PPM software for Malaysian contracts, from planned visits to aduan closure

Plan PPM by date or engine hours, log every breakdown complaint (aduan kerosakan) and time the response against your agreed service level, on one schedule.

Book a demo

Free setup and training. Our team builds FieldEx from your job sheets and Excel files, and trains your staff on site in English or Bahasa Malaysia.

Free setup and training. Send us your forms and Excel sheets, and our team builds FieldEx for you, with one contact who knows your setup.

Updated 23 Nov 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by maintenance contractors

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian maintenance teams. They run planned preventive maintenance (PPM) and breakdown repairs in one place. Each complaint becomes a time-stamped job, and FieldEx tracks response and repair targets. PPM keeps its dates. Every repair joins the asset's history for JKR-style performance reporting. For the wider picture, see our guides to CMMS System and Facilities Management.

What FieldEx does for PPM and breakdown work in Malaysia

Malaysian maintenance contracts split the work into PPM and repair work (kerja pembaikan), from Public Works Department (JKR) buildings to strata developments. They judge the contractor on both. FieldEx keeps both on one schedule and one asset record. PPM done against PPM scheduled, and complaints closed within the agreed time, come from the same data. Book a demo to see your own assets and complaints in it.

Complaints logged the moment they come in

  • A QR code at each building or block that opens a complaint form without logging in.
  • The form takes the location, description, phone number and photos or video.
  • A branded Customer Portal for clients, joint management bodies (JMBs) and agencies. They lodge complaints, ask for a visit date and follow progress.
  • Complaints taken by phone at the helpdesk, entered as jobs in the office or on the app. All of them arrive in one backlog.
  • A breakdown job type with its own form, so reactive work is counted apart from PPM from the start.

PPM that keeps its dates

  • Asset PPM and site PPM plans that raise jobs automatically, in Preventive Maintenance.
  • Jobs on calendar intervals or on meter readings such as genset running hours.
  • A choice of fixed calendar dates or dates counted from the last completed PPM.
  • Overdue PPM rescheduled automatically after the grace period you set.
  • PPM raised early for an asset when the technician is already there for a breakdown.

Dispatch that balances both

  • Jobs assigned by skill, availability, shift and approved leave, in Scheduling and Dispatch.
  • Service zone and live location to find the closest technician.
  • A drag-and-drop scheduler showing PPM and breakdowns side by side, with an unassigned backlog.
  • A displaced PPM moved to another slot or technician in a drag. The technician is told straight away.
  • A dashboard of overdue work, work due in the next 7 days and work completed in the last 7 days.
  • A calendar of open, overdue and completed jobs.

Response and repair targets per customer

  • Service-level agreements can apply to all customers or to a customer for a defined date range, with an optional asset or job conditions. They count in working hours, with different hours on different days.
  • Separate stages for response, follow-up action and repair. Each stage has its own warning and breach threshold.
  • Warnings to the supervisor, the job owner or a group before a target is missed.
  • Response and repair times shown on each job and carried into reports.

Every repair on the asset

  • Breakdowns, PPM, parts replaced and meter readings kept on each asset and its components, in Asset Management.
  • An alert by email or in the app when a new job repeats a recent one on the same asset.
  • Checklist answers that open a corrective job, its tasks and a follow-up inspection.
  • An edit log on every asset with the user and the time.
  • Each edit to an asset logged with the user who made it and the time.

The app at the breakdown

  • The FieldEx Mobile App in English, Bahasa Malaysia and Chinese. The asset's history and checklist are one QR scan away.
  • Tasks in order inside a job, such as isolate, repair and test. Some tasks must be done before the job can close.
  • Parts from the technician's van stock and watermarked photos.
  • Arrival and departure times and the client's sign-off.
  • Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

Your own vans and equipment on PPM too

  • Company vans, tools, testers and workshop machines kept as assets, each with its own PPM and breakdown history.
  • Van servicing planned by date or odometer reading, with each PUSPAKOM date tracked as a certification with reminders.
  • Calibration due dates for testers and gauges, with the certificate kept on the record.
  • Breakdowns of your own equipment logged as their own jobs, apart from client complaints.

PPM and breakdown performance reports

  • Reports that count PPM and breakdown jobs by building, contractor, asset type or month, in Reporting and Analytics.
  • Asset reports on reliability, maintenance cost and age. They pick out the assets that keep failing.
  • Exports as CSV, Excel or PDF, or reports emailed on a timetable to the client or agency.

FieldEx also runs this kind of work for Multi-Trade Operations and Multi-Site Operations.

How do you set up a PPM schedule in FieldEx?

Most Malaysian teams start from the asset list and PPM schedule already in their contract or Excel file. Setup takes six steps.

  1. Upload your assets. Bring equipment in from Excel, with each machine and its parts, and put a QR sticker on each.
  2. Set each PPM frequency. Use monthly, quarterly or yearly dates, engine hours, or whichever comes first.
  3. Apply one plan to many assets. One plan can cover every lift or genset across your buildings, and it picks up new ones that match.
  4. Assign the team. Jobs are raised before the due date and go to a technician with the right skill, shift and zone.
  5. Close the job on the app. Technicians scan the asset, follow the checklist in English, Bahasa Malaysia or Chinese, key in readings and get the client's sign-off.
  6. Check what is overdue. Late PPM stays on the dashboard and reschedules automatically after the grace period you set.

See Preventive Maintenance and Scheduling and Dispatch.

What should a PPM checklist include?

A PPM checklist sets out the checks for one type of asset, in the order the technician does them, with a box for every reading. Typical items, for example:

  • Genset: battery and charger, diesel, oil and coolant levels, run time and load.
  • Chiller: refrigerant pressures, chilled water in and out, and condenser condition.
  • Lift: landing doors, the brake, and the alarm bell and intercom.
  • Fire alarm: the panel, a detector and break glass test, and the standby battery.

In FieldEx, each checklist runs on the technician's phone. Required steps can't be skipped, readings are keyed in as exact values, and a failed answer opens the repair job and books a follow-up inspection. See Preventive Maintenance.

How do you set up a PPM schedule in FieldEx?

A PPM schedule in FieldEx takes six steps, and most teams start from the asset list and task sheets they already have.

  1. List your assets. Upload equipment from Excel, with parent units and their components, and put a QR label on each.
  2. Set the frequency for each task. Choose calendar dates, running hours, or whichever comes first, with major and minor services in the same plan.
  3. Apply one plan to many assets. A plan can cover a whole fleet or every building of one type, and it picks up new assets that match.
  4. Assign the team. Jobs are created ahead of the due date and go to a technician with the right skill, shift and service zone.
  5. Complete the work on the app. Technicians scan the asset, follow the checklist, record readings and get the customer's signature.
  6. Review what is overdue. Missed visits stay on the dashboard and reschedule automatically after the overdue period you set.

See how the plans work in Preventive Maintenance, and how jobs are assigned in Scheduling and Dispatch.

What should a PPM checklist include?

A PPM checklist lists the checks for one type of asset, in the order a technician does them, with a place to record each reading. Typical items, for example:

  • Generator: battery and charger, fuel, oil and coolant levels, run time and the load reached.
  • Chiller: refrigerant pressures, water temperatures in and out, and condenser condition.
  • Lift: doors and their safety edges, the brake, and the alarm and emergency phone.
  • Fire alarm: the panel, a detector and call point test, and the battery standby.

In FieldEx, each checklist runs on the technician app. Required steps can't be skipped, readings are recorded as exact values, and a failed answer creates the repair job and books a follow-up inspection. For more detail, see Preventive Maintenance.

How should PPM (PyC) and breakdown repair (PyB) work be split in a JKR contract?

Run them as two streams with their own job types, because JKR measures each one separately. JKR's 2021 asset maintenance performance guideline is known as the TPPA. It defines preventive maintenance (penyenggaraan pencegahan, PyC) as the periodic inspection of building assets to find potential failures early. Repair maintenance (penyenggaraan pembaikan, PyB) restores assets classed as run-to-failure after a complaint or the maintainer's own finding. JKR's Government Building Scheduled Maintenance Guidelines (GBSMG) add testing and verification, and inspection and certification, as regimes of their own.

What FieldEx does about it

  • PyC and PyB as job types: each plan raises its PPM jobs, and breakdown repairs come in as complaints. Each is its own job type with its own form.
  • Run-to-failure assets marked: asset statuses and types show which assets are on PPM and which are repaired on failure. Plans pick up only the ones on PPM.
  • Testing and certification alongside: recurring inspections and certifications run per asset type. Each carries due dates and results, with certificates attached.
  • Findings from PPM fixed early: a PPM checklist answer may show a potential failure. It opens the corrective job before the fault becomes a breakdown.

What response and repair times apply to breakdown complaints in government buildings?

JKR's example targets run from 15 minutes to respond to an emergency up to 3 working days to repair a general complaint. JKR's work process for asset operation and maintenance, JKR.PK(O)07 (Issue 06, September 2019), sets three categories:

  • Emergency (kecemasan): life or property at risk. Response within 15 minutes and repair within 3 hours.
  • Urgent (segera): response within 15 minutes, follow-up action within 1 hour and repair within 24 hours.
  • General (umum): response within 30 minutes and repair within 3 working days.

What FieldEx does about it

  • Three categories, three clocks: set emergency, urgent and general as priorities or job types, each with its own service-level agreement.
  • Response, follow-up and repair as stages: each agreement holds separate stages, such as 15 minutes to respond, 1 hour to act and 24 hours to repair. A warning goes out before each breach.
  • Working days counted properly: the 3-working-day repair runs against business hours set by day. Weekends and off-hours are left out.
  • Breaches on record: the timing and any breach show on the job and in reports for the monthly review.

How does JKR score PPM and breakdown repair performance?

JKR scores PPM completion and complaint response with separate indicators. In the TPPA, the PyC indicator is the number of PPM jobs carried out divided by the number scheduled, weighted at 0.20. The PyB response indicator counts breakdown complaints answered within the response period in the service level agreement, divided by all breakdown complaints. Overall results fall into bands. The lowest is Amat Lemah (very weak) at 0 to 20%. The highest is Cemerlang (excellent) at 81 to 100%.

What FieldEx does about it

  • PPM done against PPM scheduled: reports count completed PPM jobs against the jobs each plan generated. They break it down by building, contractor or period.
  • Complaints answered within the agreed time: service-level agreement data in reports counts complaints responded to within their stage target. It compares them with all complaints.
  • The month's numbers on a schedule: both reports can be emailed automatically to the client or agency every month.
  • Down to the asset: filter each figure by building, asset type or zone to find where the score is lost.
  • Breaches counted: service-level agreement data in reports shows how many repairs of each tier met or missed their target.

What are the steps to handle a breakdown complaint (aduan kerosakan)?

Receive and register it, verify it on site, decide who repairs it, then close it and tell the complainant. JKR.PK(O)07 sets that sequence. The team decides whether the work goes to in-house maintenance, the FM contract or an emergency response. It then carries out the repair, updates the complaint register and informs the complainant. JKR's client charter (Piagam Pelanggan) sets the outer limits: complaints acknowledged within 1 to 3 days, a response within 7 days and closure within 2 months.

What FieldEx does about it

  • Received, recorded and registered in one step: a complaint from the QR form, portal or helpdesk becomes a numbered, time-stamped job. It lands in the backlog.
  • Verification and repair as ordered tasks: the job holds tasks for site verification, investigation and repair in order. Each task has its own assignee and times.
  • In-house or contractor: assign the job to your own technicians or to a contractor's group. Fallback rules apply when no one is available.
  • The complainant kept informed: a complainant with portal access follows its status there. Once the job is closed, they can download the job report.

How often must a lift be serviced, and who arranges repairs after a breakdown?

At least once a month, by a competent person under a maintenance agreement of at least one year. DOSH's certificate of fitness regulations, P.U.(A) 99/2024, came into force on 1 June 2024. They require lift owners to hold that agreement and to have the lift serviced and adjusted at least monthly. A lift without a valid certificate of fitness must not be operated, so repairs found on a service can't wait for the next visit.

What FieldEx does about it

  • Monthly service on its own plan: the lift's PPM plan raises the monthly service with its own checklist and competent person.
  • Defects become repair jobs: a defect recorded on the lift's checklist opens the repair job straight away.
  • The agreement on record: the maintenance agreement is a contract with start and end dates. It links to the lift and its PPM plan.
  • Breakdowns on the same history: lift breakdown callouts and their repairs sit on the lift's record next to its monthly services.

Must a JMB or MC repair common property when the local council orders it?

Yes. Section 21(1)(a) of the Strata Management Act 2013 requires the joint management body (JMB) to maintain and manage the building and common property. The JMB must keep it in good and serviceable repair. Section 59(1)(a) gives the management corporation (MC) the same duty once it is formed. Both must also comply with any notice or order from the local authority or other competent authority, including orders for repairs on the common property.

What FieldEx does about it

  • Council orders as jobs with a deadline: a repair order from the local authority becomes a job with its due date and tasks. A service-level agreement warns before the date passes.
  • Resident complaints in the same backlog: residents report through the block's QR code or the portal. Each report becomes a job beside the PPM.
  • Common property kept serviceable: lifts, pumps, water tanks and gates on the common property run on PPM plans. Breakdowns are recorded on the same asset.
  • The committee sees the work: the JMB or MC follows jobs, upcoming asset maintenance and job reports through the customer portal.

How should PPM frequencies for building systems be set?

Start from JKR's published minimum, and follow the maker's schedule wherever it is stricter. JKR's GBSMG says its maintenance schedules and frequencies are a minimum guide for each component, system, asset and premises. They can be adjusted with the owner's acceptance. The schedule is read together with the manufacturer's recommended maintenance schedule, and the more stringent requirement takes precedence. GBSMG codes its frequencies from daily (D), weekly (W) and monthly (M) through 3-monthly (3M) and 6-monthly (6M) to yearly (Y), 2-yearly (2Y) and 5-yearly (5Y).

What FieldEx does about it

  • GBSMG codes set directly: plans repeat by days, weeks, months or years, so each GBSMG code becomes a plan interval.
  • Different tasks at different points: one plan can use a different checklist and technician for each visit on the same asset. The monthly, 6-monthly and yearly visits can each differ.
  • The maker's interval where it is stricter: a plan can use each asset's own meter interval. A genset on running hours follows its manufacturer's schedule.
  • Changes approved and recorded: the owner-approved schedule is attached to the site record. The asset's edit log shows when its details changed.

Do breakdowns and repairs have to be recorded in a register?

Yes, for lifts under DOSH's regulations and for government buildings under JKR's procedure. The 2024 certificate of fitness regulations require maintenance records for each lift, covering the condition of safety devices, any damage, repairs and alterations. The records are kept on the premises where the lift is installed. JKR's GBSMG requires every defect to be reported to the facility owner immediately, or every 3 months with a proposal for remedial work.

What FieldEx does about it

  • The register builds itself: FieldEx saves every PPM, breakdown, repair and part replaced on the asset as the job closes. The date and technician are saved too.
  • Entries made on the day: the technician completes the job on the phone at the lift, so the record exists the same day.
  • Defects reported with a proposal: a defect found on PPM opens a job holding the photos and the proposed remedial work. Reports can be exported on demand or scheduled for email daily, weekly or monthly.
  • Exports for the client's systems: export asset and job data as CSV or Excel for upload to the client's own database.

How do you keep your own service vans on PPM instead of waiting for them to break down?

Give each van a PPM (planned preventive maintenance) plan by date or mileage. Add its mandatory vehicle inspection as a fixed date that repeats at the interval your local rules set. Between inspections, the van’s servicing follows the manufacturer’s schedule by date or mileage.

What FieldEx does about it

  • Each van as an asset: every company van has an asset record with its registration, model and full history.
  • Servicing by date or odometer: a PPM plan raises each van's service on its date or mileage, whichever comes first. Fixed calendar dates apply to time-based plans.
  • The inspection date you don’t miss: each van’s mandatory inspection runs as a recurring certification at the interval your local rules set, with reminders and the report attached.
  • Van breakdowns on the same record: a van that fails on the road gets a breakdown job on its own record, next to its PPM.
Customer story

AMRTUR is a Southeast Asian oilfield services provider. It runs offshore and onshore maintenance on FieldEx as one field service and maintenance platform. It's a different industry, but the same balance: planned work and breakdowns on one schedule. Its story describes preventive maintenance that creates a job at 300 hours of use or 6 months, whichever comes first. QR-code request forms are routed to the right team. Whenever a maintenance date is pushed back, the system logs who made the change and why.

Read the AMRTUR Story

Agri Sumber Prestari (ASP), part of SD Guthrie Agri Bio, is an agricultural manpower and training company. It runs maintenance and field operations across Malaysian agricultural estates on FieldEx. Its story describes preventive maintenance scheduled automatically on usage or time, and SLA tracking with alerts. Inspection checklists and jobs are generated from its procedures. ASP has 92 estates up and running, and planning time fell by 50%. It's a different industry, but the same balance of planned and breakdown work.

Read the Agri Sumber Prestari Story

What Malaysian maintenance teams ask about running PPM and breakdowns in FieldEx

What is PPM software?

PPM software plans planned preventive maintenance (PPM) on each asset, creates the jobs before they are due and records the work, so equipment is serviced before it fails. FieldEx does this and also runs breakdowns on the same schedule and asset record.

What's the difference between planned and preventive maintenance?

Planned maintenance is any work scheduled in advance, including repairs booked for a later date. Preventive maintenance is the planned work done to stop a failure, such as a service every 500 running hours. In FieldEx both are jobs on the same scheduler, and reports show them apart from breakdowns.

What is PPM software?

PPM software plans planned preventive maintenance on each asset, raises the jobs before they fall due and keeps the record of the work. FieldEx also runs breakdown complaints on the same schedule, so PPM completion and complaint response come from one system.

What's the difference between planned and preventive maintenance?

Planned maintenance is any work booked in advance, including a repair scheduled for later. Preventive maintenance (PPM) is the planned servicing that stops a failure, such as a genset service every 250 engine hours. FieldEx keeps both on one scheduler and reports them apart from breakdowns.

Which maintenance software handles both PPM and breakdown complaints in Malaysia?

Look for software that logs every complaint as a job, times it against the agreed response, keeps PPM running and reports both for the client. FieldEx does all of this in one system, as the sections above show. See our guide to CMMS Software.

Can FieldEx report PPM completion and complaint response for a JKR-style review?

Yes, as the TPPA section shows. Reports can be exported as CSV, Excel or PDF for the agency's own review pack.

Can we run emergency, urgent and general complaints on different response times?

Yes, as the JKR response-time section shows. Warnings before each breach can go to the supervisor, the job owner or a group you choose.

Will a PPM visit be lost if a breakdown takes the technician's slot?

No. The dispatcher drags the PPM to another slot or technician, and the technician is told straight away. FieldEx also reschedules overdue PPM automatically after the period you set.

Can residents or occupants lodge a breakdown without an app?

Yes. The building's QR code opens a complaint form without logging in. The complaint is time-stamped, so its response clock starts at once.

Can FieldEx flag an asset that keeps breaking down?

Yes. An alert goes out when the same job type returns to an asset within the number of days you set. Reliability reports show which assets fail most.

Can FieldEx schedule PPM by running hours?

Yes. A plan can trigger on running hours, on the calendar, or on whichever comes first. Technicians record the meter reading on the app, and the next service date follows from it.

Can FieldEx schedule PPM by running hours?

Yes. PPM can run on engine or running hours, on dates, or on whichever comes first. Technicians key in the hour meter on the app and the next PPM follows from it.

Can the app be used offline in plant rooms?

Yes. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced later.

How do I stop PPM going overdue?

FieldEx raises each PPM job before its due date and sends it to the right technician. Overdue PPM shows on the dashboard next to the work due in the next 7 days, and missed PPM reschedules automatically after the grace period you set.

How soon can our PPM and complaints be running on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Sites, assets and past jobs can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

How do I stop PPM going overdue?

FieldEx creates each PPM job ahead of its due date and sends it to the right technician. Overdue work shows on the dashboard with the work due in the next 7 days, and missed visits reschedule automatically after the overdue period you set.

How long does it take to set up planned and reactive maintenance in FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Sites, assets and past jobs can be uploaded. FieldEx helps with setup, and training is included. See Setup and Training.

Run PPM and every breakdown complaint from one schedule