Manufacturing maintenance software for Malaysian factories and production plants

Run PM on presses, moulding machines, boilers and goods lifts. Keep DOSH and Suruhanjaya Tenaga dates in view and take breakdown reports at the machine.

Book a demo
Updated 16 Oct 2026
FieldEx scheduling board on desktop with a technician's inspection checklist open on the mobile app, as used by plant maintenance teams

FieldEx is a field service and asset management (FSM+CMMS) application for Malaysian factories. The in-house maintenance team and outside contractors share one record per machine. FieldEx runs PM on running hours, cycles or dates, and tracks DOSH certificate of fitness dates for boilers, air receivers and lifts. It takes breakdown reports from the shop floor and keeps spare parts and costs against each machine.

What FieldEx does for Malaysian plant engineers

A Malaysian plant engineer looks after more than production machines. The boiler and air receivers need a DOSH CF, and the goods lift needs a monthly service. The electrical installation needs its competent person visits under Suruhanjaya Tenaga rules. FieldEx puts all of it on the same records as the presses and moulding machines, so nothing sits in a separate file. Book a demo to see it on your own factory.

Machines, utilities and plant rooms in one register

  • One record per press, injection moulding machine, CNC, conveyor and boiler. Air receivers, compressors, chillers, gensets and goods lifts get one too.
  • Each record holds the serial number, specs, photos, warranty and the manual attached.
  • Lines and machines broken into components, such as a press and its clutch, brake, motor and PLC, each with its own history, in Asset Management.
  • Machines grouped by factory, building or line, with statuses such as running, breakdown or under PM.
  • A QR or barcode sticker on each machine, and a log of every change with the user and the time.

PM on hours, strokes or dates

  • PM plans that start the job at a set number of running hours, strokes or cycles, a date, or whichever comes first, in Preventive Maintenance.
  • Separate checklists and technicians for daily, monthly and yearly PM on the same machine.
  • PM on a fixed calendar for shutdown weeks, or counted from the last completed job. Fixed calendar dates apply to time-based plans.
  • Each plan showing its machines with the last and next PM dates, and missed PM rescheduled after a set overdue period.

Breakdowns from the production floor

  • A QR sticker on each machine that opens a breakdown report without logging in, with photos or video.
  • Each report becoming a job in the backlog, assigned by skill, shift and leave to the right technician.
  • A warning when the same machine had a job only recently, so repeat failures come to light.
  • Response and repair targets counted in the factory's working hours, with a warning before a target is missed.

DOSH and Suruhanjaya Tenaga dates

  • CF dates for boilers, air receivers and lifting machinery, and competent person visits for the electrical installation, as recurring certifications and inspections on set frequencies.
  • Each one shown as due, overdue or done, with certification reminders by email, in the app or both.
  • The inspector, the date, the result and remarks, with the CF attached to its certification.
  • A dashboard of overdue items and those coming due within 7 days.

On the phone at the line

  • The FieldEx Mobile App for operators and technicians at the line.
  • The machine's past jobs, its checklist, number fields for readings, watermarked photos and a sign-off on each job.
  • LOTO steps as tasks in a fixed order, and tasks that must be ticked before the job can be closed.
  • Check-in and check-out on every task.

The maintenance store

  • Spare parts in each store and each technician's own stock, with transfers, barcode scanning and approvals.
  • Reorder and low-stock alerts per store, and a quick check of where a part is held, in Spare Parts Inventory.
  • Each part used logged against the job and the machine, with its price, manufacturer and warranty period.

The maintenance team's own tools, meters and workshop

  • Hand-held power tools, extension leads and chain blocks registered as company assets, with their own inspection cycles.
  • Test meters and torque wrenches with calibration dates, reminders and the certificate attached.
  • Workshop lathes, welding sets and the maintenance van on PM plans by date, hours or odometer.

Plant reports for management

  • Reports on each machine's reliability, maintenance cost, utilization and age, in Reporting and Analytics.
  • Job reports grouped by type, line, machine or month, to show PM against breakdown work.
  • Reports exported as CSV, Excel or PDF, or emailed to management on a set timetable.
  • Reports exported as CSV, Excel or PDF, or emailed to plant management on a schedule.

FieldEx also runs this kind of work for Oil & Gas and Telecom Infrastructure.

Which factory equipment needs a DOSH certificate of fitness, and how often is it inspected?

Steam boilers, pressure vessels such as air receivers, and lifting machinery such as overhead cranes, hoists and lifts. The CF Regulations 2024, P.U.(A) 99/2024, in operation since 1 June 2024, list them as plant requiring a certificate of fitness (CF). A CF is valid for 15 months from the date of inspection, so the periodical inspection has to happen before then. Boilers and pressure vessels are made available for internal inspection, unless a pressure vessel is designed not to need one, and lifting machinery is load tested. DOSH's Industrial Safety Division handles design verification and alteration approvals.

What FieldEx does about it

  • A CF date per item: each boiler, receiver and crane carries its CF as a recurring certification every 12 months, inside the 15-month validity. DOSH is recorded as the authority.
  • Shutdown planned ahead: a preparation job for cooling, draining and opening the boiler or receiver can be raised before the inspection, with its own checklist.
  • Approvals kept: design verification and alteration approval letters are attached to the item's record.
  • One list for the plant engineer: the dashboard shows which CFs are overdue or due within 7 days, by building or machine type.

Does a factory boiler need its own steam boiler engineer, or can a visiting engineer cover it?

A visiting engineer can cover up to 500 m² of heating surface, single or combined. Above that, an engineer is in charge. The Twelfth Schedule of the CF Regulations 2024 sets the bands.

Heating surfaceIn charge
100 m² or lessOperator grade 2
Over 100 to 200 m²Operator grade 1, each shift
Over 200 to 500 m²Operator grade 1, plus engineer grade 1 or 2 (may visit)
Over 500 to 2,000 m²Engineer grade 1 or 2
Over 2,000 m²Engineer grade 1

What FieldEx does about it

  • Visits as recurring jobs: the visiting engineer's rounds run on a PM plan, with each visit's checklist and readings recorded.
  • Outside engineers on the same record: visiting engineers can be set up as users with only the access they need. Their work lands on the boiler's history.
  • Readings as numbers: pressures, water levels and temperatures are entered as exact values on each visit.
  • Grade as a skill: boiler operator and engineer grades can be skills, so boiler jobs go only to people holding the right grade.

How often must a competent person visit and inspect a factory's electrical installation?

Monthly for an installation up to 600 volts on switchgear of 100 amperes or more, and twice a month above 600 and up to 11,000 volts. Those minimum visits are set by the Electricity Regulations 1994, as amended up to P.U.(A) 136/2014. Suruhanjaya Tenaga's Chargeman Page (issued 6 March 2026) lists the competencies a chargeman covers. They include inspection of main switchboard equipment and motor maintenance.

What FieldEx does about it

  • Monthly or twice-monthly visits: each installation's competent person visits run as a recurring inspection on the right frequency.
  • A checklist per visit: switchboard, motor and earthing checks are answered on the phone, and readings go into number fields on the job's custom form.
  • The visit record keeps the completion date, performer and result. Your electrical team can create a corrective job for any issue found.
  • Visit log for the auditor: each installation's record lists every completed visit with its date, the person and the result.

Who can be the competent person in control of a factory electrical installation?

One of the competent persons listed for the installation's voltage, on every shift the installation runs. For installations up to 600 volts, the Electricity Regulations 1994 name four roles: Electrical Services Engineer, Competent Electrical Engineer, Electrical Supervisor or resident Competent Electrical Engineer. Where the installation runs over two or more shifts, the owner needs the specified competent person on each shift. Suruhanjaya Tenaga's Chargeman Page says candidates pass theory, practical and oral examinations to be certified.

What FieldEx does about it

  • Competencies as skills: chargeman, wireman and electrical engineer grades can be set as skills, and electrical jobs go only to people with the matching skill.
  • Shift rosters: shift schedules, including overnight shifts, are assigned to people or groups, and assignment checks who is on shift.
  • Leave respected: approved leave is checked before a job is assigned.
  • Who did what: every job shows who was assigned, who checked in and when.

How often should press machines be inspected in a Malaysian factory?

Daily before use, monthly where the machine poses any danger to the operator, and yearly for the whole premises. DOSH's Guidelines on Safe Use of Press Machines (2015) set those three checks. The servicing schedule comes from the manufacturer's operating manual or recognized best practice. International guidance in UK HSE's HSG236 (second edition, 2003) adds a thorough examination of the press and its guards every 6 months. It is every 12 months where the tools are fenced only by fixed fencing.

What FieldEx does about it

  • Three cycles on each press: the daily pre-use check, the monthly inspection and the yearly inspection run as separate recurring inspections.
  • Manual-based PM: the servicing schedule from the press manufacturer's manual runs as a PM plan. Its checklists can be generated with AI from your existing checklist or procedure.
  • Operators on the daily check: operators scan the press's QR sticker and answer the daily checklist on the phone.
  • Monthly items flagged: the dashboard shows which presses have missed their monthly inspection.

When should press clutch, brake and motor parts be overhauled or replaced?

The clutch and brake lining is inspected and repaired every 5 years, and the main motor overhauled every 5 years. Drive parts and the motor are renewed at 15 years, and the PLC is replaced at 10 to 12 years. Those intervals come from the typical mechanical press example in DOSH's Press Machine Guidelines (2015), which defer to the manufacturer. UK HSE's HSG236 gives international guidance on the clutch. A positive key clutch on a press used regularly for single-stroke work on one shift a day is dismantled at least every 2 years.

What FieldEx does about it

  • Components with their own plans: the clutch, brake, main motor and PLC are components under the press, each with its own long-interval plan.
  • Multi-year cycles: maintenance plans with their own repeat frequency cover the 5-year overhaul, the 10 to 12-year PLC replacement and the 15-year renewal.
  • Age and lifecycle reports: asset reports show each component's age, so overhauls can be budgeted ahead.
  • Parts history: each part fitted is logged with its date, price and warranty period, against the component.

What should operators check on a machine before starting work?

A safety-features checklist and a visual inspection, covering guarding, sensors and limit switches in particular. DOSH's Machinery Safety Basic e-Guide on hand injury (2025) asks operators to complete that checklist before operating any machinery. DOSH's Press Machine Guidelines add a daily check before operations, to catch any sudden malfunction.

What FieldEx does about it

  • A pre-start checklist per machine type: guarding, sensor and limit switch questions are grouped into sections. Reference photos show what a good guard looks like.
  • Failed items reach maintenance: a failed answer raises a repair job with its tasks, linked to the machine.
  • Status updated from the checklist: the checklist can set the machine to breakdown, so supervisors see it is not to be run.
  • Proof the check was done: each completed checklist records the operator, the date and the answers.

What maintenance data should a factory collect after machine inspections?

Data showing which parts are replaced most often, and the specifics of each machine. DOSH's Press Machine Guidelines (2015) say inspection data should be organized that way, making future inspections more efficient. The Machinery Safety Basic e-Guide adds that unsafe conditions are reported to a superior in a written report.

What FieldEx does about it

  • Parts by machine: every part used on a job is recorded against the machine, and spare part reports show which parts are replaced most.
  • Each completed inspection records its date, person, result, remarks and linked checklist.
  • Unsafe conditions reported: a failed safety answer raises a follow-up job straight away.
  • Reliability reports: asset reports show reliability and maintenance cost per machine, so problem machines stand out.

What are DOSH's lockout/tagout steps before machine servicing?

Nine steps that isolate the machine from every energy source, including a test of the controls before work starts. DOSH's lockout/tagout infographic, Langkah-langkah Lockout/Tagout (steps for lockout/tagout), sets them out for any maintenance, upgrade or servicing work. International practice under the US OSHA standard 29 CFR 1910.147 adds an inspection of each energy control procedure at least once a year.

What FieldEx does about it

  • The nine steps as tasks: each LOTO step can be a task in an ordered procedure. The next step cannot start until the previous one is done.
  • Try-start recorded: the control test is its own task, confirmed on the phone before the work begins.
  • Locks off before closing: removing locks and restoring energy can be required tasks before the job can be closed.
  • A yearly LOTO review: each machine's LOTO procedure gets a recurring yearly inspection, with the reviewer recorded.

How often do goods lifts in a factory need servicing and examination?

A service and adjustment at least monthly, and a comprehensive examination at least every 3 months. The CF Regulations 2024 set both intervals for lifts and escalators. The owner also needs a service agreement with a competent person, running for at least one year.

What FieldEx does about it

  • Monthly and quarterly on one plan: a single PM plan runs the monthly service and the quarterly comprehensive examination, each with its own checklist.
  • The service agreement as a contract: the lift contract has start and end dates and is linked to the lift and its PM plan.
  • The CF alongside: the lift's CF runs as a 12-month certification on the same record, inside the 15-month validity.
  • Contractor work visible: the lift contractor's visits are recorded as jobs on the lift, so the factory sees each one.

How should a Malaysian plant record planned maintenance and downtime?

Log every breakdown and every planned job separately, then compare the split each month. International guidance from PNNL's Applying Key Performance Indicators (December 2020) gives benchmarks. It sets availability above 90%, with unplanned failures and shutdowns below 25% of planned ones. PNNL's Maintenance Approaches benchmarks (July 2021) give target ranges of 20-30% reactive, 25-35% preventive and 30-40% predictive work.

What FieldEx does about it

  • PM and breakdowns counted separately: each job has a type and shows whether a PM plan generated it, so reports split planned from reactive work.
  • Monthly trend reports: saved reports group jobs by type and month, and are emailed to management on a timetable.
  • Breakdown time logged: check-in and check-out times show how long each breakdown job took. FieldEx reports total downtime, MTBF and MTTR for every machine.
  • Status across the plant: the dashboard shows how many machines are running, under PM or in breakdown.

How often should the maintenance team's own power tools and extension leads be checked?

Before each use by the user, with a formal inspection and test at intervals set by risk. International practice from UK HSE, in Work Using Electrically Powered Equipment, suggests starting points for light industrial work. Tools get a formal visual inspection before first use and then every 6 months, and a combined inspection and test every 6 months to 1 year. The person testing should be trained and competent to do it.

What FieldEx does about it

  • Tools on the register: each grinder, drill, extension lead and chain block is an asset with its own QR sticker.
  • Six-monthly checks on time: the visual inspection and the inspection and test run as recurring inspections, with due dates and overdue status on the dashboard.
  • Failed tools held back: a failed answer sets the tool to out of service and opens its repair job.
  • Meters calibrated: test meters and torque wrenches carry their calibration as a recurring certification, with the certificate kept on the record.
Customer story

Agri Sumber Prestari (ASP) is an agricultural manpower and training company under SD Guthrie Agri Bio, with 92 estates running on FieldEx. It moved its machine maintenance off logbooks and paper checklists. Estates are not factories, but the work is the same: planned service, inspections and spares for every machine. Its story describes work orders, inspection checklists and SOPs generated automatically, and preventive maintenance triggered by usage or time. It also describes live dashboards of job progress and stock levels, with low-inventory alerts.

Read the Agri Sumber Prestari Story

Magnum moved its operations off paper forms and inventory sheets onto FieldEx. It works in leisure and entertainment, not manufacturing, but its maintenance started from the same place: paper forms and stock sheets. Its story describes four changes:

  • Work orders, inventory logs and reports generated automatically.
  • Reports sent out on the schedule the team sets.
  • Live tracking of team activity, stock levels and job progress.
  • SLA alerts as deadlines approach.
Read the Magnum Customer Story

FieldEx questions from Malaysian factory maintenance teams

Which manufacturing maintenance software suits a Malaysian factory?

One that runs PM, takes breakdown reports from operators and keeps DOSH and Suruhanjaya Tenaga dates and spares together. FieldEx does all of these. See our Maintenance Software Guide.

Can PM run on press strokes or machine cycles?

Yes. Meter units include cycles as well as hours, and plans can trigger on the meter, the date or whichever comes first.

Can operators use the app in Bahasa Malaysia or Chinese?

Yes. The mobile app is available in English, Bahasa Malaysia and Chinese.

Can FieldEx track CF dates for our boilers and air receivers?

Yes, as the CF section shows. Reminders go out by email, in the app or both, so the plant engineer can book the inspection in time.

Can we record the chargeman's monthly visits?

Yes, as recurring inspections. The chargeman can be set up as a user with only the access needed, so each visit lands on the installation's record.

Can technicians see the history of a machine before they start?

Yes. The app shows the machine's record, past jobs and parts used, and warns when the same machine had a recent job.

Can we see where a spare part is stored?

Yes. You can check part availability by store, zone or technician, with reorder and low-stock alerts for each location.

Can PM be fixed to our shutdown dates?

Yes. Fixed calendar schedules can be anchored to a date or weekday, and jobs can be created a set number of days before they are due.

Can management get maintenance reports without asking?

Yes. Saved reports can be emailed on a set timetable as CSV, Excel or PDF, and sent automatically to anyone else you choose.

How soon can our factory start on FieldEx?

There's no setup fee. Once we know your requirements and your data is ready, FieldEx can be implemented in as little as a week with standard features for small businesses. Larger setups and custom work take longer. Machines and parts can be uploaded. FieldEx helps with setup, and training is included. Onboarding is in person in Malaysia as well as online. See Setup and Training.

Put every machine's PM, CF dates and breakdowns on one record

Book a Demo