What Are the Most Important Maintenance KPIs to Track in a CMMS?

Find out which maintenance KPIs matter most in a CMMS, including MTBF, MTTR, Planned Maintenance Percentage, and backlog, with formulas and industry benchmarks.
The FieldEx Team
November 17, 2026
Header image

‍TL;DR: 

A CMMS collects thousands of timestamps, parts logs, and job statuses, but tracking everything turns into noise. The eight maintenance KPIs that actually matter fall into four areas: equipment reliability (MTBF, equipment downtime), response and repair speed (MTTR, first-time fix rate), schedule health (Planned Maintenance Percentage, preventive maintenance compliance, backlog), and parts efficiency (spare parts turnover). Start by tracking three or four consistently, clean up your work order logging first, and let your CMMS calculate them automatically rather than building monthly spreadsheets.

‍

A good CMMS (computerized maintenance management system) captures everything: when a fault was reported, who was assigned, how long the repair took, and which parts came off the shelf. The problem is that most maintenance teams either track nothing at all or drown in a 30-metric report that nobody reads.

KPIs are only useful when they tell you what to fix next. Below are the eight core maintenance KPIs worth tracking in a CMMS, how to calculate each one, what healthy targets look like, and how to stop bad data from skewing the numbers.

Quick reference: the 8 core CMMS KPIs

KPI What it measures Formula Typical target / benchmark
MTBF Average operating time between breakdowns Total uptime ÷ Number of failures Trending upward over time
MTTR Average time to repair and restore a failed asset Total repair downtime ÷ Number of repairs Under 2 to 5 hours (varies by asset)
Planned Maintenance Percentage (PMP) Share of maintenance hours spent on planned work (Planned hours ÷ Total maintenance hours) × 100 80% or higher
PM Compliance Scheduled maintenance jobs completed on time (PMs completed on time ÷ Total PMs due) × 100 90% or higher
Maintenance Backlog Overdue or waiting work measured in crew-weeks Total estimated backlog hours ÷ Weekly crew capacity 2 to 4 weeks of work
First-Time Fix Rate (FTFR) Jobs solved on the first visit without a return trip (Jobs fixed on first visit ÷ Total jobs) × 100 75 to 80% average; 88%+ top tier
Equipment Downtime Total hours critical assets are out of service Sum of unplanned + planned outage hours Under 5 to 10% of scheduled runtime
Spare Parts Turnover How fast stocked parts are used and replenished Annual parts consumption cost ÷ Average inventory value 2 to 4 turns per year (non-critical)

‍

1. Mean Time Between Failures (MTBF)

MTBF measures how reliably a piece of equipment runs before breaking down. It applies to repairable assets and tracks the average operating window between one unplanned failure and the next.

  • Why it matters: A falling MTBF is an early warning that preventive maintenance isn't catching wear early enough, or that an ageing asset is nearing the end of its economical life.
  • Watch out for: Mixing routine preventive stops into your failure count. Only count unplanned breakdowns that forced the asset out of service.

2. Mean Time to Repair (MTTR)

MTTR measures how quickly your team diagnoses, fixes, and returns a broken asset to normal operation once a failure occurs.

  • Why it matters: High MTTR usually points to slow dispatch, missing spare parts, or technicians arriving on site without the asset's fault history or repair checklist.
  • Watch out for: Inconsistent start and stop clocks. Decide whether MTTR starts when the fault is logged or when the technician checks in on site, and apply that rule across every job.

3. Planned Maintenance Percentage (PMP)

PMP shows what share of your team's maintenance hours goes toward scheduled, proactive work versus emergency firefighting.

  • Why it matters: Industry best practice aims for an 80/20 split: 80 percent planned maintenance and 20 percent reactive repairs. Teams stuck below 60 percent spend most of their week reacting to breakdowns rather than preventing them.
  • Watch out for: Technicians logging time under a generic "maintenance" job type. Separate your work order types clearly into Preventive Maintenance, Inspections, and Reactive Repairs so hours roll up cleanly.

4. Preventive Maintenance Compliance (PMC)

While PMP measures how much planned work you do, Preventive Maintenance Compliance measures whether you actually finish it on time.

  • Formula: (Scheduled PM work orders completed on time ÷ Total scheduled PM work orders due) × 100
  • Why it matters: A preventive schedule on paper means nothing if emergency calls constantly push scheduled visits into next month. Aim for 90 percent or higher within a defined grace window (for example, within 10 percent of the scheduled interval).
  • Watch out for: Closing overdue PMs late without recording that they missed their due window, or letting overdue recurring jobs pile up endlessly instead of using self-healing schedules when a cycle is missed.

5. Maintenance Backlog

Maintenance backlog measures how much approved maintenance work is waiting to be done, expressed in weeks of technician capacity rather than a raw count of open tickets.

  • Formula: Total estimated hours of open/overdue work orders ÷ Weekly available technician hours
  • Why it matters: A healthy backlog sits between 2 and 4 weeks. Too low means your team may be overstaffed. Climbing past 6 weeks means reactive work is crowding out planned maintenance, or you need more headcount or subcontractors.
  • Watch out for: Leaving cancelled or duplicate work orders open in your queue, which artificially inflates backlog numbers.

6. First-Time Fix Rate (FTFR)

FTFR tracks the percentage of repair jobs fully resolved on the technician's first visit, with no return trip required for the same fault.

  • Formula: (Jobs fixed on the first visit ÷ Total completed repair jobs) × 100
  • Why it matters: Every repeat visit doubles fuel, travel, and labor costs while frustrating the customer or site manager. Published benchmarks put the industry average around 75 to 80 percent, with top-performing teams reaching 88 percent or higher. (See our full breakdown on how to measure and improve first-time fix rate.)
  • Watch out for: Technicians closing an incomplete job and opening a brand-new ticket for the follow-up visit, which masks repeat trips.

7. Equipment Downtime

Equipment downtime measures the total time an asset is offline and unavailable for production or service. Split it into planned downtime (scheduled servicing) and unplanned downtime (unexpected breakdowns).

  • Formula: Sum of all hours an asset is out of operation during a given period
  • Why it matters: Unplanned downtime is the direct financial cost of maintenance failure. Tracking downtime per asset makes it obvious which specific machines are draining your budget and need replacement rather than another patch.
  • Watch out for: Counting out-of-hours time when a machine wouldn't be running anyway. Measure downtime against scheduled operating hours.

8. Spare Parts Inventory Turnover

Spare parts turnover tracks how often your stocked parts are consumed and replaced over a year.

  • Formula: Cost of spare parts used over 12 months ÷ Average inventory value
  • Why it matters: Too low means cash is tied up in slow-moving or obsolete stock sitting in warehouse bins or technician vans. Too high on critical components means you are running dangerously lean and risking stockouts that delay repairs.
  • Watch out for: Technicians grabbing parts from the shelf or van without logging them against a work order. If consumption isn't recorded at the job level, your turnover numbers and reorder points will always be wrong.

Why CMMS KPIs fail (and how to keep your data clean)

Most KPI initiatives fail in the first 60 days not because the formulas are wrong, but because the inputs are messy. Three habits fix 90 percent of bad reporting:

  1. Standardize work order types and fault codes. If one technician logs a failure as "broken" and another writes "won't start," you cannot run reliable failure reports. Use mandatory fault and resolution picklists tied to each asset type.
  2. Require check-in/check-out and parts logging before job close. If technicians can close a work order without recording time on task, parts consumed, or mandatory checklist steps, your MTTR and inventory numbers become guesswork.
  3. Start with three metrics, not eight. Pick the three KPIs tied to your biggest operational headache right now (such as MTTR, PM Compliance, and FTFR) and review them monthly before adding more.

How FieldEx tracks maintenance KPIs automatically

FieldEx combines CMMS (computerized maintenance management system) and FSM (field service management) in one system, capturing KPI data automatically as technicians complete work on web, iOS, or Android:

  • Automatic asset analytics: Every asset record calculates MTBF, MTTR, last maintenance date, and next scheduled service directly from its completed work order history.
  • Live CMMS Dashboard: View overdue work, jobs due in the next seven days, completed maintenance, compliance records, and fleet status in one screen, filterable by asset type, technician group, or service zone.
  • SLA response and resolution timers: On Enterprise plans, track response and resolution targets against business-hours calendars with automated alerts before an SLA is breached.
  • End-to-end parts and time tracking: Task-level check-in/check-out records exact labor time, while warehouse-to-van-to-job transfers keep spare parts consumption auditable.
  • Built-in reporting and Power BI connector: Build operational reports directly in FieldEx or connect live data to Microsoft Power BI for custom executive dashboards.

Ready to retire your maintenance spreadsheets?

Good KPIs come from clean, consistent field data, not complicated spreadsheets. When work orders, parts usage, and preventive schedules live in one place, tracking MTBF, MTTR, and compliance becomes part of how your team works every day.

Try FieldEx free for 14 days with no credit card required, or book a demo with our team to see how it fits your current maintenance workflow.

‍

Frequently asked questions

What are the most important KPIs to track in a CMMS? 

For most maintenance teams, the core five are Mean Time Between Failures (MTBF), Mean Time to Repair (MTTR), Planned Maintenance Percentage (PMP), Preventive Maintenance Compliance, and First-Time Fix Rate (FTFR). Together, they cover equipment reliability, repair speed, and schedule discipline.

What is the difference between MTBF and MTTR? 

MTBF (Mean Time Between Failures) measures reliability, or how long an asset runs between breakdowns. MTTR (Mean Time to Repair) measures responsiveness, or how quickly your team fixes the asset once it breaks. You want MTBF to go up and MTTR to go down.

What is a good Planned Maintenance Percentage? 

World-class maintenance teams aim for 80 percent or higher, meaning at least four out of every five maintenance hours are spent on scheduled preventive work rather than emergency repairs.

How many maintenance KPIs should a small team track?

Start with three to four. Tracking too many metrics at once creates administrative overhead for technicians and reporting noise for managers. Master your core reliability and schedule KPIs first, then expand as your data hygiene improves.

How does a CMMS calculate MTBF and MTTR automatically? 

Every time a reactive repair work order is logged, worked on, and closed against an asset, the CMMS records the timestamps between breakdowns and the duration of the repair. Platforms like FieldEx use that accumulated job history to update MTBF and MTTR automatically on each asset's record.

About the Author

Dashboard mockup

The FieldEx Team

FieldEx is field service management (FSM) and CMMS software in one platform, for teams that send technicians to sites and maintain equipment.