Software for electrical utility contractors on substations, feeder pillars and street lighting

For contractors serving TNB, local councils and building owners, and for utility distribution teams: competent person visits, restoration targets, streetlight repairs and crew certificates on record.

Book a demo
Updated 15 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by electric utility field crews

Malaysian electrical contractors working for TNB, local councils and building owners, and utility distribution teams, use FieldEx as one system for field service management and maintenance management (CMMS). It plans competent person visits to substations, times fault repairs against TNB's service levels, runs street lighting repairs to council targets and tracks every crew's Suruhanjaya Tenaga certificate.

What FieldEx does for electrical utility contractors and distribution teams

Contract work on Malaysia's distribution network runs on strict rules: Suruhanjaya Tenaga (ST) competency, registered contractors, monthly substation visits and restoration targets backed by customer rebates. FieldEx keeps the jobs, the people and the proof together. Book a demo with one of your contracts.

Substations, feeder pillars and street lighting on record

  • Substations, transformers, ring main units, feeder pillars, poles, streetlights and meters on their own records, in asset management.
  • Each record holds the asset tag, rating, install date, photos and coordinates.
  • Substations as parent assets, with transformers, switchgear, batteries and relays as components.
  • The client's own asset numbers kept in renamed identifier fields, shown on web and mobile.

Competent person visits and testing

  • Fortnightly or weekly visits on each substation's site plan, giving the two or four monthly visits its voltage needs.
  • Five-yearly installation tests and two-yearly relay calibration as recurring inspections, with reminders.
  • Inspection reports attached to each visit, ready for the owner and ST.
  • Overdue inspections rescheduled automatically after the period you set.

Faults and restoration targets

  • Fault jobs with restoration clocks by voltage and area, with breach alerts, in scheduling and dispatch.
  • Crews sent by skill, availability, shift, leave, service zone and live position.
  • A drag-and-drop scheduler for moving crews when a major fault comes in.
  • Crews moved from planned work to storm faults by dragging their jobs on the scheduler.

Street lighting for councils

  • Streetlights and feeder pillars as assets by road and area, with lamp type and pole.
  • Complaints from the council's system raised as jobs with the council's response target.
  • Night patrols and lamp replacement programmes on their cycles, in preventive maintenance.

ST certificates and registrations

  • Chargeman, wireman, cable jointer and engineer certificates held as skills with expiry dates.
  • Jobs given only to people holding the right certificate class.
  • Your ST electrical contractor registration, TNB vendor registration and CIDB grade tracked with renewal reminders.

Technicians at substations and streetlights

  • The day's jobs, each asset's history and its position on a map, on the FieldEx mobile app.
  • Jobs and tasks downloaded for offline work, with check-in, check-out and travel synced afterwards.
  • Watermarked photos, parts used from the van and the client's signature.
  • Each technician sets the app to English, Bahasa Malaysia or Chinese.

Reports for clients

  • Completed visits, faults and streetlight repairs against targets, by contract, area or crew, in reporting and analytics.
  • MTBF, MTTR and downtime per asset, with repeat faults flagged.
  • Depot buildings, plant and line trucks as assets with their own maintenance plans.

Reports for operations and the regulator

  • A completion PDF for each job, with the asset, work carried out, parts, times on site, photos and signature.
  • MTBF, MTTR and downtime per asset, and repeat faults flagged on the same asset.
  • Inspections completed and outstanding, by district, asset type or contractor, in reporting and analytics.

What restoration times does TNB have to meet?

Suruhanjaya Tenaga's Performance Standard of Electricity Supply Services of TNB sets Guaranteed Service Levels (GSL). Under GSL2, supply after a low voltage fault must be restored within three hours. A medium voltage (33, 22 and 11 kV) breakdown must be restored within three hours in the listed cities, and four hours elsewhere. Where there is no alternative feed, the limit is 12 hours.

Equipment (GO 165)Patrol urban / ruralDetailed inspection
Overhead transformers, switches, conductors1 / 2 years5 years
Underground transformers and switches1 / 2 years3 years
Pad-mounted equipment1 / 2 years5 years
Street lighting1 / 2 yearsNot set
Wood poles over 15 years, not yet tested1 / 2 yearsIntrusive test within 10 years

Source: CPUC General Order 165, Table 1.

Natural disasters, bad weather and planned maintenance outages are excluded. If TNB misses a GSL2 target, affected consumers may claim a rebate within two months of the incident. TNB's GSL page sets the rebates: 1% of the monthly bill for domestic customers (at least RM10), 1% up to RM300 for commercial customers and 0.5% up to RM1,000 for industrial customers.

GSL2 situationRestore within
Low voltage fault3 hours
Medium voltage breakdown, listed cities3 hours
Medium voltage breakdown, other areas4 hours
Medium voltage breakdown, no alternative feed12 hours

Sources: Suruhanjaya Tenaga, Performance Standard of TNB; TNB, GSL and MSL.

What FieldEx does about it

  • Clocks per GSL band: each fault job can run the restoration target for its voltage and area, with alerts before it expires.
  • The nearest qualified crew: automatic assignment uses skill, availability and live position to send the right crew.
  • Restoration time on record: check-in, check-out, photos and the completion report show when supply was restored.
  • Targets reported: reports show faults restored inside and outside target, by area and crew.

How many competent person visits does a substation need each month?

Regulation 67 of the Electricity Regulations 1994 links visits to voltage. An installation above 600 volts and up to 11,000 volts needs at least two inspection visits a month. One above 11,000 volts and up to 132,000 volts needs at least four. Above low voltage, the visits must be made by an Electrical Services Engineer or a Competent Electrical Engineer.

The engineer submits an inspection report to the owner within two weeks, under regulation 68. The same regulations require non-domestic installations to be checked and tested at least every five years, and protective relays to be checked, tested and calibrated at least every two years.

The CPUC adds that detailed inspection records must show each item's condition, any problems found and a scheduled date for corrective action.

Installation voltageMinimum visits a month
Up to 600 V, fed through 100 A or larger switchgear1
Over 600 V up to 11 kV2
Over 11 kV up to 132 kV4

Source: Electricity Regulations 1994, regulation 67.

What FieldEx does about it

  • Two or four visits, planned: a fortnightly or weekly site plan on each substation gives it the visits its voltage needs.
  • The two-week report deadline: the visit report attaches to the job, and a reminder follows if it isn't in on time.
  • Five-year and two-year cycles: installation tests and relay calibration each run as their own recurring inspection.
  • Engineer's findings acted on: each finding becomes a repair job for the contractor.

Which Suruhanjaya Tenaga certificates do crews need?

The Electricity Regulations 1994 require every Electrical Services Engineer, Competent Electrical Engineer, Electrical Supervisor, Chargeman, Wireman and Cable Jointer to hold a valid Certificate of Competency for their category. ST's chargeman page lists the classes. A0 to A4 cover low voltage systems below 1,000 V, and B0 to B4 cover high voltage systems at 11 kV or 33 kV, with restrictions on aerial lines, power stations and generator synchronising.

Certificate holders must register with ST to work, and registration runs from one to five years. A Wireman with Three Phase Restriction (PW3) needs at least a year with a single-phase certificate and a year of wiring experience first.

Situation (Ofgem)Restore within
Normal weather, under 5,000 premises affected12 hours
Normal weather, 5,000 or more premises affected24 hours
Severe weather, category 124 hours
Severe weather, category 248 hours

Sources: Ofgem GSOP payment update 2026; National Grid standards of performance.

What FieldEx does about it

  • Each certificate as a skill: chargeman class, wireman grade and cable jointer certificates sit on each person, with the registration expiry date.
  • Jobs matched to the class: an 11 kV switching job goes only to someone holding a high voltage chargeman class.
  • Renewals flagged early: reminders go out before a registration lapses.
  • Subcontractor crews checked too: subcontractors' people carry their own skills, checked the same way.

Which electrical contractor class does a company need?

Regulation 75 of the Electricity Regulations 1994 says no one may carry out electrical work without a valid Certificate of Registration as an Electrical Contractor. Regulation 78 sets four classes by the value of work, each with a minimum number of full-time wiremen.

ClassWork valueFull-time wiremen (from ST's ECOS page)
AAbove RM1 million1 PW4, 2 PW3, 2 PW1
BUp to RM1 million1 PW4, 1 PW3, 1 PW1
CUp to RM500,0001 PW4
DUp to RM100,0001 PW2

Sources: Electricity Regulations 1994; ST ECOS contractor registration.

The registration is valid for one to five years. TNB adds its own step: an electrical contractor first registers with ST, then registers with TNB at the customer service centre for the area where it works.

What FieldEx does about it

  • Registrations with renewal dates: your ST registration and TNB contractor registration are tracked with reminders.
  • The wiremen you must keep: each wireman's grade is a skill, so you can see who holds PW1 to PW4 at any time.
  • Grades ready for renewal: when your registration is due, the skills list shows which graded wiremen you employ.
  • Copies on file: certificates attach to your company and people records.

How do contractors register to work for TNB?

TNB's vendor registration page says local suppliers and contractors must hold a valid TNB registration before taking part in its procurement. Suppliers of materials and services need Ministry of Finance (MOF) certification, and works contractors need Construction Industry Development Board (CIDB) certification. The processing fee is RM50 for each new registration, renewal or update.

TNB's tender notices add a further condition. Only vendors registered as Supplier Self-Service (SUS) suppliers can take part, and all certificates must be kept up to date in the portal.

Switchgear task (NFPA 70B)Condition 1Condition 2Condition 3
Visual inspection12 months12 months6 months
Cleaning, servicing, electrical testing60 months36 months12 months
Infrared thermography12 months12 months6 months

Source: Eaton, NFPA 70B guide book.

What FieldEx does about it

  • Every registration's expiry tracked: MOF, CIDB and TNB vendor registrations each have a renewal date and reminders.
  • Ready for the next tender: current certificates sit on your company record, ready to upload to the portal.
  • Proof of past work: completion reports and performance against targets show TNB what you've delivered.
  • Qualified people on record: staff certificates show you have the competent persons a tender asks for.

How quickly must council streetlights be repaired?

Each council (PBT) sets its own target in its customer charter. Majlis Bandaraya Subang Jaya (MBSJ) says its area contractor repairs a faulty streetlight or park light in three days, with a maximum of 14 days. Vandalism, such as stolen components or a burnt feeder pillar, can take two months because parts must be ordered.

MBSJ also explains who owns which pole. Concrete poles belong to TNB, and galvanised steel poles are maintained by the council. Majlis Bandaraya Petaling Jaya (MBPJ) aims to process streetlight complaints within 24 hours of receiving them.

What FieldEx does about it

  • The council's target on every job: standard and vandalism repairs run their own clocks, from three days to the maximum.
  • Complaints become jobs: each complaint from the council's system is raised as a job against the streetlight or feeder pillar.
  • Ownership on the record: each pole's owner, council or TNB, is held in a renamed identifier field on the asset, so jobs go to the right party.
  • Results the council can check: reports show repairs inside and outside target, by area.

How do contractors prove work to TNB or a council?

FieldEx builds the evidence as the work is done. Each job records when the crew arrived and left, watermarked photos of the fault and the repair, the parts replaced and whether the target was met, so the monthly report for TNB or the council comes straight from the jobs instead of paper forms and chat groups. Councils publish their own results: MBPJ's 2025 customer charter report counts how many streetlight complaints were processed within 24 hours, so a contractor's response times feed the council's public figures. For substations, regulation 68 of the Electricity Regulations 1994 also sets a two-week deadline for the competent person's visit report.

PG&E's 2025 GO 165 report shows why the detail matters. Three overhead detailed inspections were reported late after a check found an inspector had uploaded photos for the wrong asset. The reinspection was done the same day, but the record still counted as late.

Photos tied to the wrong asset make a completed inspection worthless. Capture them on the asset itself.

What FieldEx does about it

  • Time and place on every job: check-in and check-out, with watermarked photos, show when and where work was done.
  • Before and after: photos of the fault and the repair sit on the same job.
  • Monthly reports by contract: completed jobs, response times and repeat faults export by contract and area.
  • Your data in Malaysia: FieldEx can host your data locally in Malaysia where data residency is required.

How should maintenance be planned across many substations and feeder pillars?

FieldEx keeps hundreds of substations, feeder pillars and streetlights on one register and one calendar. Each asset class runs its own cycle, the work is grouped by area, and the plan raises the jobs, so substation visits, feeder pillar checks and streetlight patrols share one calendar with each crew's day kept to one district. Regulation 67 of the Electricity Regulations 1994 sets how often the competent person visits by the installation's voltage, so each substation's cycle in the plan follows its own voltage class.

  1. Upload the list of meters or addresses for the programme.
  2. FieldEx creates a job for each and groups them by zone.
  3. Technicians record the old and new meter details and readings on the job form.
  4. Each meter's record keeps its full history.

What FieldEx does about it

  • One plan per asset class: substations, feeder pillars and streetlights each run their own cycle.
  • Grouped by area: service zones and live position keep each crew working assets close together.
  • New assets added to plans: assets added to an area pick up its plan automatically.
  • Overdue visits rescheduled: missed visits move forward automatically after the period you set.

How do utility crews and contractors work from the same jobs?

In FieldEx, utility crews and contractors work from the same job and the same asset record, and each party sees only what it needs. Contractor work such as line clearance, streetlight repairs, civil works or meter exchanges lands on the utility's asset history as soon as it's completed, without a separate system.

What FieldEx does about it

  • Contractors in their own logins: each contractor sees only the jobs that involve them, controlled by roles and a hierarchy.
  • The same checklist for everyone: contractor crews complete the same inspection checklists and photos as your own.
  • Work on your asset records: completed contractor jobs appear on the asset's history straight away.
  • Contractor performance compared: SLA results and repeat faults by contractor show who delivers.

Questions Malaysian electrical utility contractors ask about FieldEx

What software do electrical contractors use for TNB and council maintenance contracts?

Many still rely on spreadsheets, paper job sheets and chat groups. FieldEx puts substations, feeder pillars, streetlights and meters on located records, plans competent person visits, times faults and repairs against targets and tracks crews' certificates. See our guide to CMMS software.

Can FieldEx plan two or four competent person visits a month?

Yes. A fortnightly or weekly site plan on each installation raises the visits its voltage needs.

Can fault jobs follow TNB's GSL restoration times?

Yes. Each fault job can run an SLA clock for its band, with alerts before the target is missed.

Can we track chargeman and wireman certificates?

Yes. Hold each one as a skill with its expiry date; work that needs that certificate is only offered to people who have it.

Can we track our ST, TNB and CIDB registrations?

Yes. Each registration is tracked with its renewal date and reminders.

Can council complaints become streetlight jobs?

Yes. Each complaint can be raised as a job against the streetlight or feeder pillar, with the council's response target.

Can our subcontractors log in?

Yes. They get separate logins, and what they can open is limited to their own assigned work.

Is the app in Bahasa Malaysia?

Yes. Each technician can choose English, Bahasa Malaysia or Chinese.

Do crews need signal at the substation?

No. Jobs and tasks can be downloaded and worked offline, with check-in, check-out and travel synced once the phone reconnects.

How fast can an electrical contractor get started with FieldEx?

Setup, data upload and training are part of the subscription, with no setup fee. Substations, streetlights, sites and past jobs can be uploaded. FieldEx helps with setup, and training is included.

FieldEx's Malaysian team can work with you at your office, in Peninsular Malaysia, Sabah or Sarawak, and train staff in Bahasa Malaysia or English. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. See FieldEx implementation.

Bring one of your substation or street lighting contracts to the demo

Book a demo