.

Read the AlanDick Story

What Malaysian genset owners and service firms ask about FieldEx

Which generator maintenance software suits a Malaysian genset service company?

One that holds every genset, switch and battery per client and raises PPM on engine hours or dates. It should run weekly and monthly tests on time, record readings and keep the logbook. FieldEx does this in one system, as the sections above set out. See our Best Field Service Management Software guide.

Can FieldEx raise genset PPM on engine hours?

Yes, as the engine hours section shows. Hours keyed in on any job, even a breakdown call, move the next PPM.

Can we prove weekly 30-minute runs for a hospital license check?

Yes, as the private hospital section shows. The customer portal also lets the hospital download the records itself before the visit.

Can technicians key in load and battery readings on site?

Yes. Number fields on the job take load, run time, temperature, voltage and specific gravity readings against the genset.

Can FieldEx remind us before a JAS license or ST registration lapses?

Yes, as the registration and JAS sections show. The dashboard also lists any that fall due in the next 7 days.

Can we track portable gensets moved between telecom sites?

Yes. Portable sets are assets that can be moved between sites and stock locations, with every move recorded.

Can clients see their genset service history?

Yes. Through the branded customer portal, clients see their gensets, last-serviced dates, coming PPM and downloadable job sheets.

Does the app work in Bahasa Malaysia and offline at remote towers?

Yes. The FieldEx mobile app runs in English, Bahasa Malaysia and Chinese. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Can a failed changeover test raise an urgent job?

Yes. A failed answer opens the repair job at once and can alert the client and your supervisor.

How soon can a genset service company go live on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Sites and gensets can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Keep every genset's runs, tests and PPM on one logbook