Water utility contractor software for pipe repairs, meter work and network maintenance

For contractors serving Malaysia's state water operators and the operators' own teams. Every burst, meter change, valve and reservoir visit is timed and signed.

Book a demo
Updated 16 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by water utility maintenance teams

FieldEx is a field service and asset management (FSM+CMMS) application for water utility contractors and operators in Malaysia. It times pipe repairs against the operator's KPIs and raises meter and network jobs in bulk. FieldEx keeps each valve, hydrant, pump station and reservoir on a located record. It also tracks permits and crew competencies.

What FieldEx does for water utility contractors and distribution teams

Contractors to operators such as Air Selangor, PBAPP or Ranhill SAJ work to targets set in their contracts. The National Water Services Commission (SPAN) sets targets too. FieldEx keeps those targets, the jobs and the evidence together. Book a demo with one of your work packages.

The network, asset by asset

  • Valves, hydrants, meters and air valves on their own records.
  • Pump stations, balancing reservoirs and service tanks on their own records too.
  • Technicians take photos on the job from the mobile app.
  • Pump stations as parent assets, with pumps, motors, panels and gensets as components.
  • The operator's own asset numbers kept in renamed identifier fields, shown on web and mobile.
  • QR or barcode labels on above-ground assets, opening the record and its checklist when scanned.

Repair jobs against the operator's KPIs

  • Response and repair clocks with stages and breach alerts, set per pipe size or work type, in Scheduling and Dispatch.
  • Jobs routed by skill, availability, shift and leave, and by service zone and the crew's live position.
  • A drag-and-drop scheduler to move crews when a big burst comes in.
  • Repair checklists that raise follow-up jobs for flushing, road reinstatement and site clearance.
  • Overdue visits rescheduled automatically after the period you set.

Meter and connection work in volume

  • Meter replacements and new connections raised in bulk from an uploaded list of accounts or addresses.
  • Old and new meter details and readings entered on the job form by the technician.
  • Each meter keeps its install date, location and every change on its record.
  • Emails and alerts to the people you choose at each point in a job.

Planned network maintenance

  • Valve exercising, hydrant checks, air valve servicing and reservoir inspections raised automatically on their cycles.
  • Calendar, running-hour or whichever-first triggers for pumps and gensets, in Preventive Maintenance.
  • Weekly pump station visits on a site plan, with overdue visits rescheduled automatically.
  • Repair checklist answers that raise the follow-up jobs for flushing, sampling and reinstatement.

Permits, registrations and crew competence

  • Your SPAN permits and contractor registrations tracked with renewal dates and automatic reminders.
  • Crew skills named after certificates, such as confined-space entry or a SPAN permit type, with expiry dates.
  • Only crews holding the right skill are assigned the job.
  • Subcontractors work in their own logins, seeing only the jobs that involve them.

Crews on site

  • Today's jobs, the asset's history and a map of the job location on the phone.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.
  • Watermarked photos and video, fittings used from the van and the supervisor's signature.
  • English, Bahasa Malaysia and Chinese in the web and mobile apps, on the FieldEx Mobile App.

Stores and fittings

  • Stock in each depot and each van, with transfers and approvals between them.
  • Clamps, couplings, pipes, valves and meters with movement history and low-stock alerts, in Spare Parts Inventory.
  • Depot buildings kept as assets with their own maintenance plans.

Your own vans, gas detectors and confined-space gear

  • Crew vans and lorries on maintenance plans by date or odometer reading, each with its own service history.
  • Gas detectors, tripods, winches and pressure gauges on record as company assets, with serial number and holder.
  • Calibration due dates on each item, with reminders before they lapse and the certificate on file.
  • Pumps, generators and tapping machines from the depot on their own maintenance plans.

Reports the operator asks for

  • Job sheets as PDFs with location, asset, work done and fittings.
  • Times on site, photos and signature on the same job sheet.
  • KPI results, repeat jobs and repair times by zone, pipe size or crew, in Reporting and Analytics.
  • Network and job data can be hosted in Malaysia when data residency is required.

What repair times does SPAN set for burst pipes?

SPAN sets a 24-hour repair target for communication pipes and pipes below 200 mm, 36 hours for 200 to 600 mm, and 48 hours above 600 mm. These key performance indicators (KPIs) apply to water service licensees in Peninsular Malaysia. PBAPP, Penang's water operator, has published them. It also gave an example of a 300 mm main repaired in 6 hours against the 36-hour KPI.

PipeSPAN repair target
Communication pipe24 hours
Below 200 mm24 hours
200 to 600 mm36 hours
Above 600 mm48 hours

What FieldEx does about it

  • A clock per pipe size: each repair job can carry the SLA for its pipe category. The SLA has stages such as attend, isolate and restore, and alerts before a breach.
  • The report already built: repair times by category, zone and crew come straight out of the jobs, ready for the operator's monthly review.
  • Evidence of restoration: check-in and check-out times, photos of the repaired pipe and the supervisor's signature show when supply came back.
  • Crews moved fast: the scheduler shows who is nearest and free, and reassigning a job notifies the crew at once.

What permit does a contractor need to work on water supply systems?

A contractor needs a written permit from SPAN before repairing or connecting pipes from the public mains. The same permit covers building, modifying or maintaining any part of a water supply system. Both rules are in section 50 of the Water Services Industry Act 2006 (Act 655). The Water Services Industry (Permit) Rules 2007 split these permits into types. An IPA Type A permit covers construction, connection, modification and repair of pipes and fittings from the public mains. Type C covers construction or modification of the water supply system. Type D covers maintenance services that don't involve operating it.

What FieldEx does about it

  • Permits with renewal dates: each SPAN permit and contractor registration is tracked as a license for your company. Each has its own renewal schedule and automatic reminders.
  • Crews matched to permits: crew skills can carry the permit type or registration they work under, with an expiry date. FieldEx only assigns jobs to crews holding the right skill.
  • Subcontractors under your permit: subcontractors get their own accounts, limited to the jobs that involve them, so their work sits under your records.
  • Proof for the operator's audit: every job shows who did it, when and where, with photos, so a permit audit has evidence to look at.

What asset records must a water operator keep?

Every individual licensee must develop and maintain a comprehensive, detailed register of all its water supply assets. That duty is regulation 12(1)(a) of the Water Services Industry (Licensing) Regulations 2007, and the register includes the diagrams or plans SPAN requires. Regulation 12(1)(d) requires key staff, agents and subcontractors to hold the qualifications SPAN specifies. Section 49 of Act 655 adds that only people holding the prescribed qualifications may operate any part of a water supply system.

Meter sizeAverage test interval
5/8 to 1 inchEvery 10 years
1 to 4 inchesEvery 5 years
4 inches and largerEvery year

AWWA Manual M6, the national water meter manual, explains why large meters are tested more often. An error in their registration affects revenue to a much greater extent.

What FieldEx does about it

  • An asset register that crews update: every valve, hydrant, meter and pump station has its own record with coordinates. Crews add photos and condition from site.
  • Plans and drawings attached: network drawings, as-built plans and manuals attach to the asset or site they belong to.
  • Change history kept: every edit to an asset record is logged with who made it and when.
  • Qualifications on file: crew certificates sit on their skills with expiry dates, and your company's licenses carry renewal reminders.

Who repairs a leaking pipe: the water operator or the owner?

The water distribution licensee maintains the public system up to the end of the communication pipe, and pays to repair that pipe. Section 36(3) of Act 655 sets that limit on the licensee's duty. Section 36(4) adds that the licensee bears the cost of repairing, replacing and maintaining the communication pipe. A leak reported at the meter can turn out to be on either side, so the job record has to show where the fault was found.

What FieldEx does about it

  • Classification on every job: custom job forms can record which side of the meter the leak was on, so each job goes to the right party.
  • Photos at the meter: watermarked photos attached to the job show the leak's location, protecting the contractor in a dispute.
  • Reports from any channel: a leak reported by QR form, portal or call center arrives as a job on the right site.
  • Customer and operator kept informed: emails and alerts go to the people you choose at each stage of the job.

How do contractors maintain hydrants and valves for a water operator?

Contractors keep hydrant mains at the legal pressure and exercise valves on a set cycle, often taken from international practice. Section 40 of Act 655 requires a water distribution licensee to keep mains with fire hydrants at the pressure set in subsidiary legislation. A breach carries a fine of up to RM100,000. For intervals, the US EPA's small water systems guidebook is a useful international reference. It asks for every mainline valve to be exercised at least once a year, with the number and direction of turns to close recorded each time.

What FieldEx does about it

  • Hydrants and valves on one register: each hydrant and valve has its own record, location, status and history, linked to the zone it serves.
  • Cycles per valve group: valves can be split into groups, such as two halves exercised six months apart, each on its own plan raising jobs on cycle.
  • Turns recorded as numbers: custom job forms, set up with you during onboarding, can include number fields for turns to close and pressure readings.
  • Stuck valves stay flagged: a valve that fails is marked on its record and gets its repair job raised at once.

How often should water tanks and reservoirs be inspected and cleaned?

Drain and inspect each reservoir at least every three years, with routine checks in between. Act 655 defines the water supply system to include pumping stations and service or balancing reservoirs, according to its published definitions. Reservoirs therefore sit inside the licensee's maintenance duty. As international guidance, the US EPA's paper on finished water storage facilities cites AWWA Manual M42. Under M42, tanks are drained and inspected at least once every three years.

What FieldEx does about it

  • Routine and multi-year inspections: the routine check runs as a recurring inspection, and the three-yearly drained inspection runs on its own multi-year plan.
  • Contractor reports attached: photos attach to the job, and disinfection readings can be recorded against it on a custom job form.
  • Hatches, vents and ladders as components: each reservoir's hatches, vents, ladders and level sensors keep their own repair history.
  • Disinfection steps on the checklist: the return-to-service checklist includes disinfection and sampling, so the tank isn't reopened early.

How do contractors show an operator they met complaint and KPI targets?

Contractors show it with timestamped complaint jobs that the operator can count against SPAN's complaint KPIs. Section 33 of Act 655 gives service licensees a general duty to deal reasonably with consumers and to adequately address their complaints. SPAN's performance framework for water supply licensees includes water supply complaints and a Customer Satisfaction Index among its KPIs. SPAN's rating bands, reported in the press with the operators' 2022 results, class complaint response and resolution rates above 80% as good.

What FieldEx does about it

  • Response times from the job itself: every complaint job records when it was raised, attended and closed. Response and resolution rates come from real timestamps.
  • Customers sign on site: the customer's signature and photos on the job sheet show the complaint was dealt with.
  • Complaints by type and zone: reports group low pressure, no water, discolored water and leak complaints by zone, for the operator's monthly review.
  • Portal for the operator: the operator's staff can follow job status and download job sheets in the portal.

How often must crews' gas detectors and confined-space gear be checked?

Calibrate gas detectors as the manufacturer recommends, and have confined-space entry and rescue equipment examined at least once a month. Clause 8.6.5 of the DOSH Industry Code of Practice for Safe Working in a Confined Space 2010 requires a direct-reading instrument calibrated to the manufacturer's recommendation. Under clause 13.3.2, a qualified person appointed by the employer maintains and thoroughly examines entry and rescue equipment at least once a month. Clause 13.3.4 asks for a report on every examination to be kept available for inspection.

What FieldEx does about it

  • Detectors and tripods on record: each gas detector, tripod and winch has its own asset record, with serial number and the crew that holds it.
  • Monthly examinations raised for you: the monthly examination runs as a recurring inspection on each item, with the examiner recorded.
  • Calibration certificates on file: each detector's calibration runs as a recurring certification on the manufacturer's interval, flagged when due.
  • Vans on their own plans: crew vans and lorries run on maintenance plans by date or odometer reading, with each one's history on its record.

How often should crews' gas detectors and test gauges be checked?

Bump-test or calibration-check each portable gas detector before every day's use, and keep its calibration records for the instrument's life. The US Occupational Safety and Health Administration's (OSHA) bulletin, Calibrating and Testing Direct-Reading Monitors, quotes that daily check from the International Safety Equipment Association. An instrument that fails the check gets a full calibration before use. One that fails the full calibration is taken out of service. The bulletin also recommends written calibration procedures with records that verify each instrument's maintenance.

What FieldEx does about it

  • Instruments as company assets: each gas detector, pressure logger and test gauge has its own record, with serial number and the crew or van that holds it.
  • Calibration that can't slip: each detector's calibration runs as a recurring certification, flagged when due or overdue, with reminders and the certificate on its record.
  • Vans and trucks on their own plans: each crew van and tipper truck runs on a maintenance plan by date or odometer reading, with its history on its record.
Customer story

TapEffect is a social enterprise that designs, builds and operates piped water systems for rural communities in Cambodia. It used to manage stock separately at each remote site. With FieldEx, its head office oversees inventory, jobs and instructions across every system. TapEffect reports that its inventory management has become 25% more efficient since moving to FieldEx.

Read the TapEffect Story

Questions water utility contractors in Malaysia ask about FieldEx

Which software do water utility contractors in Malaysia use to run repair and meter jobs?

Many still run work packages on spreadsheets and WhatsApp. FieldEx brings the jobs, repair clocks and asset records described above into one place, with job sheets ready for the operator. See how it compares in the FieldEx guide to CMMS Software.

Can FieldEx time repairs against SPAN's 24, 36 and 48-hour KPIs?

Yes. Each repair job carries the clock for its pipe category, as the repair-time section shows. The same SLA can also follow business hours where a contract sets them.

Can we upload a meter replacement package and create all the jobs at once?

Yes. Upload the list of meters or accounts and FieldEx creates a job for each. The jobs can then be grouped by zone and routed to crews already working there.

Can FieldEx remind us before our SPAN permit or registration expires?

Yes, as the permit section shows. The same renewal reminders work for each contractor registration you hold with an operator.

Can the operator's staff see our progress?

Yes. The operator's staff can follow job status, see upcoming maintenance and download job sheets in the client portal. They can also have their own user account if they carry out inspections.

Can subcontractors work in FieldEx under our account?

Yes. Each subcontractor logs in with an account limited to their own jobs, as described above. Roles and a hierarchy decide what each one can see and do.

Can FieldEx keep our water network data in Malaysia?

Yes. Where data residency is required, FieldEx hosts your data locally in Malaysia.

Do crews need mobile coverage to use FieldEx in rural areas?

No. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

How fast can a water contractor get started with FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Asset lists and past job sheets can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

How quickly can a utility start using FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Asset and customer lists can be uploaded. FieldEx helps with setup, and training is included. See Setup and Training.

Bring one of your work packages to the demo

Book a Demo