Multi-trade maintenance software for M&E contractors in Malaysia

Match every trade's job, from electrical and aircond to fire and lifts, to a competent technician, and run each trade's PPM on one calendar.

Book a demo
Updated 16 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by multi-trade maintenance teams

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian mechanical and electrical (M&E) contractors that run several trades. It sends each job to a technician holding the right skill. It runs planned preventive maintenance (PPM) for every trade by date or meter reading. FieldEx tracks each trade's inspections and certificates and keeps all work on the site and asset record.

What FieldEx does for M&E and multi-trade contractors

An M&E maintenance contract in Malaysia usually bundles electrical, aircond, plumbing, fire protection and sometimes lifts under one client. Each trade answers to its own regulator. FieldEx keeps the trades apart where the rules need it, with their own skills, checklists and certificates. It keeps them together where the client needs it: one site, one asset history, one set of job sheets. Book a demo to see it on your own contract.

The right competent person on each job

  • Automatic assignment by skill, availability, shift, leave and service zone, ranked by live location so the nearest qualified technician gets the job.
  • Trade groups checked one after another in your chosen sequence. If none fits, a supervisor is alerted, the job waits unassigned or a named person takes it.
  • Dispatchers drag waiting jobs onto calendars, move them between people or dates, and FieldEx tells the technician about every change, in Scheduling and Dispatch.
  • Shifts, working hours and approved leave checked before a job is assigned.
  • The technician's working hours, shifts and approved leave taken into account before a job is assigned.

Job sheets built for each trade

  • Separate job types with their own forms and fields for electrical, aircond, plumbing, fire and lift work.
  • Job templates that prefill tasks, work items and parts for routine PPM and common breakdowns.
  • Step-by-step tasks inside one job, and steps the job can't be closed without, in Work Order Management.
  • Number fields for readings such as pressures, amps and water temperatures, entered on site against the job.

PPM for every trade on one calendar

  • Asset PPM plans and site PPM plans that create the jobs automatically, with different checklists and technicians for the monthly, quarterly and annual visits.
  • Triggers by date, by meter reading such as running hours, or whichever comes first.
  • A fixed calendar or a schedule that recalculates from the last completed visit, with missed PPM rescheduled after a set overdue period. Fixed calendar dates apply to time-based plans.
  • Plans applied across many sites, picking up new assets that match their criteria, in Preventive Maintenance.

Certificates and inspections that don't lapse

  • Recurring certifications and inspections per asset type, on set frequencies, with the certifying authority recorded.
  • Each certificate shows whether it is due, overdue or done.
  • Reminders go out by email, in the app, or both.
  • Certification records can include the completion date, performer, result, remarks, authority and an attached certificate or report. Inspection records include the completion date, performer, result, remarks and linked checklist.
  • A dashboard of overdue items, items due in the next 7 days and items completed in the last 7 days.

Site and asset history across trades

  • Sites with address, map pin, contacts and service zone.
  • The assets, jobs and PPM plans that belong to each site.
  • Every pump, panel, AHU or fire panel as an asset, in Asset Management. Each asset holds its components, specs and photos, plus warranty, meter readings and drawings.
  • QR or barcode labels so any trade can scan the asset and open its history.
  • A change history on each asset showing who edited what and when.

On the technician's phone

  • Today's job list, past work on each asset and the matching checklist on the FieldEx Mobile App.
  • Arrival and departure times, travel per job, and watermarked photos and video.
  • Parts taken from van stock, and the client's sign-off on the phone.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Your own vans, testers and tools

  • Company vans, insulation testers, clamp meters and workshop machines kept as assets. Each one has its own serial number, location and history.
  • Each van's servicing on a maintenance plan by date or odometer reading, with its PUSPAKOM date tracked as a certification with reminders.
  • Calibration due dates for every tester, with reminders before they lapse and the certificate kept on the record.
  • Parts held in each van recorded against the technician who carries them.

Clients, job sheets and service levels

  • Service-level agreements on business hours, with several stages and at-risk and violation alerts by customer, job type or asset.
  • A branded customer portal where the client, the JMB or the building manager sees equipment, upcoming asset maintenance, job status and job reports.
  • A job sheet PDF for every finished job: equipment, fault found, fix, and parts used with their prices. It also shows time on site, photos and the client's sign-off.
  • Monthly reports per trade, building, client or technician, in Reporting and Analytics. Download them or have them sent by email on a timetable.

FieldEx also runs this kind of work for Multi-Site Operations, Planned Maintenance & Reactive Repairs and First-Time Fix.

How do M&E contractors match PPM jobs to technicians with the right competency certificate?

Record the certificate each PPM job needs as a skill, and give each technician the skills they hold. The Construction Industry Development Board (CIDB) requires a contractor's competent persons to be owners, directors or full-time staff. They hold competency certificates from agencies such as Suruhanjaya Tenaga (ST), the National Water Services Commission (SPAN) and the Department of Occupational Safety and Health (DOSH, or JKKP). Suruhanjaya Tenaga says anyone who carries out, supervises or takes responsibility for electrical work must be certified as an Electrical Competent Person.

What FieldEx does about it

  • Skills on every technician: assignment rules check each job's required skill against the technicians who hold it, then their availability, shift, leave and service zone.
  • Certificates as skills: skills can be named after Malaysian competency certificates, such as "ST wireman PW4" or "DOE refrigerant handling", and carry an expiry date.
  • PPM that books itself: PPM plans create the jobs ahead of their due date with the right job template. Each job is ready for assignment to the right trade group.
  • Who did it, on the job sheet: the completed job records the technician, check-in and check-out times and the client's signature.

Who can do electrical maintenance in a building: a wireman, a chargeman or a registered electrical contractor?

Both the company and the person need to be registered. Under regulation 71 of the Electricity Regulations 1994, the maintenance, repair and servicing of installations or equipment needs a valid Electrical Service Contractor registration certificate. That includes calibration and testing. The same regulations class electrical contractors as Class A, B, C or D. Suruhanjaya Tenaga certifies wiremen under regulation 50. A single-phase wireman (PW1), for example, must be a Malaysian citizen aged at least 18, have completed Form Five and have 2 years' wiring experience.

  • Gas (UK): under the regulation 3 of the Gas Safety Regulations 1998, only a competent person may do gas work. An employer's staff may work on gas fittings only if the employer belongs to a class of persons approved by the Health and Safety Executive (HSE).
  • Refrigerant (US): technicians who maintain, service, repair or dispose of refrigerant equipment need EPA Section 608 certification, earned by passing an EPA-approved test.
  • Refrigerant (UK): each person working on fluorinated gas (F gas) equipment needs their own F gas qualification.

What FieldEx does about it

  • Electrical jobs to electrical people: an electrical job type can require its matching skill, so it is only offered to technicians who carry it.
  • Readings recorded, not remembered: custom job forms capture test values such as insulation resistance or load current as number fields, entered on site.
  • The certificate on file: periodic electrical inspections run as recurring certifications on the switchboard or installation. The test report is attached, and reminders go out before the due date.
  • A job sheet the client signs: the completion PDF shows the work carried out, the technician and the client's signature.

When must the Bomba fire certificate be renewed, and what has to be in order?

Renew the fire certificate (Perakuan Bomba) every year, and apply at least 30 days before it expires. Section 28 of the Fire Services Act 1988 requires a fire certificate for every designated premises, renewable annually. The Fire Services (Fire Certificate) Regulations 2001 require the renewal application at least 30 days before expiry. Under section 29(4) of the Act, the certificate is issued only after an inspection finds the fire safety installations adequate.

What FieldEx does about it

  • The renewal date as a certification: set the fire certificate up as a recurring certification on the building. Time the reminders so the renewal application goes in at least 30 days ahead.
  • Each fire system on its own cycle: fire extinguishers (alat pemadam api), hose reels, sprinklers, fire alarm panels and hydrants each get their own inspection frequency and checklist.
  • Defects closed before the visit: a failed checklist answer raises a corrective work order and can schedule a follow-up inspection. The system is back in order before Bomba arrives.
  • Evidence in one place: completed inspections hold the result, the technician, remarks and the service report, ready to download.

How often is a lift inspected, and who has to maintain it?

A DOSH officer or a licensed person inspects each lift periodically, and the certificate of fitness lasts 15 months. DOSH's certificate of fitness regulations, the Occupational Safety and Health (Plant Requiring Certificate of Fitness) Regulations 2024, have been in force since 1 June 2024. They make a certificate of fitness for lifts and other prescribed plant valid for 15 months from the date of inspection. Owners must have lifts, escalators and similar plant maintained by a competent person under a servicing agreement of at least one year.

What FieldEx does about it

  • The certificate of fitness on the lift's record: track it as a recurring certification with a custom 15-month frequency. The record holds the certifying authority, the inspection result and the certificate attached.
  • Monthly servicing on the plan: the servicing agreement's visits run as an asset PPM plan with the lift's own checklist.
  • Specialists in their own group: lift jobs go to the lift technician group, so they never land on the general M&E roster.
  • Contract dates on file: the servicing agreement is a contract with start and end dates, linked to the lifts and PPM plans it covers.

Who is allowed to service aircond units and chillers that use refrigerant?

Only technicians trained on a refrigerant handling course certified by the Department of Environment (DOE). The Environmental Quality (Refrigerant Management) Regulations 2020 have been in force since 1 June 2020, replacing the 1999 regulations. Under them, nobody may repair or service equipment that uses refrigerant without that training. Technicians must also follow the DOE's technical guidance document and label refrigerant containers by type.

  • Refrigerant (EU): under Article 7 of the F-gas Regulation (EU) 2024/573, operators keep leak-check, servicing and repair records for each piece of equipment for at least 5 years. Contractors who do that work keep copies for 5 years too.
  • Water systems (Great Britain): the HSE's Legionella record guidance says monitoring, inspection and test records should be kept for at least 5 years. Other records are kept while current and for at least 2 years after.

What FieldEx does about it

  • Refrigerant jobs to trained technicians: aircond regassing and chiller service job types require their matching skill, so they reach DOE-trained technicians only.
  • Training on record: each technician's refrigerant handling certificate can be tracked as a certification, with the certificate attached.
  • Each unit's history: every service, leak check and repair stays on the unit's record.
  • Reports when an auditor asks: report inspection, job and asset data by site, asset type or period. Then export it as CSV, Excel or PDF.

Which SPAN permit does a plumber need for repairs inside a building?

An IPA permit from SPAN, the National Water Services Commission. Under section 50 of the Water Services Industry Act 2006 (Act 655), anyone who intends to work on a water supply or sewerage system must get a SPAN permit. SPAN's 2020 annual report says permits exist so the work is done by competent contractors and plumbers to the required quality and standards. The Water Services Industry (Permit) Rules 2007 define IPA permit Type A1. It covers building, connecting, modifying or repairing the service pipe after the meter point, and the internal plumbing.

What FieldEx does about it

  • Plumbing jobs to permitted plumbers: a plumbing job type requires its matching skill, so internal piping repairs go to plumbers who hold the permit.
  • Photos before and after: watermarked photos and video on the job show the pipe before and after the repair. Notes record the work done.
  • Parts and time recorded: fittings used are recorded from the plumber's own stock, with check-in and check-out times on the job sheet.
  • Check-in, check-out and history: technicians check in and out of each task, and the task's history shows who did what and when.

Can a JMB or MC appoint contractors for different trades, and what records will it expect?

Yes. Section 21 of the Strata Management Act 2013 sets the duties of the joint management body (JMB). The JMB must maintain and manage the building and common property and keep it in good and serviceable repair. It may employ any person or agent to maintain and manage the common property. The same duties pass to the management corporation (MC) once it is formed. A JMB that hires one multi-trade contractor will still want each trade's work for every lift, pump, panel and fire system.

What FieldEx does about it

  • The development as a site: common-property assets such as pumps, lifts, switchboards and fire systems sit under the development's site record. Each asset has its own history.
  • The committee can see the work: the JMB or MC uses the Customer Portal to see equipment with last-serviced dates. The portal also shows upcoming asset maintenance, open jobs and job reports.
  • Residents report faults at the asset: a QR code on site opens a fault-report form without logging in. Residents can add photos or video, and the report arrives as a job in the backlog.
  • Contracts tied to assets: the maintenance contract records its dates and links to the assets and PPM plans it covers.

How should PPM plans and records be kept for a JKR government building?

Lay the plan out for the contract period and keep every maintenance document where reviewers can find it. The Public Works Department (JKR) green rating for existing buildings is pH JKR. The rating expects the maintenance team to prepare an asset operation and maintenance plan and budget for 3 years or the contract's length. It also expects the appointed maintenance or facilities team to record all maintenance documents for reference. The rating flags disorganized record keeping as an issue.

What FieldEx does about it

  • A plan for the contract period: asset and site PPM plans have start and end dates. A three-year contract's maintenance is laid out from day one.
  • Records ready for review: every job, inspection and certificate is held on the asset and site, with attachments and job sheets downloadable on demand.
  • Reports by asset and period: report maintenance, cost and inspection data by building, asset type or period. Export it as CSV, Excel or PDF.
  • The client can move the visit: customers can request a new appointment date through the portal, and the change shows on the schedule.

What happens when a job overruns and the next client is waiting?

Move the waiting job to another technician with the same skill, and give the client a new time before the response window closes. It happens every week on a mixed-trade roster: an aircond callout turns out to be an electrical fault, and the technician's next PPM visit slips.

What FieldEx does about it

  • Move the job in seconds: drag it to another qualified technician's calendar or back to the backlog, and the new technician is notified.
  • Alerts before the breach: service-level agreements send at-risk alerts before the response or fix time is missed.
  • The client can reschedule: customers request a new appointment date through the portal, and the change appears on the schedule.
  • Vans on their own plans: a maintenance plan runs each van's service by date or odometer reading, and its history stays on its record.

Which checks apply to an M&E contractor's own vans and test instruments?

Commercial vans go to PUSPAKOM every 6 months, and test instruments follow their calibration interval with a traceable certificate. Under the Road Transport Act 1987, PUSPAKOM says all commercial vehicles must undergo a routine inspection every 6 months. Insulation testers, clamp meters and pressure gauges follow the manufacturer's calibration interval. Standards Malaysia accredits calibration laboratories for electrical, temperature and pressure measurements under the Laboratory Accreditation Scheme of Malaysia (SAMM), based on ISO/IEC 17025.

What FieldEx does about it

  • Your own kit on record: each van, tester and workshop machine can have its own asset record. The record holds its serial number, model and location.
  • PUSPAKOM dates that don't slip: each van's routine inspection runs as a recurring certification every 6 months, with reminders and the inspection report attached.
  • Calibration dates that don't lapse: each instrument's calibration runs the same way, with the laboratory's certificate on file.
  • Vans on their own plans: each M&E van's servicing follows a maintenance plan by date or odometer reading, and the van's record keeps its history.
Customer story

AlanDick runs telecom infrastructure field operations on FieldEx. It's a different industry, but the same problem: sending the right skill to each job. Its story describes scheduling and dispatch based on technician skill, availability and proximity, with a live operations dashboard for job progress.

Read the AlanDick Customer Story

DKSM is a Malaysian mechanical, electrical and plumbing (MEP) and fire safety contractor. Across 300+ client sites, it uses FieldEx to automate compliance scheduling and inventory tracking. Each client site's schedule gets maintenance reminders and work orders, and team leads log parts on their phones.

Read the DKSM Story

Questions Malaysian M&E contractors ask about FieldEx

Which software suits an M&E maintenance contractor in Malaysia?

Software that handles the trades and the assets together: skill-based assignment, PPM for each trade, certificates with reminders and one history per asset. FieldEx does all of these in one system, as the sections above show. See our guide to Field Service Management Software.

Can FieldEx send a job to the nearest technician who holds the right skill?

Yes, through the assignment rules described above. Shift patterns can be given to people or teams, and technicians see their own or their group's shift schedule on the phone.

Can we run PPM for electrical, aircond, plumbing and fire on the same site?

Yes. Beyond the asset and site PPM plans described above, every plan, site and asset shows its last and next maintenance dates.

Can FieldEx remind us before a fire certificate or lift certificate of fitness expires?

Yes, as the Bomba and lift sections show. The dashboard also lists every certificate due in the next 7 days, across all your buildings.

Can one job sheet cover work by two trades?

Yes. Split the job into steps and give the electrical step to the wireman and the aircond step to the aircond technician. Then set which steps must be signed off before the job sheet closes.

Can our technicians use the app in Bahasa Malaysia?

Yes. The FieldEx mobile app works in English, Bahasa Malaysia and Chinese, so each technician can use the language they read best.

Can the JMB or building owner see the maintenance records?

Yes, through the branded customer portal described in the JMB section. Completion reports can also be sent automatically to the JMB, the building owner or anyone else.

How quickly can an M&E contractor start using FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Sites, assets and past jobs can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Run every trade's PPM, breakdowns and certificates in one system

Book a Demo